JG Nurseries LLC has held an industrial stormwater permit for the site since December 2021. Its industry is listed as ready-mixed concrete. The permit requires samples of its runoff, and the last one it filed is from March 2023. Under its stormwater permit it is at Exceedance Response Action Level 1 for suspended solids and iron, which means a qualified professional must review its pollution controls.
100 s 2nd st, Patterson
Industrial stormwater
This site last filed a sample of its runoff in March 2023.
The permit requires testing. It has filed no results for the last three years, so there is no public record of what its runoff contains.
Clean WaterIndustrial stormwater
Missing samples
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Rain and sampling in 2025-26
The facility sampled none of the 10 storms of a tenth of an inch or more near the site in 2025-26.
The permit generally requires samples from four storms a year, with few exceptions. This site says it qualifies for a reduced schedule.
What the samples show
The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.
Yearly average, over
Yearly average, within
Single lab result
State benchmark
Not tested in the latest year
Figures are from the last year each was tested.
PollutantAverage when last testedBenchmarkLast five years
Suspended solids
7,070 mg/L2 results
100 mg/L
Over in 1 of 1 year tested
Exceedance Response Action Level 1
All results for suspended solids
Mud and fine particles that cloud water, bury habitat, and carry other pollutants.
2 results as a table
Sampled
Drainage area
Result
Mar 14, 2023
Patterson Retail
130 mg/L
Mar 10, 2023
Patterson Retail
14,000 mg/L
Iron
28,700 mg/L2 results
1 mg/L
Over in 1 of 1 year tested
Exceedance Response Action Level 1
All results for iron
Settles out as rust-colored sludge that smothers creek beds. This figure is unusually high. It may be a units mistake in what the facility filed. We show what was filed.
2 results as a table
Sampled
Drainage area
Result
Mar 14, 2023
Patterson Retail
3,400 mg/L
Mar 10, 2023
Patterson Retail
54,000 mg/L
Tested once or twice and within the benchmark: pH, oil and grease.
Rain and sampling by year
The permit asks each site to sample two storms between July and December and two between January and June. This site told the state it qualifies for a reduced schedule with fewer samples. When a site samples fewer than its schedule asks, its results may not represent its true runoff.
Day with rain
Day sampled
2025-26
0 of 10 storms sampledTold the state it sampled every required storm
2024-25
0 of 14 storms sampledTold the state it did not sample every required storm
2023-24
0 of 20 storms sampledTold the state it sampled every required storm
2022-23
1 of 12 storms sampledTold the state it sampled every required storm
2021-22
0 of 5 storms sampledTold the state it did not sample every required storm
2020-21
0 of 0 storms sampledNo annual report on file
JulAugSepOctNovDecJanFebMarAprMayJun
Rainfall comes from the daily records of NOAA station Modesto Airport (USW00023258), 14 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
Location and details
Where the runoff goes
The facility reports that rain running off it drains to City of Patterson.
Storm drains carry this runoff to creeks and the ocean without treatment.
The neighborhood
About 5,838 people live in the neighborhood around this site in Patterson. The state scores it above 64% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6099003201. The score covers the whole neighborhood and does not measure this site's own effect.