Industrial wastewater
This facility reports monitoring results to the state.
The permit's limits are not available to compare them with. The Water Board took 33 enforcement actions, 13 of which required a penalty.
830 Loring Avenue, Crockett, CA 94525
C&H Sugar operates the site. Its industry is listed as food processing. It reports monitoring results to the state.
830 Loring Avenue, Crockett
This facility reports monitoring results to the state.
The permit's limits are not available to compare them with. The Water Board took 33 enforcement actions, 13 of which required a penalty.
Clean Water Act. Source: California State Water Resources Control Board and U.S. Environmental Protection Agency, data as of November 25, 2026.
| Permit | Type | Status | Effective | Expires |
|---|---|---|---|---|
| CA0005240Order R2-2026-0019 | Individual permit | Active | Oct 1, 2026 | Sep 30, 2031 |
| CA0038849Order R2-2012-0084 | Co-permittee | Active, past its expiration dateThe permit stays in force until the Water Board renews it. | Jan 1, 2013 | Dec 31, 2017 |
| CA0005240Order R2-2018-0012 | Individual permit | EndedEnded Sep 30, 2026. | Jun 1, 2018 | Jun 30, 2023 |
Results the facility reported to the state for the last three years, one row per pollutant as the permit lists them. A pollutant over its limit opens to each value over: which limit, where, and when. Each month shows the monthly average the facility reported, or the highest result that month when it filed no average.
| Parameter | Latest result | History |
|---|---|---|
| pHAt EFF-001 and EFF-002 | ||
| Total coliformEFF-002 | Not detectedSep 30, 2026 | |
| Total suspended solidsAt EFF-002, in mg/L and lb/day | ||
| Biochemical oxygen demand (BOD)At EFF-001 and EFF-002 | ||
| CyanideEFF-002 | 20 ug/LSep 20, 2026 | |
| Acute toxicitySurvival (Rainbow Trout), EFF-002 | 100 % survivalSep 14, 2026 | |
| Ammonia (as N)EFF-002 | 0.36 mg/LSep 1, 2026 | |
| Copper, totalEFF-002 | 5.3 ug/LAug 4, 2026 | |
| Lead, totalEFF-002 | 0.31 ug/LAug 4, 2026 | |
| Mercury, totalEFF-002 | 0.0034 ug/LJul 1, 2026 | |
| Oil and greaseEFF-002 | Not detectedJul 1, 2026 | |
| EnterococciEFF-002 | Not detectedJul 1, 2026 | |
| 1,2-DiphenylhydrazineEFF-002 | Not detectedJan 5, 2026 | |
| 1,2,4-TrichlorobenzeneEFF-002 | Not detectedJan 5, 2026 | |
| 2-ChloronaphthaleneEFF-002 | Not detectedJan 5, 2026 | |
| 2-ChlorophenolEFF-002 | Not detectedJan 5, 2026 | |
| 2-NitrophenolEFF-002 | Not detectedJan 5, 2026 | |
| 2,4-DichlorophenolEFF-002 | Not detectedJan 5, 2026 | |
| 2,4-DimethylphenolEFF-002 | Not detectedJan 5, 2026 | |
| 2,4-DinitrophenolEFF-002 | Not detectedJan 5, 2026 | |
| 2,4-DinitrotolueneEFF-002 | Not detectedJan 5, 2026 | |
| 2,4,6-TrichlorophenolEFF-002 | Not detectedJan 5, 2026 | |
| 2,6-DinitrotolueneEFF-002 | Not detectedJan 5, 2026 | |
| 3,3'-DichlorobenzidineEFF-002 | Not detectedJan 5, 2026 | |
| 4-Bromophenyl Phenyl EtherEFF-002 | Not detectedJan 5, 2026 | |
| 4-Chloro-3-methylphenolEFF-002 | Not detectedJan 5, 2026 | |
| 4-Chlorophenyl Phenyl EtherEFF-002 | Not detectedJan 5, 2026 | |
| 4-NitrophenolEFF-002 | Not detectedJan 5, 2026 | |
| 4,4'-DDDEFF-002 | Not detectedJan 5, 2026 | |
| 4,4'-DDEEFF-002 | Not detectedJan 5, 2026 | |
| 4,4'-DDTEFF-002 | Not detectedJan 5, 2026 | |
| 4,6-Dinitro-2-methylphenolEFF-002 | Not detectedJan 5, 2026 | |
| AcenaphtheneEFF-002 | Not detectedJan 5, 2026 | |
| AcenaphthyleneEFF-002 | Not detectedJan 5, 2026 | |
| AldrinEFF-002 | Not detectedJan 5, 2026 | |
| Alpha-BHCEFF-002 | Not detectedJan 5, 2026 | |
| AnthraceneEFF-002 | Not detectedJan 5, 2026 | |
| Antimony, totalEFF-002 | 1.1 ug/LJan 5, 2026 | |
| Arsenic, totalEFF-002 | 1.1 ug/LJan 5, 2026 | |
| BenzidineEFF-002 | Not detectedJan 5, 2026 | |
| Benzo(a)anthraceneEFF-002 | Not detectedJan 5, 2026 | |
| Benzo(a)pyreneEFF-002 | Not detectedJan 5, 2026 | |
| Benzo(b)fluorantheneEFF-002 | Not detectedJan 5, 2026 | |
