Robertsons Ready Mix has held an industrial stormwater permit for the site since March 2012. Its industry is listed as construction sand and gravel. Its runoff was over the state benchmark for nitrate and nitrite in 2023-24. Under its stormwater permit it is at Exceedance Response Action Level 2 for nitrate and nitrite, which means it must file an action plan with the state.
2266 Willow Glen Dr, El Cajon
Industrial stormwater
During the 2023-2024 rainy season, the site exceeded the benchmark set by the state for nitrate and nitrite.
Its yearly average for nitrate and nitrite was 44 times the benchmark.
Clean WaterIndustrial stormwater
Over a state benchmark
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Rain and sampling in 2023-24
The facility sampled 1 of the 17 storms of a tenth of an inch or more near the site in 2023-24.
The permit generally requires samples from four storms a year, with few exceptions.
What the samples show
The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.
Yearly average, over
Yearly average, within
Single lab result
State benchmark
Over the benchmark in 2023-24
Pollutant2023-24 averageBenchmarkLast five years
Nitrate and nitrite
30 mg/L1 result
0.68 mg/L
Over in 1 of 1 year tested
Exceedance Response Action Level 2
All results for nitrate and nitrite
Feeds algae blooms that strip oxygen from creeks and lagoons.
2 results as a table
Sampled
Drainage area
Result
Feb 6, 2024
Outfall 1
30 mg/L
Jan 7, 2016
Outfall 1
3.7 mg/L
Tested once or twice and within the benchmark: pH, suspended solids, oil and grease.
Rain and sampling by year
The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.
Day with rain
Day sampled
2025-26
0 of 7 storms sampledTold the state: not enough qualifying storms occurred; another reason
2024-25
0 of 9 storms sampledTold the state it did not sample every required storm
2023-24
1 of 17 storms sampledTold the state it did not sample every required storm
2022-23
0 of 18 storms sampledTold the state it did not sample every required storm
2021-22
0 of 14 storms sampledTold the state it did not sample every required storm
2020-21
0 of 10 storms sampledTold the state it did not sample every required storm
JulAugSepOctNovDecJanFebMarAprMayJun
Rainfall comes from the daily records of NOAA station El Cajon (USC00042706), 3.4 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
Location and details
Where the runoff goes
The facility reports that rain running off it drains to Sweetwater River.
Storm drains carry this runoff to creeks and the ocean without treatment.
The neighborhood
About 2,704 people live in the neighborhood around this site in El Cajon. The state scores it above 12% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6073015406. The score covers the whole neighborhood and does not measure this site's own effect.
Same operator
Robertsons Ready Mix holds 50 other stormwater permits: