28411 San Juan Creek Road, San Juan Capistrano, CA 92675
Shady Maples LLC has held an industrial stormwater permit for the site since May 2021. Its industry is listed as horses and other equines. Its runoff was over a state benchmark in each of the last two years it sampled, most recently in 2023-24 for nitrate and nitrite and for suspended solids.
28411 San Juan Creek Road, San Juan Capistrano
Industrial stormwater
During the 2023-2024 rainy season, the site exceeded benchmarks set by the state for nitrate and nitrite and suspended solids.
Its yearly average for nitrate and nitrite was 5.6 times the benchmark. It has exceeded at least one benchmark in each of the last two years it sampled.
Clean WaterIndustrial stormwater
Over a state benchmark
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Rain and sampling in 2023-24
The facility sampled 1 of the 17 storms of a tenth of an inch or more near the site in 2023-24.
The permit generally requires samples from four storms a year, with few exceptions.
What the samples show
The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.
Yearly average, over
Yearly average, within
Single lab result
State benchmark
Over the benchmark in 2023-24
Pollutant2023-24 averageBenchmarkLast five years
Nitrate and nitrite
3.8 mg/L1 result
0.68 mg/L
Over in 1 of 1 year tested
All results for nitrate and nitrite
Feeds algae blooms that strip oxygen from creeks and lagoons.
1 result as a table
Sampled
Drainage area
Result
Feb 20, 2024
Discharge Point 6
3.8 mg/L
Suspended solids
283 mg/L1 result
100 mg/L
Over in each year tested
All results for suspended solids
Mud and fine particles that cloud water, bury habitat, and carry other pollutants.
2 results as a table
Sampled
Drainage area
Result
Feb 20, 2024
Discharge Point 6
283 mg/L
Jan 5, 2023
Discharge Point 6
351 mg/L
Tested once or twice and within the benchmark: pH, oil and grease, phosphorus.
Also tested, with no state benchmark to compare against: 1 result for total coliform.
Rain and sampling by year
The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.
Day with rain
Day sampled
2025-26
0 of 12 storms sampledTold the state: not enough qualifying storms occurred; storms did not produce a discharge; all stormwater was retained on site; another reason
2024-25
0 of 10 storms sampledTold the state it did not sample every required storm
2023-24
1 of 17 storms sampledTold the state it did not sample every required storm
2022-23
1 of 17 storms sampledTold the state it did not sample every required storm
2021-22
0 of 12 storms sampledTold the state it did not sample every required storm
2020-21
0 of 0 storms sampledNo annual report on file
JulAugSepOctNovDecJanFebMarAprMayJun
Rainfall comes from the daily records of NOAA station Mission Viejo 3.5 SSE(K6wta) (US1CAOR0026), 4 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
Location and details
Where the runoff goes
The facility reports that rain running off it drains to San Juan Creek.
Storm drains carry this runoff to creeks and the ocean without treatment.
The neighborhood
About 9,842 people live in the neighborhood around this site in San Juan Capistrano. The state scores it above 18% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6059042203. The score covers the whole neighborhood and does not measure this site's own effect.