County of Orange, a county agency, holds this storm drain permit.
Municipal storm drains
This Phase I municipal storm drain permit has been in place since May 2009.
It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 14 violations and took 13 enforcement actions.
Clean WaterMunicipal storm drains
Results only in annual reports
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Phase I municipal storm drain permit
Permit order
R8-2009-0030
Permit holder
County Agency
Status in the state system
Active
Covered since
May 2009
Area covered
The county's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
8 30M1000249
Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.
Violations the Water Board recorded
Listed as the Water Board recorded them.
Date
Type
What the Water Board recorded
Jan 31, 2022
MS4 Order ConditionClass B
County of Orange and City of Dana Point failure to assess and report compliance in wet weather for Baby Beach Bacteria TMDL based on the final receiving water limitations or WQBELs. Pursuant to Specific Provision 5.d(3)(a) in accordance with Specific Provision 5.b(2) of Attachment E to the Order: The County of Orange and City of Dana Point must analyze the dry weather and wet weather monitoring data to assess whether the interim and final WQBELs have been achieved. Specific Provision 5.b(2) of Attachment E details the Final Water Quality Based Effluent Water Limitations.
Jan 31, 2022
MS4 Order ConditionClass B
County of Orange and City of Dana Point failure to assess and report compliance in dry weather for Baby Beach Bacteria TMDL based on the final receiving water limitations or WQBELs Pursuant to Specific Provision 5.d(3)(a) in accordance with Specific Provision 5.b(2) of Attachment E to the Order: The Responsible Copermittees must analyze the dry weather and wet weather monitoring data to assess whether the interim and final Water Quality Based Effluent Water Limitations (WQBELs) have been achieved. Specific Provision 5.b(2) of Attachment E details the Final WQBEL.
Jan 31, 2022
MS4 Order ConditionClass B
Failure to Properly Calculate Wet Weather 30-day Geometric Mean Exceedance Frequencies Pursuant to Specific Provision 6.d.(1)(c)(iii)[e] and 6.d.(2)(c)(iii)[e] of Attachment E to the Order: The data collected for dry weather must be used in addition to the data collected for wet weather to calculate the wet weather 30-day geometric means. The exceedance frequency of the wet weather 30-day geometric means must be calculated by dividing the number of geometric means that exceed the geometric mean receiving water limitations in Table 6.2 by the total number of geometric means calculated from samples collected during the wet season.
Jan 31, 2022
MS4 Order ConditionClass B
Failure to Properly Calculate Wet Weather Single Sample Maximum (SSM) Exceedance FrequenciesPursuant to Specific Provision 6.d.(1)(c)(iii)[a]-[d] and 6.d.(2)(c)(iii)[a]-[d] of Attachment E to the Order: The Responsible Copermittees must analyze the dry weather and wet weather monitoring data to assess whether the interim and final WQBELs for the creeks and creek mouths listed in Table 6.0 have been achieved.
Jan 31, 2022
MS4 Order ConditionClass B
Failure to Properly Calculate Dry Weather 30-day Geometric Mean Exceedance Frequencies Pursuant to Specific Provision 6.d.(1)(c)(ii)[d] and 6.d.(2)(c)(ii)[c] of Attachment E to the Order: The exceedance frequency must be calculated by dividing the number of 30-day geometric means that exceed the 30-day geometric mean receiving water limitations in Table 6.2 by the total number of 30-day geometric means calculated from samples collected during the dry season.
Jan 31, 2022
MS4 Order ConditionClass B
Failure to Properly Calculate Dry Weather Single Sample Maximum (SSM) Exceedance Frequencies Pursuant to Specific Provision 6.d.(1)(c)(i) and 6.d.(2)(c)(i) of Attachment E to the Order: The Responsible Copermittees must analyze the dry weather and wet weather monitoring data to assess whether the interim and final WQBELs for the Pacific Ocean Shoreline segments and the creeks and creek mouths listed in Table 6.0 have been achieved.
Jan 31, 2022
MS4 Order ConditionClass B
Failure to Monitor for Dry Weather at Compliance Station: Cameo Cove at Irvine Cove Drive - Riviera Way (IRVCOVE) Pursuant to Specific Provision 6.d.(1)(c)(i) of Attachment E to the Order: The Responsible Copermittees must analyze the dry weather and wet weather monitoring data to assess whether the interim and final WQBELs for the Pacific Ocean Shoreline segments or areas listed in Table 6.0 have been achieved.
Jan 31, 2022
MS4 Order ConditionClass B
Jun 17, 2019
Deficient BMP ImplementationClass B
Violation of provision XII.B.2; failure to prepare WQMPs according to the approved model WQMP.
