City of El Cajon, a city agency, holds this storm drain permit.
Municipal storm drains
This Phase I municipal storm drain permit has been in place since June 2013.
It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 1 violation and took 1 enforcement action.
Clean WaterMunicipal storm drains
Results only in annual reports
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Phase I municipal storm drain permit
Permit order
R9-2013-0001
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
June 2013
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
9 37M1000308
Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.
Violations the Water Board recorded
Listed as the Water Board recorded them.
Date
Type
What the Water Board recorded
Feb 18, 2018
Deficient ReportClass 3
Review of the Regional Clearinghouse, with respect to GIS data, layers, and/or shapefiles, the San Diego Water Board concludes that the Copermittee is non-compliant with provision F.4 of the Regional MS4 Permit.
Enforcement actions
Notices, orders, and penalties the Water Board issued.
Date
Action
Details
Penalty
Mar 13, 2024
Time schedule orderOrder R9-2024-0010
The California Regional Water Quality Control Board, San Diego Region (San Diego Water Board) adopted Time Schedule Order No. R9-2024-0010, An Order Requiring Designated Responsible Permittees to Comply with Bacteria, Project I-Twenty Beaches and Creeks TMDL Requirements Prescribed in the Regional Municipal Separate Storm Sewer Systems Permit for the San Diego Region (TSO No. R9-2024-0010) at its meeting on Wednesday, March 13, 2024. The City of El Cajon is listed as a TSO Responsible Permittee and must comply with the requirements prescribed in TSO No. R9-2024-0010.Status: Active
Source: the State Water Board's stormwater system (SMARTS).