San Joaquin Regional Transit has held an industrial stormwater permit for the site since April 2005. Its industry is listed as terminal and service facilities for motor vehicle passenger transportation. Its runoff was over the state benchmark for suspended solids in 2025-26. Under its stormwater permit it is at Exceedance Response Action Level 1 for suspended solids, which means a qualified professional must review its pollution controls.

120 North Filbert St, Stockton

Industrial stormwater

During the 2025-2026 rainy season, the site exceeded the benchmark set by the state for suspended solids.

Its yearly average for suspended solids was 2.4 times the benchmark.

Clean WaterIndustrial stormwater

Over a state benchmark

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 4 of the 12 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Over the benchmark in 2025-26

Suspended solids

243 mg/L7 results, 2 drainage areas

100 mg/L

Exceedance Response Action Level 1

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
BMP24370 mg/L884 mg/L
BMP1375 mg/L100 mg/L
39 results as a table
SampledDrainage areaResult
Apr 21, 2026BMP2471 mg/L
Apr 10, 2026BMP2884 mg/L
Apr 10, 2026BMP1100 mg/L
Nov 13, 2025BMP250 mg/L
Nov 13, 2025BMP152 mg/L
Oct 2, 2025BMP274 mg/L
Oct 2, 2025BMP174 mg/L
Mar 16, 2020BMP234 mg/L
Mar 16, 2020BMP133 mg/L
Jan 16, 2020BMP246 mg/L
Jan 16, 2020BMP160 mg/L
Jan 9, 2020BMP213 mg/L
Jan 9, 2020BMP112 mg/L
Nov 27, 2019BMP266 mg/L
Nov 27, 2019BMP159 mg/L
Feb 26, 2019BMP25 mg/L
Feb 26, 2019BMP18 mg/L
Feb 2, 2019BMP271 mg/L
Feb 2, 2019BMP186 mg/L
Nov 23, 2018BMP28 mg/L
Nov 23, 2018BMP14 mg/L
Oct 3, 2018BMP226 mg/L
Oct 3, 2018BMP149 mg/L
Apr 9, 2018BMP246 mg/L
Apr 9, 2018BMP124 mg/L
Feb 26, 2018BMP222 mg/L
Feb 26, 2018BMP110 mg/L
Jan 8, 2018BMP220 mg/L
Jan 8, 2018BMP113 mg/L
Nov 16, 2017BMP295 mg/L
Nov 16, 2017BMP1120 mg/L
Feb 2, 2017BMP233 mg/L
Feb 2, 2017BMP128 mg/L
Jan 18, 2017BMP235 mg/L
Jan 18, 2017BMP146 mg/L
Dec 8, 2016BMP29 mg/L
Dec 8, 2016BMP17 mg/L
Nov 26, 2016BMP239 mg/L
Nov 26, 2016BMP140 mg/L

Within the benchmark

pH

7.15 to 8.437 results, 2 drainage areas

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsLowestHighest
BMP247.28.4
BMP137.68.4
39 results as a table
SampledDrainage areaResult
Apr 21, 2026BMP28.4
Apr 10, 2026BMP27.8
Apr 10, 2026BMP18
Nov 13, 2025BMP27.2
Nov 13, 2025BMP17.6
Oct 2, 2025BMP28.1
Oct 2, 2025BMP18.4
Mar 16, 2020BMP27.5
Mar 16, 2020BMP17.3
Jan 16, 2020BMP27.8
Jan 16, 2020BMP17.9
Jan 9, 2020BMP27.9
Jan 9, 2020BMP18.4
Nov 27, 2019BMP27.7
Nov 27, 2019BMP17.6
Feb 26, 2019BMP27.5
Feb 26, 2019BMP17.6
Feb 2, 2019BMP27.6
Feb 2, 2019BMP17.6
Nov 23, 2018BMP27.8
Nov 23, 2018BMP17.7
Oct 3, 2018BMP26.7
Oct 3, 2018BMP16.3
Apr 9, 2018BMP27.7
Apr 9, 2018BMP17.8
Feb 26, 2018BMP27.2
Feb 26, 2018BMP17.2
Jan 8, 2018BMP27.4
Jan 8, 2018BMP17.5
Nov 16, 2017BMP27.3
Nov 16, 2017BMP17.4
Feb 2, 2017BMP27.1
Feb 2, 2017BMP17.5
Jan 18, 2017BMP27.3
Jan 18, 2017BMP17.3
Dec 8, 2016BMP27.2
Dec 8, 2016BMP17.3
Nov 26, 2016BMP27.3
Nov 26, 2016BMP17.3

Oil and grease

0.78 mg/L7 results, 2 drainage areas

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
BMP240.94 mg/L1.9 mg/L
BMP130.57 mg/L1.7 mg/L
39 results as a table
SampledDrainage areaResult
Apr 21, 2026BMP2Not detected
Apr 10, 2026BMP21.9 mg/L
Apr 10, 2026BMP11.7 mg/L
Nov 13, 2025BMP21.9 mg/L
Nov 13, 2025BMP1Not detected
Oct 2, 2025BMP2Not detected
Oct 2, 2025BMP1Not detected
Mar 16, 2020BMP2Not detected
Mar 16, 2020BMP1Not detected
Jan 16, 2020BMP21.7 mg/L
Jan 16, 2020BMP1Not detected
Jan 9, 2020BMP21.2 mg/L
Jan 9, 2020BMP1Not detected
Nov 27, 2019BMP21.8 mg/L
Nov 27, 2019BMP11.6 mg/L
Feb 26, 2019BMP2Not detected
Feb 26, 2019BMP1Not detected
Feb 2, 2019BMP2Not detected
Feb 2, 2019BMP1Not detected
Nov 23, 2018BMP2Not detected
Nov 23, 2018BMP1Not detected
Oct 3, 2018BMP2Not detected
Oct 3, 2018BMP11.6 mg/L
Apr 9, 2018BMP2Not detected
Apr 9, 2018BMP14.3 mg/L
Feb 26, 2018BMP22.1 mg/L
Feb 26, 2018BMP1Not detected
Jan 8, 2018BMP2Not detected
Jan 8, 2018BMP1Not detected
Nov 16, 2017BMP2Not detected
Nov 16, 2017BMP15.2 mg/L
Feb 2, 2017BMP2Not detected
Feb 2, 2017BMP1Not detected
Jan 18, 2017BMP2Not detected
Jan 18, 2017BMP10 mg/L
Dec 8, 2016BMP20 mg/L
Dec 8, 2016BMP10 mg/L
Nov 26, 2016BMP20 mg/L
Nov 26, 2016BMP1Not detected

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

4 of 12 storms sampledTold the state it sampled every required storm

2024-25

0 of 12 storms sampledTold the state it sampled every required storm

2023-24

0 of 19 storms sampledTold the state it did not sample every required storm

2022-23

0 of 15 storms sampledTold the state it did not sample every required storm

2021-22

0 of 8 storms sampledTold the state it sampled every required storm

2020-21

0 of 10 storms sampledTold the state it sampled every required storm

Rainfall comes from the daily records of NOAA station Stockton Airport (USW00023237), 5.1 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to San Joaquin River Deepwater.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 6,107 people live in the neighborhood around this site in Stockton. The state scores it above 98% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6077001900. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
Terminal and Service Facilities for Motor Vehicle Passenger Transportation
Operator
San Joaquin Regional Transit
Covered by
Industrial stormwater permit
Stormwater permit since
April 2005
Site size
6 acres
State stormwater ID
5S39I019417

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report