EarthSpotterEarthSpotter

Holliday Rock Chino 18

5150 Schaefer Ave, Chino, CA 91710

Holliday Rock Co Inc has held an industrial stormwater permit for the site since September 2012. Its industry is listed as ready-mixed concrete. Every pollutant it tested in 2025-26 averaged within the state benchmarks.

5150 Schaefer Ave, Chino

Industrial stormwater

During the 2025-2026 rainy season, every pollutant this site tested in its runoff averaged within the state's benchmarks.

That is based on 8 lab results from 2 storm days.

Clean WaterIndustrial stormwater

Within the state benchmarks

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 2 of the 11 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. This site says it qualifies for a reduced schedule. The facility told the state it missed storms for another reason.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2025-26

pH

8 to 92 results

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

13 results as a table
SampledDrainage areaResult
Feb 17, 2026DP#19
Nov 18, 2025DP#18
Feb 14, 2025DP#17
Feb 20, 2024DP#17
Feb 2, 2024DP#17
Mar 14, 2023DP#17
Nov 8, 2022DP#17
Apr 10, 2020DP#16
May 22, 2019S/E Entrance9
Feb 4, 2019S/E Entrance6
Dec 7, 2018S/E Entrance6
Jan 9, 2018S/E Entrance8
Jan 5, 2016S/E Entrance6

Suspended solids

20 mg/L2 results

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

13 results as a table
SampledDrainage areaResult
Feb 17, 2026DP#120 mg/L
Nov 18, 2025DP#119 mg/L
Feb 14, 2025DP#113 mg/L
Feb 20, 2024DP#1Not detected
Feb 2, 2024DP#117 mg/L
Mar 14, 2023DP#112 mg/L
Nov 8, 2022DP#1Not detected
Apr 10, 2020DP#10.65 mg/L
May 22, 2019S/E Entrance12 mg/L
Feb 4, 2019S/E Entrance2.8 mg/L
Dec 7, 2018S/E EntranceNot detected
Jan 9, 2018S/E Entrance5.5 mg/L
Jan 5, 2016S/E Entrance1.7 mg/L

Oil and grease

Not detected2 results

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

12 results as a table
SampledDrainage areaResult
Feb 17, 2026DP#1Not detected
Nov 18, 2025DP#1Not detected
Feb 14, 2025DP#1Not detected
Feb 20, 2024DP#1Not detected
Feb 2, 2024DP#1Not detected
Mar 14, 2023DP#1Not detected
Nov 8, 2022DP#1Not detected
Apr 10, 2020DP#12.8 mg/L
May 22, 2019S/E EntranceNot detected
Feb 4, 2019S/E EntranceNot detected
Dec 7, 2018S/E EntranceNot detected
Jan 9, 2018S/E EntranceNot detected

Iron

0.84 mg/L2 results

1 mg/L

All results for iron

Settles out as rust-colored sludge that smothers creek beds. The state took its iron benchmark from a 2008 EPA benchmark that the EPA has since stopped using.

13 results as a table
SampledDrainage areaResult
Feb 17, 2026DP#10.7 mg/L
Nov 18, 2025DP#10.98 mg/L
Feb 14, 2025DP#10.43 mg/L
Feb 20, 2024DP#10.2 mg/L
Feb 2, 2024DP#10.19 mg/L
Mar 14, 2023DP#10.43 mg/L
Nov 8, 2022DP#10.4 mg/L
Apr 10, 2020DP#10.12 mg/L
May 22, 2019S/E Entrance0.16 mg/L
Feb 4, 2019S/E EntranceNot detected
Dec 7, 2018S/E EntranceNot detected
Jan 9, 2018S/E Entrance0.25 mg/L
Jan 5, 2016S/E Entrance0.000042 mg/L

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. This site told the state it qualifies for a reduced schedule with fewer samples. When a site samples fewer than its schedule asks, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

2 of 11 storms sampledTold the state: another reason

2024-25

1 of 6 storms sampledTold the state it did not sample every required storm

2023-24

2 of 13 storms sampledTold the state it did not sample every required storm

2022-23

2 of 14 storms sampledTold the state it did not sample every required storm

2021-22

0 of 6 storms sampledTold the state it did not sample every required storm

2020-21

0 of 7 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station Chino Airport (USW00003179), 4.3 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to San Antonio Channel.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 4,929 people live in the neighborhood around this site in Chino. The state scores it above 73% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6071000504. The score covers the whole neighborhood and does not measure this site's own effect.

Same operator

Holliday Rock Co Inc holds 41 other stormwater permits:

Permits and IDs

Industry
Ready-Mixed Concrete
Operator
Holliday Rock Co Inc
Covered by
Industrial stormwater permit
Stormwater permit since
September 2012
Site size
4.67 acres
Paved or roofed
70% of the site
State stormwater ID
8 36I023828

The state stormwater record

Other sites nearby

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report