Cortina No1 60kV Line Reconductoring Landing Zone 6
SW of 1241 Putnam Wy, Arbuckle, CA 95912
Pacific Gas and Electric Company operates the site. At its risk level, the permit does not require discharge samples.
SW of 1241 Putnam Wy, Arbuckle
Construction stormwater
This construction site is at linear project type 1, so it does not have to sample its discharges.
There are no results to compare with the permit's action levels. The Water Board has recorded no violations and taken no enforcement actions here.
Clean WaterConstruction stormwater
No discharge results
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Construction stormwater permit for a linear project
Project type
Linear project type 1The permit does not require samples of discharges at this level.
Status in the state system
Active
Covered since
June 2026
Disturbed area
2.77 acres
Project
Electrical line
State permit ID
5S06C412453
Days above the permit's action level
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.
At linear project type 1, the permit does not require samples of discharges, so no results are expected.
Violations the Water Board recorded
None
Enforcement actions
None
Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.
Location and details
The neighborhood
About 5,151 people live in the neighborhood around this site in Arbuckle. The state scores it above 67% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6011000100. The score covers the whole neighborhood and does not measure this site's own effect.