Construction stormwater
On 4 days in the last 12 months, a discharge from this construction site was above the permit's action level for pH.
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge. The permit does not count a day above an action level as a violation. The Water Board has recorded no violations and taken no enforcement actions here.