City of San Diego Engineering & Capital Projects, a city agency, operates the site. It has filed no discharge results.
2261 Enright Dr, San Diego
Construction stormwater
This construction site has filed no discharge results.
A site samples only when a storm makes it discharge. With no results, there is nothing to compare with the permit's action levels. The Water Board has recorded no violations and taken no enforcement actions here.
Clean WaterConstruction stormwater
No discharge results
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Construction stormwater permit
Risk level
Risk level 2The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
July 2024
Disturbed area
9.22 acres
Project
park improvement
State permit ID
9 37C404472
Days above the permit's action level
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.
Date
Discharge point
Measure
Day's value
Level
Mar 13, 2025
Enright and Beyer
Turbidity
368 NTU
above 250 NTU
Mar 13, 2025
Enright Dr
Turbidity
799 NTU
above 250 NTU
Mar 13, 2025
Outfall Beyer Blvd
Turbidity
338 NTU
above 250 NTU
All field readings (3)
Date
Discharge point
pH
Turbidity
Mar 13, 2025
Enright and Beyer
7.5
368 NTU
Mar 13, 2025
Enright Dr
7.3
799 NTU
Mar 13, 2025
Outfall Beyer Blvd
7.4
338 NTU
Violations the Water Board recorded
None
Enforcement actions
None
Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.
Location and details
The neighborhood
About 5,159 people live in the neighborhood around this site in San Diego. The state scores it above 82% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6073010015. The score covers the whole neighborhood and does not measure this site's own effect.