Live Oak City, a city agency, operates the site. Its industry is listed as wastewater treatment facility. It reports monitoring results to the state.

3450 Treatment Road, Live Oak

General permit

This facility reports monitoring results to the state.

The permit's limits are not available to compare them with. The Water Board took 64 enforcement actions, 6 of which required a penalty.

Clean WaterGeneral permit

Limits not available

Clean Water Act. Source: California State Water Resources Control Board and U.S. Environmental Protection Agency, data as of November 25, 2026.

Facility type
General permit: Sewage plants that meet water quality standards at the discharge point
Discharger
Live Oak City
Regional Water Board
Region 5S
Size
Major facilityAs the EPA classes it.
Design flow
1.4 million gallons a day
Discharges to
Reclamation District 777 Lateral Drain No 1

What the public records hold

Monitoring results
19 parameters at 3 monitoring points, latest Sep 30, 2026
Permit limits
Not available
Reported values over the permit's limit, last three years
Not available
Violations the Water Board recorded
Not available
Enforcement actions
64Has been required to pay penalties.

Permit

PermitTypeStatusEffectiveExpires
CAC444735Order R5-2023-0025Sewage plants that meet water quality standards at the discharge pointGeneral permitActiveSep 1, 2021Oct 1, 2028

What the facility reported

Results the facility reported to the state for the last three years, one row per pollutant as the permit lists them. A pollutant over its limit opens to each value over: which limit, where, and when. Each month shows the monthly average the facility reported, or the highest result that month when it filed no average.

What it discharges
ParameterLatest resultHistory
FlowEFF-0010.7 MGDSep 30, 2026
Ammonia (as N)EFF-0010.06 mg/LSep 30, 2026
pHEFF-0017.7 SUSep 30, 2026
TemperatureEFF-00124 Degrees CSep 30, 2026
Biochemical oxygen demand (BOD)EFF-001Not detectedSep 30, 2026
Dissolved oxygenEFF-0018.6 mg/LSep 30, 2026
Dissolved Oxygen, saturationEFF-001103 %Sep 30, 2026
Total suspended solidsEFF-001Not detectedSep 30, 2026
Electrical conductivityEFF-001787 umhos/cmSep 2, 2026
BOD, percent removalEFF-001100 %Sep 1, 2026
Total suspended solids, percent removalEFF-001100 %Sep 1, 2026
Dissolved Organic CarbonEFF-0016.7 mg/LJul 9, 2026
Total dissolved solidsEFF-001519 mg/LJul 9, 2026
Hardness, Ca (as CaCO3)EFF-001230 mg/LJan 8, 2026
Chronic toxicity3 tests at EFF-001
Hardness (as CaCO3)EFF-001249 mg/LJul 9, 2026
Methyl MercuryEFF-001Not detectedJan 22, 2026
Acute toxicity1 test at EFF-001
The water it discharges to
ParameterLatest resultHistory
pHAt RSW-001 and RSW-002
TemperatureAt RSW-001 and RSW-002
Dissolved oxygenAt RSW-001 and RSW-002
Dissolved Oxygen, saturationAt RSW-001 and RSW-002
TurbidityAt RSW-001 and RSW-002
Electrical conductivityAt RSW-001 and RSW-002
Dissolved Organic CarbonAt RSW-001 and RSW-002
Hardness, Ca (as CaCO3)At RSW-001 and RSW-002
Hardness (as CaCO3)At RSW-001 and RSW-002

Reported values over the permit's limit

Monthly reports the facility filed with the EPA, compared with the permit's limit for the same measure. A value counts only when it was detected and the limit was in force on that date.

Not available

Violations the Water Board recorded

Not available. The Water Board's violation records for this kind of facility are not published as data we can read.

Enforcement actions

Notices, orders, and penalties the Water Board issued.

