City of Fullerton, a city agency, holds this storm drain permit.
Municipal storm drains
This Phase I municipal storm drain permit has been in place since January 2002.
It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 2 violations and took 3 enforcement actions.
Clean WaterMunicipal storm drains
Results only in annual reports
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Phase I municipal storm drain permit
Permit order
R8-2009-0030
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
January 2002
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
8 30M1000229
Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.
Violations the Water Board recorded
Listed as the Water Board recorded them.
Date
Type
What the Water Board recorded
Feb 11, 2026
Deficient BMP ImplementationClass B
The February 11, 2026 inspection of Fullerton Public Works yard identified several permit violations under Order R8-2009-0030. Storm drain inlets had accumulated debris and damaged screens, with trash observed inside a drain channel (Sections XIV.11, VII.4/VII.5). A rusted, leaking dumpster with food waste and uncovered containers posed direct discharge risks to the storm drain system (Sections III.2, III.7, VII.2, VI.7(f)). A spill kit was found with a hidden label and deteriorated absorbents, indicating failed BMP maintenance (Section XIV.2). Rusting rebar stored in standing water and construction materials left on pavement created additional pollutant pathways (Sections III.2, XIV.1). Staff also failed to provide a facility map, suggesting documentation deficiencies (Sections XIV.1, XIX).
Aug 12, 2015
Deficient BMP ImplementationClass 3
Failure to prove structural treatment controls at 3 projects within Fullerton conform to published design standards.
Enforcement actions
Notices, orders, and penalties the Water Board issued.
Date
Action
Details
Penalty
Mar 2, 2026
Verbal warning
Contact directed to: 1. Clean and maintain all storm drain inlets, repair or replace damaged inlet screens, and remove all debris and trash from storm drain structures.2. Repair or replace the leaking dumpster and ensure all waste containers are covered and watertight.3. Replace all degraded spill kit materials and ensure kits are clearly labeled and accessible.4. Relocate all rebar and construction materials away from standing water and install inlet protection near active work areas.5. Develop and maintain a current facility map identifying all stormwater-relevant features.Status: Active
Oct 6, 2015
Staff enforcement letter
Failure to prove structural treatment controls at 3 projects within Fullerton conform to published design standards.Status: Historical
Oct 6, 2015
Staff enforcement letter
Status: Active
Source: the State Water Board's stormwater system (SMARTS).