Walt Disney Parks and Resorts US Inc operates the site. It has filed no discharge results.
1515 S Harbor Blvd, Anaheim
Construction stormwater
This construction site has filed no discharge results.
A site samples only when a storm makes it discharge. With no results, there is nothing to compare with the permit's action levels. The Water Board recorded 1 violation and took 1 enforcement action.
Clean WaterConstruction stormwater
No discharge results
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Construction stormwater permit
Risk level
Risk level 2The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
January 2025
Disturbed area
3.5 acres
Project
Commercial
State permit ID
8 30C406032
Days above the permit's action level
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.
The site has filed no discharge results. A site samples only when a storm makes it discharge, so there may have been nothing to sample.
Violations the Water Board recorded
Listed as the Water Board recorded them.
Date
Type
What the Water Board recorded
Sep 3, 2026
Deficient BMP ImplementationClass B
Second construction entrance along the eastern border does not have a layer of crushed stone under the corrugated steel panel. Photographs also requested for the offsite coverage of stockpiles.
Enforcement actions
Notices, orders, and penalties the Water Board issued.
Date
Action
Details
Penalty
Sep 21, 2026
Verbal warning
Email sent requesting photographs of stabilized construction entrance along the eastern border. Photographs also requested for the offsite coverage of stockpiles.Status: Active