Jem Unlimited Iron has held an industrial stormwater permit for the site since February 2021. Its industry is listed as architectural and ornamental metal work. Every pollutant it tested in 2025-26 averaged within the state benchmarks. The site is in a watershed with a state cleanup plan for metals and selenium.
219 N Euclid Way, Anaheim
Industrial stormwater
During the 2025-2026 rainy season, every pollutant this site tested in its runoff averaged within the state's benchmarks.
That is based on 14 lab results from 2 storm days.
Clean WaterIndustrial stormwater
Within the state benchmarks
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Rain and sampling in 2025-26
The facility sampled 1 of the 8 storms of a tenth of an inch or more near the site in 2025-26.
The permit generally requires samples from four storms a year, with few exceptions. This site says it qualifies for a reduced schedule.
What the samples show
The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.
Yearly average, over
Yearly average, within
Single lab result
State benchmark
Tested in 2025-26
Pollutant2025-26 averageBenchmarkLast five years
pH
7 to 72 results
6 to 9
Over in 0 of 4 years tested
All results for pH
Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.
7 results as a table
Sampled
Drainage area
Result
Mar 16, 2026
DP-1
7
Oct 14, 2025
DP-1
7
Mar 14, 2025
DP-1
8
Feb 20, 2024
DP-1
8
Feb 1, 2024
DP-1
8
Dec 22, 2023
DP-1
7
Jan 10, 2023
DP-1
7
Suspended solids
1.3 mg/L2 results
100 mg/L
Over in 0 of 4 years tested
All results for suspended solids
Mud and fine particles that cloud water, bury habitat, and carry other pollutants.
7 results as a table
Sampled
Drainage area
Result
Mar 16, 2026
DP-1
Not detected
Oct 14, 2025
DP-1
2.5 mg/L
Mar 14, 2025
DP-1
13 mg/L
Feb 20, 2024
DP-1
16 mg/L
Feb 1, 2024
DP-1
Not detected
Dec 22, 2023
DP-1
3 mg/L
Jan 10, 2023
DP-1
Not detected
Oil and grease
Not detected2 results
15 mg/L
Over in 0 of 4 years tested
All results for oil and grease
Coats plants and animals and blocks oxygen from entering the water.
7 results as a table
Sampled
Drainage area
Result
Mar 16, 2026
DP-1
Not detected
Oct 14, 2025
DP-1
Not detected
Mar 14, 2025
DP-1
Not detected
Feb 20, 2024
DP-1
1 mg/L
Feb 1, 2024
DP-1
Not detected
Dec 22, 2023
DP-1
1.4 mg/L
Jan 10, 2023
DP-1
Not detected
Zinc
0.15 mg/L2 results
0.26 mg/L
Over in 0 of 4 years tested
All results for zinc
Toxic to fish and the small animals they eat, even at low concentrations.
7 results as a table
Sampled
Drainage area
Result
Mar 16, 2026
DP-1
0.19 mg/L
Oct 14, 2025
DP-1
0.1 mg/L
Mar 14, 2025
DP-1
0.1 mg/L
Feb 20, 2024
DP-1
0.17 mg/L
Feb 1, 2024
DP-1
0.02 mg/L
Dec 22, 2023
DP-1
0.029 mg/L
Jan 10, 2023
DP-1
0.11 mg/L
Iron
0.051 mg/L2 results
1 mg/L
Over in 0 of 4 years tested
All results for iron
Settles out as rust-colored sludge that smothers creek beds. The state took its iron benchmark from a 2008 EPA benchmark that the EPA has since stopped using.
7 results as a table
Sampled
Drainage area
Result
Mar 16, 2026
DP-1
Not detected
Oct 14, 2025
DP-1
0.1 mg/L
Mar 14, 2025
DP-1
0.11 mg/L
Feb 20, 2024
DP-1
0.56 mg/L
Feb 1, 2024
DP-1
0.77 mg/L
Dec 22, 2023
DP-1
0.2 mg/L
Jan 10, 2023
DP-1
0.022 mg/L
Aluminum
0.063 mg/L2 results
0.75 mg/L
Over in 0 of 4 years tested
All results for aluminum
Toxic to fish and aquatic insects. It builds up on gills.
7 results as a table
Sampled
Drainage area
Result
Mar 16, 2026
DP-1
0.047 mg/L
Oct 14, 2025
DP-1
0.078 mg/L
Mar 14, 2025
DP-1
0.38 mg/L
Feb 20, 2024
DP-1
0.04 mg/L
Feb 1, 2024
DP-1
Not detected
Dec 22, 2023
DP-1
Not detected
Jan 10, 2023
DP-1
0.0069 mg/L
Nitrate and nitrite
0.11 mg/L2 results
0.68 mg/L
Over in 0 of 4 years tested
All results for nitrate and nitrite
Feeds algae blooms that strip oxygen from creeks and lagoons.
7 results as a table
Sampled
Drainage area
Result
Mar 16, 2026
DP-1
0.06 mg/L
Oct 14, 2025
DP-1
0.16 mg/L
Mar 14, 2025
DP-1
0.42 mg/L
Feb 20, 2024
DP-1
1.3 mg/L
Feb 1, 2024
DP-1
0.15 mg/L
Dec 22, 2023
DP-1
0.17 mg/L
Jan 10, 2023
DP-1
0.24 mg/L
Rain and sampling by year
The permit asks each site to sample two storms between July and December and two between January and June. This site told the state it qualifies for a reduced schedule with fewer samples. When a site samples fewer than its schedule asks, its results may not represent its true runoff.
Day with rain
Day sampled
2025-26
1 of 8 storms sampledTold the state it sampled every required storm
2024-25
1 of 6 storms sampledTold the state it did not sample every required storm
2023-24
3 of 15 storms sampledTold the state it did not sample every required storm
2022-23
1 of 18 storms sampledTold the state it did not sample every required storm
2021-22
0 of 10 storms sampledTold the state it did not sample every required storm
2020-21
0 of 3 storms sampledTold the state it did not sample every required storm
JulAugSepOctNovDecJanFebMarAprMayJun
Rainfall comes from the daily records of NOAA station Fullerton Municipal Airport (USW00003166), 3.6 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
Location and details
Where the runoff goes
The facility reports that rain running off it drains to Coyote Creek.
The site sits in a watershed with a state cleanup plan for metals and selenium.
Storm drains carry this runoff to creeks and the ocean without treatment.
The neighborhood
About 6,769 people live in the neighborhood around this site in Anaheim. The state scores it above 86% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6059087102. The score covers the whole neighborhood and does not measure this site's own effect.