EarthSpotterEarthSpotter

Fawndale Rock and Asphalt

15380 Fawndale Road, Redding, CA 96003

JF Shea Construction Inc has held an industrial stormwater permit for the site since May 2014. Its industry is listed as crushed and broken stone. Its runoff was over the state benchmark for suspended solids in 2025-26. Under its stormwater permit it is at Exceedance Response Action Level 1 for suspended solids, which means a qualified professional must review its pollution controls.

15380 Fawndale Road, Redding

Industrial stormwater

During the 2025-2026 rainy season, the site exceeded the benchmark set by the state for suspended solids.

Its yearly average for suspended solids was 1.2 times the benchmark.

Clean WaterIndustrial stormwater

Over a state benchmark

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 4 of the 20 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Over the benchmark in 2025-26

Suspended solids

118 mg/L4 results

100 mg/L

Exceedance Response Action Level 1

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

15 results as a table
SampledDrainage areaResult
Apr 1, 2026EFF001273 mg/L
Feb 19, 2026EFF0018 mg/L
Dec 19, 2025EFF001143 mg/L
Nov 17, 2025EFF00146 mg/L
Jan 27, 2020EFF0016 mg/L
Jan 15, 2019EFF001Not detected
Jan 8, 2019EFF0015 mg/L
Mar 22, 2018EFF0014.7 mg/L
Jan 12, 2017EFF0016.3 mg/L
Jan 4, 2017EFF00137 mg/L
Dec 14, 2016EFF00118 mg/L
Jan 29, 2016EFF00128 mg/L
Jan 7, 2016EFF00115 mg/L
Dec 21, 2015EFF00113 mg/L
Dec 14, 2015EFF0015.6 mg/L

Within the benchmark

Oil and grease

1.1 mg/L4 results

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

15 results as a table
SampledDrainage areaResult
Apr 1, 2026EFF0011.3 mg/L
Feb 19, 2026EFF001Not detected
Dec 19, 2025EFF0012.3 mg/L
Nov 17, 2025EFF0010.85 mg/L
Jan 27, 2020EFF001Not detected
Jan 15, 2019EFF001Not detected
Jan 8, 2019EFF001Not detected
Mar 22, 2018EFF001Not detected
Jan 12, 2017EFF001Not detected
Jan 4, 2017EFF001Not detected
Dec 14, 2016EFF0011.7 mg/L
Jan 29, 2016EFF001Not detected
Jan 7, 2016EFF001Not detected
Dec 21, 2015EFF001Not detected
Dec 14, 2015EFF001Not detected

Not tested in the latest year

Figures are from the last year each was tested.

pH

8.17 to 8.171 result

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

11 results as a table
SampledDrainage areaResult
Jan 27, 2020EFF0018.2
Jan 15, 2019EFF0017.9
Jan 8, 2019EFF0018.2
Mar 22, 2018EFF0017.8
Jan 12, 2017EFF0017.7
Jan 4, 2017EFF0017.1
Dec 14, 2016EFF0016.9
Jan 29, 2016EFF0018.1
Jan 7, 2016EFF0018
Dec 21, 2015EFF0018.1
Dec 14, 2015EFF0017.7

Also tested, with no state benchmark to compare against: 7 results for electrical conductivity @ 25 deg. C.

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

4 of 20 storms sampledTold the state it sampled every required storm

2024-25

0 of 19 storms sampledTold the state it sampled every required storm

2023-24

0 of 23 storms sampledTold the state it sampled every required storm

2022-23

0 of 18 storms sampledTold the state it sampled every required storm

2021-22

0 of 17 storms sampledTold the state it did not sample every required storm

2020-21

0 of 15 storms sampledTold the state it sampled every required storm

Rainfall comes from the daily records of NOAA station Redding 7.9 NNE (US1CASH0010), 4.5 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to West Fork Still Water Creek.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 2,366 people live in the neighborhood around this site in Redding. The state scores it above 25% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6089011803. The score covers the whole neighborhood and does not measure this site's own effect.

Same operator

JF Shea Construction Inc holds 6 other stormwater permits:

Permits and IDs

Industry
Crushed and Broken Stone, NEC
Operator
JF Shea Construction Inc
Covered by
Industrial stormwater permit
Stormwater permit since
May 2014
Site size
41.45 acres
Paved or roofed
1% of the site
State stormwater ID
5R45I024882

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report