EarthSpotterEarthSpotter

Tonnage Industrial

1539 Cota Avenue, Long Beach, CA 90813

Tonnage Industrial has held an industrial stormwater permit for the site since July 2022. Its industry is listed as fabricated structural metal. Every pollutant it tested in 2025-26 averaged within the state benchmarks; it was over a benchmark in 1 of the 4 years it sampled in the last five. Its runoff drains to Consolidated Slip, where a state cleanup plan sets stricter limits for copper, lead, and zinc.

1539 Cota Avenue, Long Beach

Industrial stormwater

During the 2025-2026 rainy season, every pollutant this site tested in its runoff averaged within the state's benchmarks.

That is based on 31 lab results from 2 storm days. It exceeded a benchmark in 1 of the last 4 years it sampled.

Clean WaterIndustrial stormwater

Within the state benchmarks

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 2 of the 10 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because not enough qualifying storms occurred, storms did not produce a discharge, and storms fell outside operating hours.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2025-26

Suspended solids

2.5 mg/L3 results, 3 drainage areas

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
DP-1 Drain Inlet10 mg/L0 mg/L
DP-3 North Building12.3 mg/L2.3 mg/L
SP1, East Storm Drain15.1 mg/L5.1 mg/L
12 results as a table
SampledDrainage areaResult
Feb 16, 2026DP-3 North Building2.3 mg/L
Feb 16, 2026DP-1 Drain InletNot detected
Oct 14, 2025SP1, East Storm Drain5.1 mg/L
Feb 13, 2025SP33.8 mg/L
Feb 13, 2025SP1, East Storm Drain2.1 mg/L
Feb 19, 2024SP3Not detected
Feb 19, 2024SP1, East Storm Drain1.2 mg/L
Feb 1, 2024SP311 mg/L
Feb 1, 2024SP2, Western Border9.2 mg/L
Feb 1, 2024SP1, East Storm Drain1.1 mg/L
Mar 29, 2023SP2, Western Border320 mg/L
Mar 29, 2023SP1, East Storm Drain94 mg/L

Zinc

0.095 mg/L3 results, 3 drainage areas

0.26 mg/L

All results for zinc

Toxic to fish and the small animals they eat, even at low concentrations.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
DP-1 Drain Inlet10.12 mg/L0.12 mg/L
DP-3 North Building10.061 mg/L0.061 mg/L
SP1, East Storm Drain10.1 mg/L0.1 mg/L
12 results as a table
SampledDrainage areaResult
Feb 16, 2026DP-3 North Building0.061 mg/L
Feb 16, 2026DP-1 Drain Inlet0.12 mg/L
Oct 14, 2025SP1, East Storm Drain0.1 mg/L
Feb 13, 2025SP30.077 mg/L
Feb 13, 2025SP1, East Storm Drain0.19 mg/L
Feb 19, 2024SP30.057 mg/L
Feb 19, 2024SP1, East Storm Drain0.17 mg/L
Feb 1, 2024SP30.065 mg/L
Feb 1, 2024SP2, Western Border0.13 mg/L
Feb 1, 2024SP1, East Storm Drain0.45 mg/L
Mar 29, 2023SP2, Western Border0.71 mg/L
Mar 29, 2023SP1, East Storm Drain0.4 mg/L

Iron

0.15 mg/L3 results, 3 drainage areas

1 mg/L

All results for iron

Settles out as rust-colored sludge that smothers creek beds. The state took its iron benchmark from a 2008 EPA benchmark that the EPA has since stopped using.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
DP-1 Drain Inlet10.079 mg/L0.079 mg/L
DP-3 North Building10 mg/L0 mg/L
SP1, East Storm Drain10.37 mg/L0.37 mg/L
12 results as a table
SampledDrainage areaResult
Feb 16, 2026DP-3 North BuildingNot detected
Feb 16, 2026DP-1 Drain Inlet0.079 mg/L
Oct 14, 2025SP1, East Storm Drain0.37 mg/L
Feb 13, 2025SP30.38 mg/L
Feb 13, 2025SP1, East Storm Drain0.41 mg/L
Feb 19, 2024SP30.053 mg/L
Feb 19, 2024SP1, East Storm Drain0.061 mg/L
Feb 1, 2024SP30.56 mg/L
Feb 1, 2024SP2, Western Border0.91 mg/L
Feb 1, 2024SP1, East Storm Drain0.26 mg/L
Mar 29, 2023SP2, Western Border5.2 mg/L
Mar 29, 2023SP1, East Storm Drain2 mg/L

pH

7 to 83 results, 3 drainage areas

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsLowestHighest
DP-1 Drain Inlet188
DP-3 North Building188
SP1, East Storm Drain177
12 results as a table
SampledDrainage areaResult
Feb 16, 2026DP-3 North Building8
Feb 16, 2026DP-1 Drain Inlet8
Oct 14, 2025SP1, East Storm Drain7
Feb 13, 2025SP38
Feb 13, 2025SP1, East Storm Drain8
Feb 19, 2024SP37
Feb 19, 2024SP1, East Storm Drain8
Feb 1, 2024SP38
Feb 1, 2024SP2, Western Border8
Feb 1, 2024SP1, East Storm Drain8
Mar 29, 2023SP2, Western Border7.8
Mar 29, 2023SP1, East Storm Drain7.4

