City of Oxnard, a city agency, operates the site. It has filed no discharge results.
1, Oxnard
Construction stormwater
This construction site has filed no discharge results.
A site samples only when a storm makes it discharge. With no results, there is nothing to compare with the permit's action levels. The Water Board has recorded no violations and taken no enforcement actions here.
Clean WaterConstruction stormwater
No discharge results
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Construction stormwater permit
Risk level
Risk level 2The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
April 2025
Disturbed area
27.3 acres
Project
Transportation
State permit ID
4 56C406648
Days above the permit's action level
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.
Date
Discharge point
Measure
Day's value
Level
Oct 14, 2025
DI-1
Turbidity
640 NTU
above 250 NTU
All field readings (1)
Date
Discharge point
pH
Turbidity
Oct 14, 2025
DI-1
7.8
640 NTU
Violations the Water Board recorded
None
Enforcement actions
None
Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.
Location and details
The neighborhood
About 1,705 people live in the neighborhood around this site in Oxnard. The state scores it above 72% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6111004704. The score covers the whole neighborhood and does not measure this site's own effect.