DateActionDetailsPenalty
May 28, 2026Notice of ViolationStatus: Historical
Jun 2, 2025Notice of ViolationStatus: Historical
Sep 24, 2024Administrative Civil LiabilityOrder R5-2024-0507The alleged mandatory minimum penalty, in the amount of three thousand dollars ($3,000), represents the sum of accrued mandatory minimum penalties for effluent limitation violations specifically identified in the Record of Violations (Attachment A), attached hereto and incorporated herein by reference, that occurred from 1 February 2017 through 31 December 2023.The Water Board marks this as a mandatory minimum penalty.Status: HistoricalPenalty required
May 31, 2024Notice of ViolationStatus: Historical
May 30, 2023Notice of ViolationStatus: Historical
Nov 9, 2022Notice of ViolationStatus: Historical
Mar 15, 2022Notice of ViolationStatus: Historical
Nov 23, 2021Notice of ViolationStatus: Historical
Nov 20, 2020Notice of ViolationStatus: Historical
Oct 16, 2020Notice of ViolationStatus: Historical
Jan 8, 2020Notice of ViolationStatus: Historical
Oct 9, 2019Notice of ViolationStatus: Historical
Mar 20, 2019Notice of ViolationStatus: Historical
Oct 22, 2018Notice of ViolationStatus: Historical
Jun 22, 2018Notice of ViolationStatus: Historical
Jul 20, 2017Administrative Civil LiabilityOrder R5-2017-0542The Complaint charges the Discharger with administrative civil liability in the amount of $12,000 for effluent limitation violations that occurred between 1 July 2016 and 31 January 2017. The Complaint alleges two nitrate and two arsenic violations.Status: HistoricalPenalty required
Jan 26, 2017Notice of ViolationStatus: Historical
Jul 27, 2016Notice of ViolationStatus: Historical
Jan 25, 2016Notice of ViolationStatus: Historical
Aug 25, 2015Notice of ViolationStatus: Historical
Apr 7, 2015Notice of ViolationStatus: Historical
Feb 3, 2015Notice of ViolationStatus: Historical
Oct 2, 2014Notice of ViolationStatus: Historical
Jul 24, 2014Notice of ViolationStatus: Historical
Dec 23, 2013Notice of ViolationStatus: Historical
Jul 22, 2013Notice of ViolationStatus: Historical
Apr 12, 2013Notice of ViolationStatus: Historical
Nov 8, 2012Notice of ViolationDuring the monitoring periods July 2012 and August 2012 the discharge violated the limitations contained in the WDRs.Status: Historical
Aug 29, 2012Notice of ViolationDuring the monitoring periods June 2012 and Second Quarter 2012 the discharge violated the limitations contained in the WDRs.Status: Historical
Jun 25, 2012Notice of ViolationDuring the monitoring period April 2012 the discharge violated the limitations contained in the WDRs.Status: Historical
Jun 22, 2012Administrative Civil LiabilityMMP Order issued in the amount of $288,000 for effluent limitation violations from 03/01/2011 to 03/31/2012. There were 47 serious and 49 non-serious violations. This Order allows an additional $288,000 in mandatory minimum penalties to be applied to the same project and compliance dates as ACLO R5-2011-0583. The Discharger will have spent a total of $1,410,000 towards completion of treatment plant upgrades in lieu of making a cash payment for the total accrued mandatory minimum penalties.The Water Board marks this as a mandatory minimum penalty.Status: Historical
May 21, 2012Notice of ViolationStatus: Historical
Apr 27, 2012Notice of ViolationThe inspection was conducted on 5 March 2012 by PG Environmental, LLC, a USEPA contractor. Out of the ten areas evaluated, the inspector found two areas (Records and Reports, Laboratory) to be marginal, and two areas to be unsatisfactory (Self-Monitoring Program, Operations and Maintenance). The remaining six areas were found to be satisfactory.Status: Historical
Apr 20, 2012Notice of ViolationStatus: Historical
Mar 28, 2012Notice of ViolationStatus: Historical
Feb 24, 2012Notice of ViolationDuring the monitoring periods 1 March 2011 - 30 September 2011 the discharge violated the limitations contained in the WDRs.Status: Historical