Feb 18, 2018
Deficient ReportClass 3
Review of the Regional Clearinghouse, with respect to GIS data, layers, and/or shapefiles, the San Diego Water Board concludes that the Copermittee is non-compliant with provision F.4 of the Regional MS4 Permit.
Oct 23, 2012
Deficient BMP ImplementationClass 3
East Bluff Project - No action to repair or install permanent structural solution.
Jan 19, 2012
Deficient BMP ImplementationClass 3
Alton Parkway Project - improper inlet protection; sedimentation basin full of sediment; gaps in perimeter controls.
Jun 21, 2011
Deficient BMP ImplementationClass 3
Midway City Project - poor BMP implementation; unprotected inlets; stockpiles in street gutter
Notices, orders, and penalties the Water Board issued.
Date
Action
Details
Penalty
Mar 3, 2025
Verbal warning
Following interviews of County staff involved with the preparation of the project WQMP, James Fortuna and others in attendance were told that failing to include the groundwater and soil contamination in the WQMP site plans violated the permit.Status: Active
Mar 13, 2024
Time schedule orderOrder R9-2024-0010
The California Regional Water Quality Control Board, San Diego Region (San Diego Water Board) adopted Time Schedule Order No. R9-2024-0010, An Order Requiring Designated Responsible Permittees to Comply with Bacteria, Project I-Twenty Beaches and Creeks TMDL Requirements Prescribed in the Regional Municipal Separate Storm Sewer Systems Permit for the San Diego Region (TSO No. R9-2024-0010) at its meeting on Wednesday, March 13, 2024. The County of Orange is listed as a TSO Responsible Permittee and must comply with the requirements prescribed in TSO No. R9-2024-0010.Status: Active
Dec 15, 2023
Notice of violation
The California Regional Water Quality Control Board, San Diego Region (San Diego Water Board) is issuing Notice of Violation (NOV) No. R9-2023-0204 to the San Juan Watershed Management Area (WMA) Copermittees for failure to comply with National Pollutant Discharge Elimination System (NPDES) Permit No. CAS0109266 and Waste Discharge Requirements for Discharges from the Municipal Separate Storm Sewer Systems (MS4s) Draining the Watersheds Within the San Diego Region, Order No. R9-2013-0001, as amended (Order).1 The San Juan Baby Beach Bacteria TMDL Responsible Copermittees (Responsible Copermittees) include the County of Orange and City of Dana Point.Status: Active
Dec 15, 2023
Notice of violation
The California Regional Water Quality Control Board, San Diego Region (San Diego Water Board) is issuing Notice of Violation (NOV) No. R9-2023-0203 to the San Juan Watershed Management Area (WMA) Copermittees for failure to comply with National Pollutant Discharge Elimination System (NPDES) Permit No. CAS0109266 and Waste Discharge Requirements for Discharges from the Municipal Separate Storm Sewer Systems (MS4s) Draining the Watersheds Within the San Diego Region, Order No. R9-2013-0001, as amended (Order)1. The San Juan Responsible Copermittees in the San Juan WMA include the County of Orange, Orange County Flood Control District and the cities of Aliso Viejo, Dana Point, Laguna Beach, Laguna Hills, Laguna Niguel, Laguna Woods, Lake Forest, Mission Viejo, Rancho Santa Margarita, San Clemente, and San Juan Capistrano.Status: Active
Dec 6, 2019
Time schedule orderOrder R8-2019-0050
To fulfill requirements of the TMDL forFecal Coliform in Newport Bay (Resolution 99-10), the January 7, 2000 Water Code Section13267 letter, and the December 6, 2019 Time Schedule Order (R8-2019-0050)Status: Active
Jul 11, 2018
Order to submit informationOrder R8-2018-0075
Investigative Order No. R8-2018-0075Status: Active
Jun 20, 2018
Notice of violationOrder R9-2018-0101
NOV R9-2018-0101 for failure to prohibit over-irrigation as an illicit discharge through statute, ordinance, permit, contract, order, or similar means.Status: Historical
Nov 8, 2012
Staff enforcement letter
East Bluff Project - No action to repair or install permanent structural solution.Status: Historical
Jan 24, 2012
Staff enforcement letter
Alton Parkway Project - improper inlet protection; sedimentation basin full of sediment; gaps in perimeter controls.Status: Historical
Jul 5, 2011
Staff enforcement letter
Midway City Project - poor BMP implementation; unprotected inlets; stockpiles in street gutterStatus: Historical