Javier Padilla has held an industrial stormwater permit for the site since September 2024. Its industry is listed as wood pallets and skids. Its runoff was over the state benchmark for suspended solids in 2024-25. Under its stormwater permit it is at Exceedance Response Action Level 1 for suspended solids, which means a qualified professional must review its pollution controls.
4825 Stoddard Road, Modesto
Industrial stormwater
During the 2024-2025 rainy season, the site exceeded the benchmark set by the state for suspended solids.
Its yearly average for suspended solids was 1.5 times the benchmark.
Clean WaterIndustrial stormwater
Over a state benchmark
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Rain and sampling in 2024-25
The facility sampled 2 of the 14 storms of a tenth of an inch or more near the site in 2024-25.
The permit generally requires samples from four storms a year, with few exceptions.
What the samples show
The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.
Yearly average, over
Yearly average, within
Single lab result
State benchmark
Over the benchmark in 2024-25
Pollutant2024-25 averageBenchmarkLast five years
Suspended solids
155 mg/L2 results
100 mg/L
Over in 1 of 1 year tested
Exceedance Response Action Level 1
All results for suspended solids
Mud and fine particles that cloud water, bury habitat, and carry other pollutants.
2 results as a table
Sampled
Drainage area
Result
Mar 14, 2025
DP#1
59 mg/L
Feb 13, 2025
DP#1
250 mg/L
Tested once or twice and within the benchmark: pH, oil and grease, chemical oxygen demand.
Rain and sampling by year
The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.
Day with rain
Day sampled
2025-26
0 of 10 storms sampledTold the state: another reason
2024-25
2 of 14 storms sampledTold the state it did not sample every required storm
2023-24
0 of 0 storms sampledNo annual report on file
2022-23
0 of 0 storms sampledNo annual report on file
2021-22
0 of 0 storms sampledNo annual report on file
2020-21
0 of 0 storms sampledNo annual report on file
JulAugSepOctNovDecJanFebMarAprMayJun
Rainfall comes from the daily records of NOAA station Modesto Airport (USW00023258), 8.5 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
Location and details
Where the runoff goes
The facility reports that rain running off it drains to Lateral Number Six canal.
Storm drains carry this runoff to creeks and the ocean without treatment.
The neighborhood
About 6,995 people live in the neighborhood around this site in Modesto. The state scores it above 64% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6099000501. The score covers the whole neighborhood and does not measure this site's own effect.