Dec 23, 2011Notice of ViolationDuring the monitoring periods August 2011 and September 2011 the discharge violated the limitation contained in the WDRs.Status: Historical
Sep 27, 2011Notice of ViolationDuring the monitoring periods June 2011, July 2011, and Second Quarter 2011 the discharge violated the limitations contained in the WDRs.Status: Historical
Jul 26, 2011Notice of ViolationStaff conducted inspection in March 2011 and these vilations were noted during the inspection.Status: Historical
Jul 21, 2011Notice of ViolationStatus: Historical
Jun 24, 2011Administrative Civil LiabilityOrder R5-2011-0583MMP Order issued in the amount of $387,000 for effluent limitation violations from 11/1/2010 to 2/28/2011. There were 71 serious and 58 non-serious violations. This Order allows an additional $387,000 in mandatory minimum penalties to be applied to the same project and contains the same compliance dates as ACL Order R5-2011-0516. After this Order has been issued, the Discharger will have spent a total of $1,122,000 towards the completion of the treatment plant upgrades.The Water Board marks this as a mandatory minimum penalty.Status: HistoricalPenalty required
Jun 9, 2011Notice of ViolationDuring the monitoring period April 2011 the discharge violated the limitations contained in the WDRs.Status: Historical
May 23, 2011Notice of ViolationDuring the monitoring period March 2011 the discharge violated the limitations contained in the WDRs.Status: Historical
Apr 8, 2011Notice of ViolationDuring the monitoring period February 2011 the discharge violated the limitations contained in the WDRs.Status: Historical
Mar 28, 2011Notice of ViolationDuring the monitoring periods November 2010 through January 2011 the discharge violated the limitations contained in the WDRs.Status: Historical
Mar 15, 2011Notice of ViolationDuring the monitoring period January 2011 the discharge violated the limitations contained in the WDRs.Status: Historical
Feb 8, 2011Notice of ViolationDuring the monitoring period December 2010 the discharge violated the effluent limitations contained in the WDRs and the Receiving Water limitations set forth in the WDRs. December 2010 SMR does not fully comply with the MPR requirements.Status: Historical
Feb 4, 2011Administrative Civil LiabilityOrder R5-2011-0516MMP Order issued in the amt. of $627,000 for effl limitation viols from 7/1/03 to 10/31/10. There are 140 serious & 9 non-serious violations. Some of these viols were omitted from MMPO R5-2009-0587. The entire $627,000 penalty shall be deemed satisfied by the Water Board through the expenditure of an equivalent or greater amt. on completion of a compliance project for approx. $20 million to construct an upgraded wwpt designed to bring the facility into compliance with its NPDES permit & CDO.The Water Board marks this as a mandatory minimum penalty.Status: HistoricalPenalty required
Jan 14, 2011Notice of ViolationDuring the monitoring period November 2010 the discharge violated the effluent limitations contained in the WDRs and the receiving water limitation set forth in the WDRs. November 2010 SMR does not fully comply with the MRP requirements.Status: Historical
Dec 17, 2010Notice of ViolationDuring the monitoring period October 2010 the dischage violated the effluent limitations contained in the WDRs and resulted in a violation of the receiving water DO limitation set forth in WDRs.Status: Historical
Nov 24, 2010Notice of ViolationSeptember 2010 SMR does not fully comply with the MRP requirements.Status: Historical
Oct 25, 2010Notice of ViolationDuring the monitoring period August 2010 the discharge violated effluent limitations contained in the WDRs and violated the Receiving Water limitations set forth in WDRs. August 2010 SMR does not fully comply with the MRP requirements.Status: Historical