| Benzo(ghi)peryleneEFF-002 | Not detectedJan 5, 2026 | |
| Benzo(k)fluorantheneEFF-002 | Not detectedJan 5, 2026 | |
| Beryllium, totalEFF-002 | Not detectedJan 5, 2026 | |
| Beta-BHCEFF-002 | Not detectedJan 5, 2026 | |
| Bis (2-Chloroethoxy) MethaneEFF-002 | Not detectedJan 5, 2026 | |
| Bis (2-Chloroethyl) EtherEFF-002 | Not detectedJan 5, 2026 | |
| Bis (2-Chloroisopropyl) EtherEFF-002 | Not detectedJan 5, 2026 | |
| Bis(2-ethylhexyl) phthalateEFF-002 | Not detectedJan 5, 2026 | |
| Butylbenzyl PhthalateEFF-002 | Not detectedJan 5, 2026 | |
| Cadmium, totalEFF-002 | Not detectedJan 5, 2026 | |
| ChlordaneEFF-002 | Not detectedJan 5, 2026 | |
| Chromium (Total)EFF-002 | 0.62 ug/LJan 7, 2026 |
Monthly reports the facility filed with the EPA, compared with the permit's limit for the same measure. A value counts only when it was detected and the limit was in force on that date.
Not available
Not available. The Water Board's violation records for this kind of facility are not published as data we can read.
Notices, orders, and penalties the Water Board issued.
| Date | Action | Details | Penalty |
|---|---|---|---|
| Nov 24, 2025 | Administrative Civil LiabilityOrder R2-2025-1022 | Order resolves all the violations alleged herein by the imposition of administrative civil liability against C&H in the amount of $734,000.Status: Active | Penalty required |
| Oct 27, 2025 | CWA 309G2B AO For Class II Penalties | Penalty required | |
| Jan 16, 2025 | CWA 309A AO For Compliance | ||
| Nov 29, 2022 | Notice of Violation | Status: Active | |
| Jun 28, 2022 | Notice of Violation | Notice of Violation for insufficient BMPs during docks renovations constructionStatus: Historical | |
| Nov 11, 2020 | Administrative Civil LiabilityOrder R2-2020-1030 | MMPThe Water Board marks this as a mandatory minimum penalty.Status: Historical | Penalty required |
| Nov 9, 2020 | Notice of Violation | Status: Historical | |
| Jan 23, 2020 | Administrative Civil LiabilityOrder R2-2020-1007 | MMPThe Water Board marks this as a mandatory minimum penalty.Status: Historical | Penalty required |
| Aug 31, 2016 | Administrative Civil LiabilityOrder R2-2016-1018 | MMPThe Water Board marks this as a mandatory minimum penalty.Status: Historical | Penalty required |
| Apr 25, 2016 | Oral Communication | Phone notification 4/25/16. Five day follow-up 4/29/16. See details in April 2016 SMR cover letter under the Attachments tab.Status: Historical | |
| Jan 23, 2015 | Notice of Violation | Status: Historical | |
| Feb 1, 2013 | Oral Communication | By reporting a MDEL of 11 ug/L on 12/5/12, C&H violated Order No. R2-2007-0032 (MDEL = 9.7 ug/L). Although the new permit (Order No. R2-2012-0084) has a higher MDEL (67 ug/L), the new limit didn't apply to this violation becasue the violation took place before the new permit became effective. This was explained to the Discharger via an email dated 2/1/2013.Status: Historical | |
| Sep 12, 2011 | Administrative Civil LiabilityOrder R2-2011-0053 | Entered into by and between the AEO of the Regional Water Board, on behalf of the Prosecution Staff of the Regional Water Board and C&H Sugar Company. C&H agrees to pay $379,200 to the SWRCB Cleanup and Abatement Account within 30 days of adoption of the Order. Order R2-2011-0053 signed by EO settles the enforcement case against C&H Sugar for of an unauthorized release of process water into the Carquinez Strait.Status: Historical | Penalty required |
| Aug 9, 2011 | Administrative Civil LiabilityOrder R2-2011-0077 | Status: Historical | Penalty required |
| Jun 27, 2011 | Oral Communication | Status: Historical | |
| Jun 27, 2011 | Oral Communication | Advised caller to follow up with a 5-day letter; accelerated monitoring had already been done (daily samples collected).Status: Historical | |
