Pacific Street Development Holding Company LLC operates the site. Its discharge was above the permit's action level on 7 days in the last 12 months.

Along Pacific Street between Pine and Oak Street, Rocklin

Construction stormwater

On 7 days in the last 12 months, a discharge from this construction site was above the permit's action level for pH and turbidity.

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge. The permit does not count a day above an action level as a violation. The Water Board has recorded no violations and taken no enforcement actions here.

Clean WaterConstruction stormwater

Above the permit's action level

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Construction stormwater permit
Risk level
Risk level 2The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
November 2025
Disturbed area
3 acres
Project
Residential
Drains to
Antelope Creek
State permit ID
5S31C410520

Days above the permit's action level

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.

DateDischarge pointMeasureDay's valueLevel
Apr 21, 2026SP #3Turbidity1,000 NTUabove 250 NTU
Apr 21, 2026SP #5Turbidity1,000 NTUabove 250 NTU
Apr 21, 2026SP #6pH8.6above 8.5
Apr 10, 2026SP #1Turbidity294 NTUabove 250 NTU
Mar 20, 2026Puddle beneath leaking PalletTurbidity1,000 NTUabove 250 NTU
Feb 20, 2026SP #1Turbidity800 NTUabove 250 NTU
Feb 19, 2026SP #1Turbidity1,000 NTUabove 250 NTU
Feb 19, 2026SP #2Turbidity831 NTUabove 250 NTU
Feb 19, 2026SP #3Turbidity451 NTUabove 250 NTU
Feb 17, 2026SP #1Turbidity1,000 NTUabove 250 NTU
Feb 17, 2026SP #2Turbidity1,000 NTUabove 250 NTU
Feb 17, 2026SP #3Turbidity309 NTUabove 250 NTU
Feb 16, 2026SP #1Turbidity1,000 NTUabove 250 NTU
Feb 16, 2026SP #2Turbidity1,000 NTUabove 250 NTU
Feb 16, 2026SP #3Turbidity474 NTUabove 250 NTU
All field readings (15)
DateDischarge pointpHTurbidity
Apr 21, 2026SP #38.51,000 NTU
Apr 21, 2026SP #57.91,000 NTU
Apr 21, 2026SP #68.6111 NTU
Apr 10, 2026SP #18.4294 NTU
Mar 20, 2026Puddle beneath leaking Pallet7.41,000 NTU
Feb 20, 2026SP #18.2800 NTU
Feb 19, 2026SP #18.41,000 NTU
Feb 19, 2026SP #28.1831 NTU
Feb 19, 2026SP #38.3451 NTU
Feb 17, 2026SP #18.11,000 NTU
Feb 17, 2026SP #27.81,000 NTU
Feb 17, 2026SP #37.8309 NTU
Feb 16, 2026SP #18.31,000 NTU
Feb 16, 2026SP #27.91,000 NTU
Feb 16, 2026SP #38.4474 NTU

Violations the Water Board recorded

None

Enforcement actions

None

Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.

Location and details

The neighborhood

About 5,239 people live in the neighborhood around this site in Rocklin. The state scores it above 46% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6061021103. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Operator
Pacific Street Development Holding Company LLC
Covered by
Construction stormwater permit

The state stormwater record

Other sites nearby

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report