Advanced ElectroMagnetics Inc has held an industrial stormwater permit for the site since February 2018. Its industry is listed as manufacturing industries. The permit requires samples of its runoff, and the last one it filed is from January 2024.

1320 Air Wing Road, San Diego

Industrial stormwater

This site filed no samples of its runoff in the 2025-2026 reporting year, although rain records show 11 storms of a tenth of an inch or more near it.

The permit requires samples in each half of the year, July to December and January to June. The last sample it filed is from January 2024.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2023-24

The facility sampled 2 of the 19 storms of a tenth of an inch or more near the site in 2023-24.

The permit generally requires samples from four storms a year, with few exceptions. This site says it qualifies for a reduced schedule.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2023-24

Suspended solids

6.3 mg/L2 results

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

15 results as a table
SampledDrainage areaResult
Jan 22, 2024DP#17.8 mg/L
Jan 3, 2024DP#14.7 mg/L
Jan 30, 2023DP#16.9 mg/L
Jan 16, 2023DP#110 mg/L
Dec 12, 2022DP#129 mg/L
Nov 8, 2022DP#16.1 mg/L
Feb 22, 2022DP#155 mg/L
Dec 14, 2021DP#1260 mg/L
Dec 9, 2021DP#138 mg/L
Jan 29, 2021DP#1300 mg/L
Mar 10, 2020DP#14.8 mg/L
Feb 10, 2020DP#18 mg/L
Dec 4, 2019DP#13.6 mg/L
Nov 20, 2019DP#114 mg/L
Nov 29, 2018Back Drain35 mg/L

pH

7 to 72 results

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

15 results as a table
SampledDrainage areaResult
Jan 22, 2024DP#17
Jan 3, 2024DP#17
Jan 30, 2023DP#17
Jan 16, 2023DP#17
Dec 12, 2022DP#18
Nov 8, 2022DP#17
Feb 22, 2022DP#19
Dec 14, 2021DP#17
Dec 9, 2021DP#18
Jan 29, 2021DP#18
Mar 10, 2020DP#18
Feb 10, 2020DP#17.3
Dec 4, 2019DP#18
Nov 20, 2019DP#18
Nov 29, 2018Back Drain7

Oil and grease

Not detected2 results

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

15 results as a table
SampledDrainage areaResult
Jan 22, 2024DP#1Not detected
Jan 3, 2024DP#1Not detected
Jan 30, 2023DP#18.8 mg/L
Jan 16, 2023DP#1Not detected
Dec 12, 2022DP#12.7 mg/L
Nov 8, 2022DP#1Not detected
Feb 22, 2022DP#1Not detected
Dec 14, 2021DP#1Not detected
Dec 9, 2021DP#11.5 mg/L
Jan 29, 2021DP#12.7 mg/L
Mar 10, 2020DP#13.5 mg/L
Feb 10, 2020DP#16.2 mg/L
Dec 4, 2019DP#1Not detected
Nov 20, 2019DP#1Not detected
Nov 29, 2018Back DrainNot detected

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. This site told the state it qualifies for a reduced schedule with fewer samples. When a site samples fewer than its schedule asks, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

0 of 11 storms sampledTold the state: not enough qualifying storms occurred; storms fell outside operating hours

2024-25

0 of 5 storms sampledTold the state it did not sample every required storm

2023-24

2 of 19 storms sampledTold the state it did not sample every required storm

2022-23

4 of 17 storms sampledTold the state it did not sample every required storm

2021-22

3 of 14 storms sampledTold the state it did not sample every required storm

2020-21

1 of 10 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station San Diego Brown Field (USW00003178), 2.2 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Johnson Canyon.

Storm drains carry this runoff to creeks and the ocean without treatment.

Permits and IDs

Industry
Manufacturing Industries, NEC
Operator
Advanced ElectroMagnetics Inc
Covered by
Industrial stormwater permit
Stormwater permit since
February 2018
Site size
2.6 acres
Paved or roofed
85% of the site
State stormwater ID
9 37I027597

The state stormwater record

Report pollution at this site