| Jun 22, 2011 | Oral Communication | Confirmed there were no color, odor, or other effects observed; advised to call CalEMA (had already called NRC), prepare 5-day letter.Status: Historical | |
| Feb 22, 2011 | Oral Communication | Discussed estimated amount, location, and quality of spill (pH 10.5 to 11, estimated TSS 78 mg/L, corrective actions, and observed impact on receiving water. Required 5-Day report.Status: Historical | |
| Jan 31, 2011 | Oral Communication | Status: Historical | |
| Jan 7, 2011 | Administrative Civil LiabilityOrder R2-2011-0001 | entered into by and between the AEO of the Regional Water Board, on behalf of the Prosecution Staff of the Regional Water Board and C&H Sugar Company. C&H agrees to pay $200,000 to the SWRCB Cleanup and Abatement Account within 30 days of adoption of the Order. Order R2-2011-0001 signed by EO, it settles the enforcement case against C&H Sugar for of 2 unauthorized releases of sugar, into the Carquinez Strait.Status: Historical | Penalty required |
| Jan 24, 2010 | Oral Communication | Status: Historical | |
| Dec 22, 2009 | Oral Communication | Status: Historical | |
| Aug 27, 2009 | Administrative Civil LiabilityOrder R2-2009-0058 | ACL Order re. Complaint R2-2008-0100 for $490,000 with an SEP for $231,500 to Muir Heritage Trust, to address NPDES effluent violations Sept 2005 to May 2009Status: Historical | Penalty required |
| Aug 10, 2007 | Notice of Violation | ||
| Jun 1, 2007 | Investigative order (Water Code 13267) | NOV and Request for Technical Information under Water Code Sections 13383 and 13267; response due April 21, 2008Status: Historical | |
| Feb 1, 2006 | Notice of Violation | ||
| Sep 16, 2005 | Administrative Civil LiabilityOrder R2-2005-0037 | MMP for 10 eff limit violations, 9/28/04 through 6/7/05. Total = $30,000. Waiver signed, $22,500 SEP and $7,500 penalty.The Water Board marks this as a mandatory minimum penalty.Status: Historical | Penalty required |
| Feb 25, 2005 | Notice of Violation | ||
| Aug 13, 2004 | Administrative Civil LiabilityOrder R2-2004-0067 | MMP in the amount of $63,000 for violations occuring over 2/1/2002 - 5/31/2004.The Water Board marks this as a mandatory minimum penalty.Status: Historical | Penalty required |
| Aug 13, 2002 | Notice of ViolationOrder UNKNOWN | Will send out an NOV for violation of prohibition to discharge wastes other than those authoried by permit (violation 116646). To assess impact, we're requesting further info: 2-weeks of flow records; measruements for BOD, TSS, TDS, pH, temp.Status: Historical | |
| May 29, 2002 | Oral CommunicationOrder UNKNOWN | Discussed with Lisa Crowley spill incident.Status: Historical | |
| May 22, 2002 | Administrative Civil LiabilityOrder R2-2002-0005 | This is the first MMP for C&H, covering a total of 15 effluent limit violations of the NPDES permit from Jan 1, 2000 through Dec 31, 2001. $6,000 for two of the eight serious violations are eligible for SEP.The Water Board marks this as a mandatory minimum penalty.Status: Historical | Penalty required |
| May 22, 2002 | Administrative Civil LiabilityOrder R2-2002-0016 | This ACL imposed a $367,000 fine for C&H's violations of NPDES permit during Jul 1, 1995 and Dec. 31, 1999. C&H agreed to implement an EO approved SEP ($245,000), and a compliance project ($100,000) over the next three years.Status: Historical | Penalty required |
Sources: the State Water Board's permit, monitoring, and enforcement records (CIWQS) and the EPA's monthly reports and permit limits (ICIS-NPDES). The Water Board's record for this facility (CIWQS).
About 5,818 people live in the neighborhood around this site in Rodeo. The state scores it above 80% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6013358000. The score covers the whole neighborhood and does not measure this site's own effect.
The Water Board's record for this facility (CIWQS)
The EPA's record for this site
Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.