Frank Nichols operates the site. The state has told it to get a construction stormwater permit.
We could not place this address on the map.
Construction stormwater
The state says this construction site needs a stormwater permit and has none on file.
It is listed as "NOI Required" in the state's permit system. The Water Board has recorded no violations and taken no enforcement actions here.
Clean WaterConstruction stormwater
Told to get a permit
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Construction stormwater permit
Status in the state system
NOI Required
State permit ID
5R45CN607761
Days above the permit's action level
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.
At its risk level, the permit does not require samples of discharges, so no results are expected.
Violations the Water Board recorded
None
Enforcement actions
None
Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.