Oct 1, 2010Notice of ViolationDuring the discharge period July 2010 the discharge violated the effluent limitations contained in the WDRs and violated the receiving water limitations set forth in the WDRs. July 2010 SMR does not fully comply with the MRP requirements.Status: Historical
Aug 24, 2010Notice of ViolationDuring monitoring period June 2010 the discharge violated the effluent limitations and receiving water and treatment lagoon limitations contained in the WDRs. June 2010 SMR does not fully comply with the MRP requirements.Status: Historical
Jul 27, 2010Notice of ViolationIn May 2010 the discharge violated the effluent limitations contained in the WDRs. May 2010 SMR does not fully comply with the MRP requirements.Status: Historical
Dec 9, 2009Administrative Civil LiabilityOrder R5-2009-0587MMP Order R5-2009-0587 issued in the amount of $108,000 for 14 serious & 22 non-serious effluent limitation violations from 7/1/03 to 6/30/09. This order settles MMP Complaint R5-2008-0605 issued for $66,000 for effluent limitation viol from 7/1/2003 to 3/31/2009 with 5 serious & 17 non-serious violations. This discharger serves a small community with financial hardship which allows for a Compliance Project for the construction of an upgraded wwtp to bring the facility into compliance.The Water Board marks this as a mandatory minimum penalty.Status: HistoricalPenalty required
Nov 25, 2009Notice of ViolationStatus: Historical
Apr 24, 2009Cease and Desist OrderOrder R5-2009-0012-01CDO issued for discharger to comply with WDRs Order No. R5-2004-0096 Effluent Limitations B.2., for aluminum, ammonia, BOD, copper, cyanide, diazinon, total coliform, TSS, turbidity, Effluent Limitations B.4 requiring 85% BOD and TSS removal, and Effluent Limitations B.8. requiring tertiary treatment.Status: Historical
Feb 5, 2009Cease and Desist OrderOrder R5-2009-0012Cease and Desist order issued for violations of wdrs and cdo.Status: Superceded
Feb 5, 2009Cease and Desist OrderOrder R5-2009-0012CDO issued to give discharger time schedule to assure compliance with WDRs Order No. R5-2004-0096 Effluent Limitations B.2., for aluminum, ammonia, BOD, copper, cyanide, diazinon, total coliform, TSS, turbidity, Effluent Limitations B.4 requiring 85 percent BOD and TSS removal, and Effluent Limitations B.8. requiring tertiary treatment. Rescinded by R5-2009-0012-01.Status: Historical
Jul 9, 2004Cease and Desist OrderOrder R5-2004-0097Cease and Desist Order for existing and threatened violations of new effluent limitations contained in Order #R5-2004-0096 for aluminum, ammonia, diazinon, and organochlorine pesticdes.Status: Historical
Aug 6, 2003Administrative Civil LiabilityOrder R5-2003-0511Mandatory Minimum Penalty Complaint No. R5-2003-0511 for effluent violations occurring from 1 January 2000 through 30 June 2003 in the amount of $879,000.The Water Board marks this as a mandatory minimum penalty.Status: HistoricalPenalty required
Aug 24, 2000Notice of Violation24 August 2000: NOV issued for receiving water reporting violations.Status: Historical
Apr 30, 1999Cease and Desist OrderOrder R5-1999-0009CITY OF LIVE OAK CEASE AND DESIST ORDER. For past and threatened violations of chlorine, coliform, pH, and acute toxicity effluent limitations.Status: Historical

Sources: the State Water Board's permit, monitoring, and enforcement records (CIWQS) and the EPA's monthly reports and permit limits (ICIS-NPDES). The Water Board's record for this facility (CIWQS).

Location and details

The neighborhood

About 4,423 people live in the neighborhood around this site in Live Oak. The state scores it above 67% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6101050701. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
Wastewater Treatment Facility
Operator
Live Oak City
Covered by
General discharge permit

The Water Board's record for this facility (CIWQS)

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report