Sabbah Properties LLC operates the site. It has filed no discharge results.
13561 5th Street, Yucaipa
Construction stormwater
This construction site has filed no discharge results.
A site samples only when a storm makes it discharge. With no results, there is nothing to compare with the permit's action levels. The Water Board recorded 3 violations and took 9 enforcement actions.
Clean WaterConstruction stormwater
No discharge results
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Construction stormwater permit
Risk level
Risk level 2The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
August 2024
Disturbed area
2.01 acres
Project
Residential
Drains to
Calimesa Channel, San Timoteo Creek, San Timoteo Canyon, and San Timoteo Wash
State permit ID
8 36C404781
Days above the permit's action level
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.
The site has filed no discharge results. A site samples only when a storm makes it discharge, so there may have been nothing to sample.
Violations the Water Board recorded
Listed as the Water Board recorded them.
Date
Type
What the Water Board recorded
Sep 2, 2026
Late ReportClass B
Failure to submit 2025 - 2026 Annual Report by due dateThe Water Board marks this violation as serious.
Sep 1, 2025
Late ReportClass B
Failure to submit the 2024-2025 Annual Report by 09/01/2025
Mar 26, 2025
Deficient BMP ImplementationClass B
Erodible soil stockpiles did not have BMPs installed to prevent erosion. The stockpiles were also not stabilized and did not appear to be actively in use; Sediment was present in the driveway of the northern neighbor behind Unit 2; Trash and construction materials were observed on the ground throughout the entire site; Crushed asphalt stockpile along the southern border was left exposed to the elements without the use of BMPs; Some fiber rolls being used in conjunction with silt fencing along the southern perimeter had either been degraded or were missing; Silt fencing was not properly installed in certain areas of the site. This included the area south of the future bioretention basin, where the silt fencing was installed backwards, gaps were present in between rows of fencing, and the fabric was not affixed to the stakes. Additionally, there was a gap between the silt fencing and retaining wall at both the northwest corner of the basin and north of Unit 2; Stabilized construction entrance was not properly constructed to effectively prevent offsite sediment discharges. This included sandbags and visible soil deposits on top of the crushed stone; Neither the SWPPP, site maps, inspection reports, or sampling data was available for review onsite at the time of inspection. The contractor did not provide any of the aforementioned documents via email upon request; The SWPPP listed incorrect owner and contractor information, as well as current sediment risk information and inspection frequency requirements under the 2022 CGP. The SWPPP also had inconsistent information regarding the total project development acreage; Both SMARTS and the SWPPP state the project will be completed by April 15, 2025, which was inconsistent with observations made onsite; and, The SWPPP and site maps uploaded to SMARTS failed to identify any sampling locations.
Enforcement actions
Notices, orders, and penalties the Water Board issued.
Date
Action
Details
Penalty
Nov 12, 2026
Notice of non-compliance
Failure to submit 2025-2026 Annual Report by due date. SECOND NOTICEStatus: Active
Oct 12, 2026
Notice of non-compliance
Failure to submit 2025-2026 Annual Report by due dateStatus: Active
Sep 10, 2026
Notice of violation
Failure to submit 2025-2026 Annual Report by the due dateStatus: Active
Apr 8, 2026
Notice of non-compliance
Failure to submit 2024-2025 AR by deadline. SECOND NOTICEStatus: Active
Mar 9, 2026
Notice of non-compliance
Failure to submit the 2024-2025 Annual Report by due date.Status: Active
Sep 5, 2025
Notice of violation
Failure to submit the 2024-2025 Annual Report by 09/01/2025. This NOV was issued via First ClassStatus: Active
Sep 2, 2025
Notice of violation
Notice of Violation issued for onsite violations of the Construction General Permit.Status: Active
May 14, 2025
Notice of violation
Second Notice of Violation issued for onsite deficiencies.Status: Active
Apr 14, 2025
Notice of violation
Notice of Violation issued for onsite violations of the Construction General Permit.Status: Active
Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.
Location and details
The neighborhood
About 4,729 people live in the neighborhood around this site in Yucaipa. The state scores it above 33% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6071008709. The score covers the whole neighborhood and does not measure this site's own effect.