Georgia Pacific Building Products LLC has held an industrial stormwater permit for the site since February 2007. Its industry is listed as gypsum products. The permit requires samples of its runoff, and the last one it filed is from February 2025.

801 Minaker Dr, Antioch

Industrial stormwater

This site filed no samples of its runoff in the 2025-2026 reporting year, although rain records show 15 storms of a tenth of an inch or more near it.

The permit requires samples in each half of the year, July to December and January to June. The last sample it filed is from February 2025.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2024-25

The facility sampled 1 of the 12 storms of a tenth of an inch or more near the site in 2024-25.

The permit generally requires samples from four storms a year, with few exceptions.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2024-25

pH

7.65 to 7.651 result

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

5 results as a table
SampledDrainage areaResult
Feb 13, 2025Outfall 0017.7
Jan 14, 2023Outfall 0016
Jan 9, 2023Outfall 0016
Dec 31, 2022Outfall 0016.2
Jan 19, 2016Outfall 0017.4

Suspended solids

1.4 mg/L1 result

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

5 results as a table
SampledDrainage areaResult
Feb 13, 2025Outfall 0011.4 mg/L
Jan 14, 2023Outfall 001Not detected
Jan 9, 2023Outfall 001Not detected
Dec 31, 2022Outfall 0015.3 mg/L
Jan 19, 2016Outfall 0015.4 mg/L

Oil and grease

Not detected1 result

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

5 results as a table
SampledDrainage areaResult
Feb 13, 2025Outfall 001Not detected
Jan 14, 2023Outfall 001Not detected
Jan 9, 2023Outfall 001Not detected
Dec 31, 2022Outfall 001Not detected
Jan 19, 2016Outfall 001Not detected

Lead

Not detected1 result

0.262 mg/L

All results for lead

A nerve poison for people and wildlife that builds up in sediment.

4 results as a table
SampledDrainage areaResult
Feb 13, 2025Outfall 001Not detected
Jan 14, 2023Outfall 001Not detected
Jan 9, 2023Outfall 001Not detected
Dec 31, 2022Outfall 0010.0021 mg/L

Iron

0.035 mg/L1 result

1 mg/L

All results for iron

Settles out as rust-colored sludge that smothers creek beds. The state took its iron benchmark from a 2008 EPA benchmark that the EPA has since stopped using.

5 results as a table
SampledDrainage areaResult
Feb 13, 2025Outfall 0010.035 mg/L
Jan 14, 2023Outfall 0010.059 mg/L
Jan 9, 2023Outfall 0010.14 mg/L
Dec 31, 2022Outfall 0010.73 mg/L
Jan 19, 2016Outfall 0010.14 mg/L

Mercury

Not detected1 result

0.0014 mg/L

All results for mercury

4 results as a table
SampledDrainage areaResult
Feb 13, 2025Outfall 001Not detected
Jan 14, 2023Outfall 001Not detected
Jan 9, 2023Outfall 001Not detected
Dec 31, 2022Outfall 001Not detected

Tested once or twice and within the benchmark: zinc, aluminum, selenium.

Also tested, with no state benchmark to compare against: 1 result for electrical conductivity @ 25 deg. C, 1 for manganese, and 1 for sulfate (as S).

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

0 of 15 storms sampledTold the state: not enough qualifying storms occurred; storms did not produce a discharge; all stormwater was retained on site

2024-25

1 of 12 storms sampledTold the state it did not sample every required storm

2023-24

0 of 23 storms sampledTold the state it did not sample every required storm

2022-23

1 of 13 storms sampledTold the state it sampled every required storm

2021-22

0 of 8 storms sampledTold the state it did not sample every required storm

2020-21

0 of 18 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station Mount Diablo Junction (USC00045915), 12 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to San Joaquin River.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 4,612 people live in the neighborhood around this site in Antioch. The state scores it above 73% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6013306002. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
Gypsum Products
Operator
Georgia Pacific Building Products LLC
Covered by
Industrial stormwater permit
Stormwater permit since
February 2007
Site size
37 acres
Paved or roofed
50% of the site
State stormwater ID
5S07I020674

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report