Oil and grease

1.2 mg/L3 results, 3 drainage areas

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
DP-1 Drain Inlet10.9 mg/L0.9 mg/L
DP-3 North Building11.4 mg/L1.4 mg/L
SP1, East Storm Drain11.4 mg/L1.4 mg/L
12 results as a table
SampledDrainage areaResult
Feb 16, 2026DP-3 North Building1.4 mg/L
Feb 16, 2026DP-1 Drain Inlet0.9 mg/L
Oct 14, 2025SP1, East Storm Drain1.4 mg/L
Feb 13, 2025SP3Not detected
Feb 13, 2025SP1, East Storm DrainNot detected
Feb 19, 2024SP31.8 mg/L
Feb 19, 2024SP1, East Storm Drain0.8 mg/L
Feb 1, 2024SP3Not detected
Feb 1, 2024SP2, Western Border1 mg/L
Feb 1, 2024SP1, East Storm DrainNot detected
Mar 29, 2023SP2, Western BorderNot detected
Mar 29, 2023SP1, East Storm Drain2.4 mg/L

Copper

0.011 mg/L3 results, 3 drainage areas

0.0332 mg/L

All results for copper

Toxic to fish at very low concentrations and damages their sense of smell.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
DP-1 Drain Inlet10.011 mg/L0.011 mg/L
DP-3 North Building10.0067 mg/L0.0067 mg/L
SP1, East Storm Drain10.014 mg/L0.014 mg/L
12 results as a table
SampledDrainage areaResult
Feb 16, 2026DP-3 North Building0.0067 mg/L
Feb 16, 2026DP-1 Drain Inlet0.011 mg/L
Oct 14, 2025SP1, East Storm Drain0.014 mg/L
Feb 13, 2025SP30.0034 mg/L
Feb 13, 2025SP1, East Storm Drain0.0046 mg/L
Feb 19, 2024SP30.0052 mg/L
Feb 19, 2024SP1, East Storm Drain0.0023 mg/L
Feb 1, 2024SP30.0032 mg/L
Feb 1, 2024SP2, Western Border0.0056 mg/L
Feb 1, 2024SP1, East Storm Drain0.003 mg/L
Mar 29, 2023SP2, Western Border0.027 mg/L
Mar 29, 2023SP1, East Storm Drain0.017 mg/L

Lead

0.0028 mg/L3 results, 3 drainage areas

0.262 mg/L

All results for lead

A nerve poison for people and wildlife that builds up in sediment.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
DP-1 Drain Inlet10.0059 mg/L0.0059 mg/L
DP-3 North Building10.00081 mg/L0.00081 mg/L
SP1, East Storm Drain10.0016 mg/L0.0016 mg/L
12 results as a table
SampledDrainage areaResult
Feb 16, 2026DP-3 North Building0.00081 mg/L
Feb 16, 2026DP-1 Drain Inlet0.0059 mg/L
Oct 14, 2025SP1, East Storm Drain0.0016 mg/L
Feb 13, 2025SP30.0014 mg/L
Feb 13, 2025SP1, East Storm Drain0.002 mg/L
Feb 19, 2024SP30.00025 mg/L
Feb 19, 2024SP1, East Storm Drain0.00037 mg/L
Feb 1, 2024SP30.0013 mg/L
Feb 1, 2024SP2, Western Border0.0038 mg/L
Feb 1, 2024SP1, East Storm Drain0.00047 mg/L
Mar 29, 2023SP2, Western Border0.0096 mg/L
Mar 29, 2023SP1, East Storm Drain0.0034 mg/L

Aluminum

0.073 mg/L3 results, 3 drainage areas

0.75 mg/L

All results for aluminum

Toxic to fish and aquatic insects. It builds up on gills.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
DP-1 Drain Inlet10.05 mg/L0.05 mg/L
DP-3 North Building10.057 mg/L0.057 mg/L
SP1, East Storm Drain10.11 mg/L0.11 mg/L
12 results as a table
SampledDrainage areaResult
Feb 16, 2026DP-3 North Building0.057 mg/L
Feb 16, 2026DP-1 Drain Inlet0.05 mg/L
Oct 14, 2025SP1, East Storm Drain0.11 mg/L
Feb 13, 2025SP30.12 mg/L
Feb 13, 2025SP1, East Storm Drain0.073 mg/L
Feb 19, 2024SP30.0057 mg/L
Feb 19, 2024SP1, East Storm Drain0.012 mg/L
Feb 1, 2024SP30.053 mg/L
Feb 1, 2024SP2, Western Border0.14 mg/L
Feb 1, 2024SP1, East Storm Drain0.019 mg/L
Mar 29, 2023SP2, Western Border0.97 mg/L
Mar 29, 2023SP1, East Storm Drain0.43 mg/L

