Construction stormwater
The state says this construction site needs a stormwater permit and has none on file.
It is listed as "NOI Required" in the state's permit system. The Water Board recorded 1 violation and took 2 enforcement actions.
6709 Walnut Ave, Orangevale, CA 95662
Mickey Iliescu operates the site. The state has told it to get a construction stormwater permit.
We could not place this address on the map.
The state says this construction site needs a stormwater permit and has none on file.
It is listed as "NOI Required" in the state's permit system. The Water Board recorded 1 violation and took 2 enforcement actions.
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.
At its risk level, the permit does not require samples of discharges, so no results are expected.
Listed as the Water Board recorded them.
| Date | Type | What the Water Board recorded |
|---|---|---|
| Jan 24, 2019 | Failure to Obtain PermitClass 2 | Coverage terminated by State Board for not paying annual invoices. Needs to re-file for coverage.The Water Board marks this violation as serious. |
Notices, orders, and penalties the Water Board issued.
| Date | Action | Details | Penalty |
|---|---|---|---|
| Mar 6, 2019 | Notice of non-compliance | Second NNC for failure to obtain permit coverage.Status: Active | |
| Jan 24, 2019 | Notice of non-compliance | NONC for not filing for permit coverage after State Board terminated coverage for not paying annual invoices.Status: Historical |
Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.
Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.