Construction stormwater
On 1 day in the last 12 months, the reported turbidity of this construction site's discharge was over the permit's limit.
The Lake Tahoe permit's action level for pH is a range of 6.0 to 9.0, checked at each discharge point for each day of discharge. Its limit for turbidity is 20 NTU, checked against the day's average over all of the site's discharge points. The site may show the Water Board that a day over the limit does not count. The Water Board has recorded no violations and taken no enforcement actions here.