Weiss operates the site. Its discharge was above the permit's action level on 1 day in the last 12 months.

75 Horseshoe Hill Road, Bolinas

Construction stormwater

On 1 day in the last 12 months, a discharge from this construction site was above the permit's action level for turbidity.

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge. The permit does not count a day above an action level as a violation. The Water Board has recorded no violations and taken no enforcement actions here.

Clean WaterConstruction stormwater

Above the permit's action level

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Construction stormwater permit
Risk level
Risk level 3The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
November 2024
Disturbed area
3.27 acres
Project
Residential
Drains to
Bolinas Lagoon
State permit ID
2 21C405531

Days above the permit's action level

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.

DateDischarge pointMeasureDay's valueLevel
Jan 5, 2026Sample Point #3Turbidity1,000 NTUabove 250 NTU
Nov 13, 2025Sample Point #3Turbidity293 NTUabove 250 NTU
Mar 14, 2025Sample Point #1Turbidity632 NTUabove 250 NTU
Mar 14, 2025Sample Point #2Turbidity669 NTUabove 250 NTU
Feb 13, 2025Sample Point #1Turbidity424 NTUabove 250 NTU
Dec 16, 2024Sample Point #1Turbidity975 NTUabove 250 NTU
All field readings (29)
DateDischarge pointpHTurbidity
Nov 16, 2026Sample Point #3817 NTU
Nov 13, 2026Sample Point #38.422 NTU
Apr 21, 2026Sample Point #37.240 NTU
Apr 20, 2026Sample Point #37.517 NTU
Mar 2, 2026Sample Point #37.716 NTU
Feb 24, 2026Sample Point #37.922 NTU
Feb 19, 2026Sample Point #37.184 NTU
Feb 17, 2026Sample Point #36.774 NTU
Jan 5, 2026Sample Point #37.51,000 NTU
Dec 23, 2025Sample Point #37.143 NTU
Dec 22, 2025Sample Point #37.597 NTU
Dec 19, 2025Sample Point #37.323 NTU
Nov 17, 2025Sample Point #36.7112 NTU
Nov 13, 2025Sample Point #38.2293 NTU
Nov 5, 2025Sample Point #38.335 NTU
Oct 14, 2025Sample Point #38.261 NTU
Mar 14, 2025Sample Point #18.4632 NTU
Mar 14, 2025Sample Point #28669 NTU
Feb 24, 2025Sample Point #18.3115 NTU
Feb 13, 2025Sample Point #17.6424 NTU
Feb 11, 2025Sample Point #3827 NTU
Feb 10, 2025Sample Point #17.722 NTU
Feb 6, 2025Sample Point #17.966 NTU
Feb 3, 2025Sample Point #17.46.1 NTU
Jan 13, 2025Sample Point #18.449 NTU
Jan 6, 2025Sample Point #17.266 NTU
Dec 31, 2024Sample Point #17.62.8 NTU
Dec 23, 2024Sample Point #17.8103 NTU
Dec 16, 2024Sample Point #18.1975 NTU

Violations the Water Board recorded

None

Enforcement actions

None

Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.

Location and details

The neighborhood

About 1,627 people live in the neighborhood around this site in Bolinas. The state scores it above 9% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6041132100. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Operator
Weiss
Covered by
Construction stormwater permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report