EarthSpotterEarthSpotter

Tract 16268

Wildwood Canyon Road and Holmes Street, Yucaipa, CA 92399

Pacific Horizon Builders operates the site. Its discharge was above the permit's action level on 2 days in the last 12 months.

Wildwood Canyon Road and Holmes Street, Yucaipa

Construction stormwater

On 2 days in the last 12 months, a discharge from this construction site was above the permit's action level for turbidity.

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge. The permit does not count a day above an action level as a violation. The Water Board recorded 1 violation and took 2 enforcement actions.

Clean WaterConstruction stormwater

Above the permit's action level

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Construction stormwater permit
Risk level
Risk level 2The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
January 2024
Disturbed area
13 acres
Project
Residential
Drains to
Yucaipa Creek
State permit ID
8 36C402844

Days above the permit's action level

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.

DateDischarge pointMeasureDay's valueLevel
Feb 19, 2026SP-1Turbidity274 NTUabove 250 NTU
Feb 19, 2026SP-3Turbidity731 NTUabove 250 NTU
Feb 18, 2026SP-1Turbidity688 NTUabove 250 NTU
Feb 18, 2026SP-3Turbidity909 NTUabove 250 NTU
All field readings (4)
DateDischarge pointpHTurbidity
Feb 19, 2026SP-17.2274 NTU
Feb 19, 2026SP-37.2731 NTU
Feb 18, 2026SP-17.2688 NTU
Feb 18, 2026SP-37.2909 NTU

Violations the Water Board recorded

Listed as the Water Board recorded them.

DateTypeWhat the Water Board recorded
Mar 26, 2025Deficient BMP ImplementationClass BFailure to implement BMPs to control the off-site tracking of sediment; keep debris or trash in waste containers; secure and contain concrete washout areas and other washout areas that may contain additional pollutants to minimize discharge into the underlying soil and onto surrounding areas; contain fuel, grease, and oil from vehicles leaking into the ground; clean leaks from vehicles; minimize the disturbance of steep slopes; initiate stabilization for disturbed areas whenever earth disturbing activities ceased on any portion of the site and will not resume for a period exceeding 14 calendar days; establish and maintain effective perimeter controls; stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site; design, install, and maintain effective sediment controls to minimize the discharge of pollutants utilizing site-specific BMPs; design and construct cut and fill slopes in a manner to ensure slope stability and to minimize erosion; install linear sediment controls along the toe of the slope, face of the slope, and at the grade breaks of exposed slopes; limit construction activity traffic to and from the project to entrances and exits that employ effective controls to prevent off-site tracking of sediment; maintain and protect all storm drain inlets; remove excess sediment deposited on roadways by sweeping or vacuuming; maintain, repair, and/or implement design changes to BMPs after identification of failures or other shortcomings; have a QSP or delegate verify all BMP maintenance and repairs were appropriately implemented; conduct visual inspections once every 24-hour period during Qualifying Precipitation Events; complete all of the minimum requirements in an inspection checklist; collect samples of stormwater discharges according to Risk Level 2 requirements; certify and submit Permit Registration Documents revisions in SMARTS, through a Change of Information, prior to the increase in disturbed acreage; amend the site-specific SWPPP as necessary to reflect current site conditions and activities and keep it updated in SMARTS; and, for the site maps to include all required information as listed in the 2022 General Permit.

Enforcement actions

Notices, orders, and penalties the Water Board issued.

DateActionDetailsPenalty
May 30, 2025Notice of violationSecond Notice of Violation issued for failure to address all violations of the Construction General Permit in outlined in the first NOVStatus: Historical
Apr 30, 2025Notice of violationNotice of Violation issued for onsite deficiencies observed during a March 26, 2025, inspection of the construction site.Status: Historical

Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.

Location and details

The neighborhood

About 4,118 people live in the neighborhood around this site in Yucaipa. The state scores it above 18% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6071008708. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Operator
Pacific Horizon Builders
Covered by
Construction stormwater permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report