Northgate Development AC LP By DTC Phase II LLC a Delaware LLC its general Partner operates the site. At its risk level, the permit does not require discharge samples.

N Tippecanoe and 3rd St., San Bernardino

Construction stormwater

This construction site is at risk level 1, so it does not have to sample its discharges.

There are no results to compare with the permit's action levels. The Water Board has recorded no violations and taken no enforcement actions here.

Clean WaterConstruction stormwater

No discharge results

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Construction stormwater permit
Risk level
Risk level 1The permit does not require samples of discharges at this level.
Status in the state system
Active
Covered since
June 2025
Disturbed area
4.78 acres
Project
Industrial
State permit ID
8 36C407315

Days above the permit's action level

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.

At risk level 1, the permit does not require samples of discharges, so no results are expected.

Violations the Water Board recorded

None

Enforcement actions

None

Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.

Location and details

Permits and IDs

Operator
Northgate Development AC LP By DTC Phase II LLC a Delaware LLC its general Partner
Covered by
Construction stormwater permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report