California State University Fullerton operates the site. At its risk level, the permit does not require discharge samples.

800 N State College Blvd, Fullerton

Construction stormwater

This construction site is at risk level 1, so it does not have to sample its discharges.

There are no results to compare with the permit's action levels. The Water Board recorded 1 violation and took 1 enforcement action.

Clean WaterConstruction stormwater

No discharge results

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Construction stormwater permit
Risk level
Risk level 1The permit does not require samples of discharges at this level.
Status in the state system
Active
Covered since
August 2024
Disturbed area
2.6 acres
Project
Residential
State permit ID
8 30C404637

Days above the permit's action level

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.

At risk level 1, the permit does not require samples of discharges, so no results are expected.

Violations the Water Board recorded

Listed as the Water Board recorded them.

DateTypeWhat the Water Board recorded
Feb 11, 2026Deficient BMP ImplementationClass BThe February 11, 2026 post-rainfall inspection identified two areas of non-compliance with Construction Stormwater General Permit ORDER WQ 2022-0057-DWQ. 1. Perimeter controls were absent along the south and east boundaries, allowing sediment-laden stormwater to migrate into the adjacent parking lot, violating Attachment D, Section II.E.1(a) and (c). 2. The concrete washout container was unlevel and near overflow, and waste containers were uncovered with accumulated rainwater, violating Attachment D, Sections II.A.2(e), (f), and (h).

Enforcement actions

Notices, orders, and penalties the Water Board issued.

DateActionDetailsPenalty
Feb 27, 2026Verbal warningContact directed to: 1. Install continuous perimeter controls along all south and east project boundaries.2. Re-level the concrete washout container, restore adequate capacity, and ensure coverage during precipitation events.3. Cover all waste disposal containers during precipitation events and at the end of every business day.Status: Active

Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.

Location and details

The neighborhood

About 5,317 people live in the neighborhood around this site in Fullerton. The state scores it above 72% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6059011504. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Operator
California State University Fullerton
Covered by
Construction stormwater permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.