Bob Hensley has held an industrial stormwater permit for the site since April 1992. Its industry is listed as local trucking without storage. The permit requires samples of its runoff, and the last one it filed is from April 2026.
1218 E Kentucky Ave, Woodland
Industrial stormwater
This site filed no samples of its runoff in the 2025-2026 reporting year, although rain records show 16 storms of a tenth of an inch or more near it.
The permit requires samples in each half of the year, July to December and January to June. The last sample it filed is from April 2026.
Clean WaterIndustrial stormwater
Missing samples
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Rain and sampling in 2025-26
The facility sampled 1 of the 16 storms of a tenth of an inch or more near the site in 2025-26.
The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because all stormwater was retained on site. It also gave another reason.
What the samples show
The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.
Yearly average, over
Yearly average, within
Single lab result
State benchmark
Tested once or twice and within the benchmark: pH, suspended solids, oil and grease.
Rain and sampling by year
The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.
Day with rain
Day sampled
2025-26
1 of 16 storms sampledTold the state: all stormwater was retained on site; another reason
2024-25
0 of 15 storms sampledTold the state it did not sample every required storm
2023-24
0 of 22 storms sampledTold the state it did not sample every required storm
2022-23
0 of 14 storms sampledTold the state it did not sample every required storm
2021-22
0 of 11 storms sampledTold the state it did not sample every required storm
2020-21
0 of 13 storms sampledTold the state it did not sample every required storm
JulAugSepOctNovDecJanFebMarAprMayJun
Rainfall comes from the daily records of NOAA station Sacramento Metropolitan Airport (USW00093225), 9.2 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
Location and details
Where the runoff goes
The facility reports that rain running off it drains to Cache Creek (Lower).
Storm drains carry this runoff to creeks and the ocean without treatment.