Tidelands Oil Production Co has held an industrial stormwater permit for the site since May 2022. Its industry is listed as crude petroleum and natural gas. The permit requires samples of its runoff, and the last one it filed is from October 2025. Under its stormwater permit it is at Exceedance Response Action Level 1 for suspended solids, which means a qualified professional must review its pollution controls.

1150 Pier E Street, Long Beach

Industrial stormwater

This site filed no samples of its runoff in the 2025-2026 reporting year, although rain records show 10 storms of a tenth of an inch or more near it.

The permit requires samples in each half of the year, July to December and January to June. The last sample it filed is from October 2025.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 1 of the 10 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because not enough qualifying storms occurred and storms did not produce a discharge.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2025-26

Suspended solids

66 mg/L1 result

100 mg/L

Exceedance Response Action Level 1

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

11 results as a table
SampledDrainage areaResult
Oct 14, 2025Tidelands ZWP66 mg/L
Mar 13, 2025Tidelands ZWP47 mg/L
Feb 1, 2024Tidelands ZWP17 mg/L
Jan 22, 2024Tidelands ZWP8.8 mg/L
Dec 21, 2023Tidelands ZWP46 mg/L
Nov 15, 2023Tidelands ZWP638 mg/L
Jan 10, 2023Tidelands ZWPNot detected
Jan 5, 2023Tidelands ZWP120 mg/L
Nov 8, 2022Tidelands ZWP23 mg/L
Dec 30, 2021Tidelands ZWP71 mg/L
Dec 23, 2021Tidelands ZWP38 mg/L

pH

6 to 61 result

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

11 results as a table
SampledDrainage areaResult
Oct 14, 2025Tidelands ZWP6
Mar 13, 2025Tidelands ZWP6.6
Feb 1, 2024Tidelands ZWP6.2
Jan 22, 2024Tidelands ZWP6.5
Dec 21, 2023Tidelands ZWP6
Nov 15, 2023Tidelands ZWP6.9
Jan 10, 2023Tidelands ZWP7
Jan 5, 2023Tidelands ZWP8
Nov 8, 2022Tidelands ZWP7.2
Dec 30, 2021Tidelands ZWP6.9
Dec 23, 2021Tidelands ZWP6.8

Oil and grease

3.5 mg/L1 result

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

11 results as a table
SampledDrainage areaResult
Oct 14, 2025Tidelands ZWP3.5 mg/L
Mar 13, 2025Tidelands ZWP2.3 mg/L
Feb 1, 2024Tidelands ZWPNot detected
Jan 22, 2024Tidelands ZWPNot detected
Dec 21, 2023Tidelands ZWP3.8 mg/L
Nov 15, 2023Tidelands ZWP4.3 mg/L
Jan 10, 2023Tidelands ZWPNot detected
Jan 5, 2023Tidelands ZWP2.7 mg/L
Nov 8, 2022Tidelands ZWPNot detected
Dec 30, 2021Tidelands ZWPNot detected
Dec 23, 2021Tidelands ZWP3.5 mg/L

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

1 of 10 storms sampledTold the state: not enough qualifying storms occurred; storms did not produce a discharge

2024-25

1 of 6 storms sampledTold the state it did not sample every required storm

2023-24

4 of 17 storms sampledTold the state it sampled every required storm

2022-23

3 of 16 storms sampledTold the state it did not sample every required storm

2021-22

0 of 1 storm sampledTold the state it did not sample every required storm

2020-21

0 of 0 storms sampledNo annual report on file

Rainfall comes from the daily records of NOAA station Long Beach Daugherty Airport (USW00023129), 4.8 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Long Beach Harbor.

Storm drains carry this runoff to creeks and the ocean without treatment.

Same operator

Tidelands Oil Production Co holds 4 other stormwater permits:

Permits and IDs

Industry
Crude Petroleum and Natural Gas
Operator
Tidelands Oil Production Co
Covered by
Industrial stormwater permit
Stormwater permit since
May 2022
Site size
5.72 acres
State stormwater ID
4 19I029774

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report