Avalon Shutters Inc has held an industrial stormwater permit for the site since April 2015. Its industry is listed as millwork. The permit requires samples of its runoff, and the last one it filed is from January 2017.

3407 N Perris Blvd, Perris

Industrial stormwater

This site last filed a sample of its runoff in January 2017.

The permit requires testing. It has filed no results for the last three years, so there is no public record of what its runoff contains.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled none of the 10 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. This site says it qualifies for a reduced schedule. The facility told the state it missed storms because storms fell outside operating hours.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested once or twice and within the benchmark: pH, suspended solids, oil and grease, chemical oxygen demand.

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. This site told the state it qualifies for a reduced schedule with fewer samples. When a site samples fewer than its schedule asks, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

0 of 10 storms sampledTold the state: storms fell outside operating hours

2024-25

0 of 6 storms sampledTold the state it did not sample every required storm

2023-24

0 of 15 storms sampledTold the state it did not sample every required storm

2022-23

0 of 17 storms sampledTold the state it did not sample every required storm

2021-22

0 of 9 storms sampledTold the state it did not sample every required storm

2020-21

0 of 6 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station March AFB (USW00023119), 4.8 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Storm Drain.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 6,377 people live in the neighborhood around this site in Perris. The state scores it above 73% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6065042625. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
Millwork
Operator
Avalon Shutters Inc
Covered by
Industrial stormwater permit
Stormwater permit since
April 2015
Site size
180170 square feet
Paved or roofed
95% of the site
State stormwater ID
8 33I025420

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report