EarthSpotterEarthSpotter

Align Precision

20415 East Walnut Drive North, Walnut, CA 91789

Align Precision has held an industrial stormwater permit for the site since April 2021. Its industry is listed as aircraft parts and auxiliary equipment. Every pollutant it tested in 2025-26 averaged within the state benchmarks. The site is in a watershed with a state cleanup plan for metals and selenium.

20415 East Walnut Drive North, Walnut

Industrial stormwater

During the 2025-2026 rainy season, every pollutant this site tested in its runoff averaged within the state's benchmarks.

That is based on 10 lab results from 2 storm days.

Clean WaterIndustrial stormwater

Within the state benchmarks

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 2 of the 11 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because not enough qualifying storms occurred, storms did not produce a discharge, and storms fell outside operating hours.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2025-26

pH

7 to 72 results

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

14 results as a table
SampledDrainage areaResult
Feb 11, 2026SP17
Nov 21, 2025SP17
Feb 6, 2025SP17
Jan 25, 2025SP17
Mar 2, 2024SP17
Feb 1, 2024SP17
Nov 15, 2023SP17
Aug 20, 2023SP17
Feb 23, 2023SP17
Jan 5, 2023SP17
Dec 12, 2022SP17
Mar 28, 2022SP16
Dec 9, 2021SP16
Oct 25, 2021SP16

Suspended solids

Not detected2 results

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

14 results as a table
SampledDrainage areaResult
Feb 11, 2026SP1Not detected
Nov 21, 2025SP1Not detected
Feb 6, 2025SP15.9 mg/L
Jan 25, 2025SP112 mg/L
Mar 2, 2024SP10 mg/L
Feb 1, 2024SP11.6 mg/L
Nov 15, 2023SP111 mg/L
Aug 20, 2023SP10 mg/L
Feb 23, 2023SP120 mg/L
Jan 5, 2023SP14.9 mg/L
Dec 12, 2022SP1Not detected
Mar 28, 2022SP126 mg/L
Dec 9, 2021SP14.2 mg/L
Oct 25, 2021SP111 mg/L

Oil and grease

Not detected2 results

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

14 results as a table
SampledDrainage areaResult
Feb 11, 2026SP1Not detected
Nov 21, 2025SP1Not detected
Feb 6, 2025SP14 mg/L
Jan 25, 2025SP12.3 mg/L
Mar 2, 2024SP11.5 mg/L
Feb 1, 2024SP10 mg/L
Nov 15, 2023SP11.8 mg/L
Aug 20, 2023SP10 mg/L
Feb 23, 2023SP11.2 mg/L
Jan 5, 2023SP10.8 mg/L
Dec 12, 2022SP1Not detected
Mar 28, 2022SP15.4 mg/L
Dec 9, 2021SP12.8 mg/L
Oct 25, 2021SP14.5 mg/L

Iron

0.098 mg/L2 results

1 mg/L

All results for iron

Settles out as rust-colored sludge that smothers creek beds. The state took its iron benchmark from a 2008 EPA benchmark that the EPA has since stopped using.

14 results as a table
SampledDrainage areaResult
Feb 11, 2026SP1Not detected
Nov 21, 2025SP10.2 mg/L
Feb 6, 2025SP10.35 mg/L
Jan 25, 2025SP10.45 mg/L
Mar 2, 2024SP10 mg/L
Feb 1, 2024SP10.042 mg/L
Nov 15, 2023SP10.41 mg/L
Aug 20, 2023SP10.044 mg/L
Feb 23, 2023SP10.052 mg/L
Jan 5, 2023SP1Not detected
Dec 12, 2022SP1Not detected
Mar 28, 2022SP10.58 mg/L
Dec 9, 2021SP10.1 mg/L
Oct 25, 2021SP10.34 mg/L

Aluminum

0.25 mg/L2 results

0.75 mg/L

All results for aluminum

Toxic to fish and aquatic insects. It builds up on gills.

14 results as a table
SampledDrainage areaResult
Feb 11, 2026SP10.045 mg/L
Nov 21, 2025SP10.46 mg/L
Feb 6, 2025SP10.39 mg/L
Jan 25, 2025SP10.43 mg/L
Mar 2, 2024SP10.015 mg/L
Feb 1, 2024SP10.039 mg/L
Nov 15, 2023SP10.71 mg/L
Aug 20, 2023SP10.089 mg/L
Feb 23, 2023SP10.035 mg/L
Jan 5, 2023SP1Not detected
Dec 12, 2022SP10.069 mg/L
Mar 28, 2022SP10.39 mg/L
Dec 9, 2021SP10.24 mg/L
Oct 25, 2021SP10.73 mg/L

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

2 of 11 storms sampledTold the state: not enough qualifying storms occurred; storms did not produce a discharge; storms fell outside operating hours

2024-25

2 of 7 storms sampledTold the state it did not sample every required storm

2023-24

4 of 16 storms sampledTold the state it sampled every required storm

2022-23

3 of 21 storms sampledTold the state it did not sample every required storm

2021-22

3 of 9 storms sampledTold the state it did not sample every required storm

2020-21

0 of 0 storms sampledNo annual report on file

Rainfall comes from the daily records of NOAA station Covina City Yard Fc387b (USC00042090), 6.4 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to San Jose Creek.

The site sits in a watershed with a state cleanup plan for metals and selenium.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 2,350 people live in the neighborhood around this site in Walnut. The state scores it above 43% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6037403326. The score covers the whole neighborhood and does not measure this site's own effect.

Same operator

Align Precision holds 1 other stormwater permit:

Permits and IDs

Industry
Aircraft Parts and Auxiliary Equipment, NEC
Operator
Align Precision
Covered by
Industrial stormwater permit
Stormwater permit since
April 2021
Site size
195577 square feet
State stormwater ID
4 19I029155

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report