What the colors mean

The six colors

A site's dot takes the most serious standing under any of its programs, in this order. Data as of November 23, 2026.

  1. Identified environmental concernsA recent result or record shows a problem under at least one environmental protection program.
  2. Missing samplesThe stormwater permit requires runoff samples, and the site filed none since its first were due, none in the last three years, or fewer than required in the latest reporting year though enough storms fell.
  3. Told to get a permitThe state told the site it needs a stormwater permit, and none is on file.
  4. No identified environmental concernsThe recent records show no problem, or the site's stormwater permit is too new to be due for samples.
  5. No public monitoring dataNo monitoring results are public for this permit, so we are unable to analyze its environmental impact through data.
  6. Claims no pollutant exposureThe site told the state that none of its activities are exposed to rain (a No Exposure Certification), or no program we cover requires it to test.

A reporting year runs from July 1 to June 30. The stormwater colors use the last three complete reporting years, 2023-24, 2024-25, and 2025-26. See every site in California by county.

Identified environmental concerns

1,643 of the 23,667 sites in California have this color on the map.

Industrial stormwater: over a state benchmark

We take the most recent of the last three complete reporting years (2023-24, 2024-25, and 2025-26) in which the site filed lab results. The site has this color if any pollutant in that year failed one of the permit's two tests:

  • the average of all the year's results for the pollutant is above its annual benchmark; or
  • for suspended solids, oil and grease, and pH, two or more results in the year are above the instantaneous maximum, or outside the allowed pH range.

Only samples of stormwater leaving the site count, from July 1, 2015 on. A result reported twice counts once. As the permit directs, a result below the lab's reporting limit counts as zero in the average.

A benchmark is a warning threshold. It is not a legal limit. When a site goes over one, the permit requires the facility to look for the cause and improve its pollution controls, so this color is not by itself a breach of the permit.

The Industrial General Permit's benchmarks, in milligrams per liter (pH in pH units)
PollutantAnnual averageInstantaneous maximum
pH-Outside 6 to 9
Suspended solids100400
Oil and grease1525
Zinc0.26-
Copper0.0332-
Lead0.262-
Iron1-
Aluminum0.75-
Nitrate and nitrite0.68-
Chemical oxygen demand120-
Phosphorus2-
Ammonia2.14-
Magnesium0.064-
Arsenic0.15-
Cadmium0.0053-
Nickel1.02-
Mercury0.0014-
Selenium0.005-
Silver0.0183-
Cyanide0.022-
Biochemical oxygen demand30-

Scrap metal yards in the Santa Ana region have their own permit from the Santa Ana Water Board, Order R8-2018-0069. We compare their results with that permit's action levels. A yard has this color if, in that year, a pollutant's geometric mean is above its action level, or any single result is more than twice the action level. For pH, any result outside 6.5 to 8.5 counts. Going over an action level means the yard must make a plan to fix it. It is not a violation by itself.

Air: failed an emissions test or was cited

Federal records show the site failed an emissions test, or was cited for a violation, in the last five years.

Hazardous waste: violations in the last three years

Federal records show a hazardous waste violation at the site in the last three years.

Missing samples

4,146 of the 23,667 sites in California have this color on the map.

Industrial stormwater: missing samples

The site has a stormwater permit that requires runoff samples, and it has not filed enough of them. It has filed no lab results since its first were due, or none in any of the last three complete reporting years (2023-24, 2024-25, and 2025-26), or fewer in the latest complete reporting year than the permit requires, though enough storms of a tenth of an inch or more fell near it to take them.

The permit asks for samples from two storms in each half of the reporting year (July to December and January to June), and fewer from a site in a compliance group or on a reduced sampling schedule. It gives 30 days after the lab results come back to file them. No public record shows when that was, so we allow 28 days for the lab and count a storm against a site 58 days after it ends.

There can be a lawful reason. The permit asks for samples only from storms that make the site discharge runoff, so a dry stretch or a site that holds its stormwater, for example, can leave nothing to sample.

To show how many chances a site had, its page counts the storms recorded at the nearest NOAA weather station with a full record. A day with a tenth of an inch or more of rain is a wet day. Wet days with fewer than two dry days between them make one storm, and a storm counts when its total is a tenth of an inch or more. A year or half-year counts against a site only when at least as many of these storms fell as samples are missing. The permit defines a storm by whether the site discharges, which no public record shows, so this count is an estimate.

A scrap metal yard under the Santa Ana Water Board's permit also has this color when it filed samples only from a point the permit does not use for compliance, such as before its runoff soaks into an infiltration bed. There are no results to compare with the permit's action levels. Its page says so.

Told to get a permit

2,538 of the 23,667 sites in California have this color on the map.

Industrial stormwater: told to get a permit

A state agency told the site it needs coverage under the stormwater permit, or a No Exposure Certification, and the state's records show neither on file. The state lists these sites as "NOI Required" or "NEC Required".

No identified environmental concerns

2,916 of the 23,667 sites in California have this color on the map.

Industrial stormwater: within the state benchmarks

In the most recent of the last three complete reporting years (2023-24, 2024-25, and 2025-26) with lab results, every pollutant passed both of the permit's tests. The color covers only the pollutants the site tested for and the samples it filed. The site may not have tested for every pollutant the permit requires, and many sites do not.

A site whose stormwater permit is too new to be due for samples, and that has filed none yet, also has this color. Its page says the permit is new. The permit asks for samples from the first storm after coverage begins, and gives 30 days from receiving the lab report to file the results. As above, we allow 28 days for the lab, so a permit counts as new until 58 days after its first storm ends. Where no rain gauge near the site has a full record, a permit counts as new for a year after it started. Once the site files lab results, its color follows them like any other site's.

Air: no violations in federal records

Federal records show no failed emissions test and no violation at the site in the last five years.

Hazardous waste: no violations in the last three years

Federal records show no hazardous waste violation at the site in the last three years.

No public monitoring data

1,634 of the 23,667 sites in California have this color on the map.

Some Clean Water Act permits have no public monitoring results that can be compared with a limit. A site has this color when it holds such a permit and none of its other records shows anything more serious. We are unable to analyze the permit's environmental impact through data, so the color is neutral and is never counted as a problem.

Construction stormwater: no discharge results

The site filed no discharge results in the last 12 months. A site samples only when a storm makes it discharge, and sites at Risk Level 1, the lowest, do not sample.

Treatment plants and factories: no public monitoring data

Neither the Water Boards' self-monitoring reports nor the EPA's files have monitoring results for the facility's permit.

Municipal storm drains: results only in annual reports

Storm drain permits require cities and counties to monitor, to report on their programs, and to improve them over time. The monitoring results are in each permit holder's annual reports, not in a public data set we can check. Results measured in creeks, bays, and the ocean are not counted as violations of these permits. A storm drain permit's page shows the permit, the area it covers, its Regional Water Board, and any enforcement actions.

Claims no pollutant exposure

10,790 of the 23,667 sites in California have this color on the map.

Industrial stormwater: claims no pollutant exposure

The facility filed a No Exposure Certification. It told the state that its industrial materials and activities are not exposed to rain or runoff, so the permit does not require samples. EarthSpotter shows the claim as it was filed.

Air: releases on file, no federal compliance records

The site reports what it releases to the air, but the EPA's air compliance records have no entry for it.

Sites that no program on EarthSpotter covers yet are also gray. If you see or smell pollution at one, send us a report.