EarthSpotterEarthSpotter

Pine Mountain Tanks Phase 2 Tank Construction Project MMWD

Between Sky Oaks Rd and Concrete Pipe Rd, Fairfax, CA 94930

Marin Municipal Water District, a special district, operates the site. Its discharge was above the permit's action level on 4 days in the last 12 months.

Between Sky Oaks Rd and Concrete Pipe Rd, Fairfax

Construction stormwater

On 4 days in the last 12 months, a discharge from this construction site was above the permit's action level for pH and turbidity.

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge. The permit does not count a day above an action level as a violation. The Water Board has recorded no violations and taken no enforcement actions here.

Clean WaterConstruction stormwater

Above the permit's action level

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Construction stormwater permit
Risk level
Risk level 3The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
June 2025
Disturbed area
1.15 acres
Project
Industrial
State permit ID
2 21C407352

Days above the permit's action level

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.

DateDischarge pointMeasureDay's valueLevel
Jan 5, 2026DL02Turbidity981 NTUabove 250 NTU
Jan 5, 2026DL05Turbidity1,000 NTUabove 250 NTU
Jan 5, 2026DL06Turbidity1,000 NTUabove 250 NTU
Dec 26, 2025DL01Turbidity292 NTUabove 250 NTU
Dec 23, 2025DL01pH6.4below 6.5
Dec 23, 2025DL01Turbidity453 NTUabove 250 NTU
Dec 22, 2025DL01pH5.2below 6.5
Dec 22, 2025DL01Turbidity298 NTUabove 250 NTU
Nov 5, 2025DL01Turbidity501 NTUabove 250 NTU
All field readings (13)
DateDischarge pointpHTurbidity
Jan 7, 2026DL018.428 NTU
Jan 5, 2026DL017.7160 NTU
Jan 5, 2026DL027.8981 NTU
Jan 5, 2026DL047.289 NTU
Jan 5, 2026DL057.81,000 NTU
Jan 5, 2026DL067.81,000 NTU
Jan 2, 2026DL018.3128 NTU
Dec 26, 2025DL018292 NTU
Dec 24, 2025DL017.7234 NTU
Dec 23, 2025DL016.4453 NTU
Dec 22, 2025DL015.2298 NTU
Nov 5, 2025DL018.2501 NTU
Nov 5, 2025DL04890 NTU

Violations the Water Board recorded

None

Enforcement actions

None

Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.

Location and details

The neighborhood

About 4,987 people live in the neighborhood around this site in Fairfax. The state scores it above 7% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6041114100. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Operator
Marin Municipal Water District
Covered by
Construction stormwater permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report