Nitrate and nitrite

0.19 mg/L3 results, 3 drainage areas

0.68 mg/L

All results for nitrate and nitrite

Feeds algae blooms that strip oxygen from creeks and lagoons.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
DP-1 Drain Inlet10.14 mg/L0.14 mg/L
DP-3 North Building10.081 mg/L0.081 mg/L
SP1, East Storm Drain10.34 mg/L0.34 mg/L
12 results as a table
SampledDrainage areaResult
Feb 16, 2026DP-3 North Building0.081 mg/L
Feb 16, 2026DP-1 Drain Inlet0.14 mg/L
Oct 14, 2025SP1, East Storm Drain0.34 mg/L
Feb 13, 2025SP30.11 mg/L
Feb 13, 2025SP1, East Storm Drain0.28 mg/L
Feb 19, 2024SP30.43 mg/L
Feb 19, 2024SP1, East Storm Drain0.54 mg/L
Feb 1, 2024SP30.2 mg/L
Feb 1, 2024SP2, Western Border0.2 mg/L
Feb 1, 2024SP1, East Storm Drain0.24 mg/L
Mar 29, 2023SP2, Western Border0.29 mg/L
Mar 29, 2023SP1, East Storm Drain0.23 mg/L

Cadmium

Not detected1 result

0.0053 mg/L

All results for cadmium

3 results as a table
SampledDrainage areaResult
Oct 14, 2025SP1, East Storm DrainNot detected
Mar 29, 2023SP2, Western BorderNot detected
Mar 29, 2023SP1, East Storm DrainNot detected

Nickel

0.0055 mg/L3 results, 3 drainage areas

1.02 mg/L

All results for nickel

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
DP-1 Drain Inlet10.0084 mg/L0.0084 mg/L
DP-3 North Building10.0016 mg/L0.0016 mg/L
SP1, East Storm Drain10.0066 mg/L0.0066 mg/L
12 results as a table
SampledDrainage areaResult
Feb 16, 2026DP-3 North Building0.0016 mg/L
Feb 16, 2026DP-1 Drain Inlet0.0084 mg/L
Oct 14, 2025SP1, East Storm Drain0.0066 mg/L
Feb 13, 2025SP30.00093 mg/L
Feb 13, 2025SP1, East Storm Drain0.0013 mg/L
Feb 19, 2024SP30.0014 mg/L
Feb 19, 2024SP1, East Storm Drain0.001 mg/L
Feb 1, 2024SP3Not detected
Feb 1, 2024SP2, Western Border0.0009 mg/L
Feb 1, 2024SP1, East Storm DrainNot detected
Mar 29, 2023SP2, Western Border0.007 mg/L
Mar 29, 2023SP1, East Storm Drain0.0041 mg/L

Also tested, with no state benchmark to compare against: 2 results for nitrate (as N) and 2 for nitrite (as N).

Stricter limits under the R4 - Los Angeles and Long Beach Harbor Waters cleanup plan

This site drains to Consolidated Slip, which has a cleanup plan. These apply to single results, not yearly averages. Two or more results over in a year count as an exceedance.

PollutantLimitResults over in 2025-26
Copper0.0058 mg/L3 of 3
Lead0.221 mg/L0 of 3
Zinc0.095 mg/L2 of 3

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

2 of 10 storms sampledTold the state: not enough qualifying storms occurred; storms did not produce a discharge; storms fell outside operating hours

2024-25

1 of 6 storms sampledTold the state it did not sample every required storm

2023-24

2 of 17 storms sampledTold the state it did not sample every required storm

2022-23

1 of 16 storms sampledTold the state it did not sample every required storm

2021-22

0 of 0 storms sampledNo annual report on file

2020-21

0 of 0 storms sampledNo annual report on file

Rainfall comes from the daily records of NOAA station Long Beach Daugherty Airport (USW00023129), 4.4 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Dominguez Channel Estuary (unlined portion below Vermont Ave).

The site sits in a watershed with a state cleanup plan for toxic and metals, metals, and nutrients.

Storm drains carry this runoff to creeks and the ocean without treatment.

Same operator

Tonnage Industrial holds 1 other stormwater permit:

Permits and IDs

Industry
Fabricated Structural Metal
Operator
Tonnage Industrial
Covered by
Industrial stormwater permit
Stormwater permit since
July 2022
Site size
0.47 acres
Paved or roofed
97% of the site
State stormwater ID
4 19I029804

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report