Industrial stormwater
This site has filed no samples of its runoff since the current permit began in 2015.
The permit requires testing. It has filed no results for the last three years, so there is no public record of what its runoff contains.
257 Longden Ave, Irwindale, CA 91706
Holliday Rock Co Inc has held an industrial stormwater permit for the site since May 2005. Its industry is listed as asphalt paving mixtures and blocks. The permit requires samples of its runoff, and it has filed none since the current permit began in 2015. The site is in a watershed with a state cleanup plan for nitrogen, phosphorus, mercury, trash, organochlorine pesticides and pcbs, for metals, and for nutrients.
257 Longden Ave, Irwindale
This site has filed no samples of its runoff since the current permit began in 2015.
The permit requires testing. It has filed no results for the last three years, so there is no public record of what its runoff contains.
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
The facility sampled none of the 12 storms of a tenth of an inch or more near the site in 2025-26.
The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because all stormwater was retained on site.
The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.
0 of 12 storms sampledTold the state: all stormwater was retained on site
0 of 11 storms sampledTold the state it did not sample every required storm
0 of 17 storms sampledTold the state it did not sample every required storm
0 of 21 storms sampledTold the state it did not sample every required storm
0 of 11 storms sampledTold the state it did not sample every required storm
0 of 7 storms sampledTold the state it did not sample every required storm
Rainfall comes from the daily records of NOAA station San Gabriel Canyon Ph (USC00047776), 6.1 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
The facility reports that rain running off it drains to Rio Hondo River.
The site sits in a watershed with a state cleanup plan for nitrogen, phosphorus, mercury, trash, organochlorine pesticides and pcbs, metals, and nutrients.
Storm drains carry this runoff to creeks and the ocean without treatment.
About 1,377 people live in the neighborhood around this site in Baldwin Park. The state scores it above 90% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6037404600. The score covers the whole neighborhood and does not measure this site's own effect.
Holliday Rock Co Inc holds 41 other stormwater permits:
Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.