EarthSpotterEarthSpotter

Blue Daisy Cement Products

314 East Compton Blvd, Compton, CA 90248

Blue Daisy Cement Products has held an industrial stormwater permit for the site since March 2021. Its industry is listed as ready-mixed concrete. Its runoff was over a state benchmark in each of the last four years it sampled, most recently in 2025-26 for iron. Under its stormwater permit it is at Exceedance Response Action Level 2 for iron, and the site is in a watershed with a state cleanup plan for toxic and metals.

314 East Compton Blvd, Compton

Industrial stormwater

During the 2025-2026 rainy season, the site exceeded the benchmark set by the state for iron.

Its yearly average for iron was 1.6 times the benchmark. It has exceeded at least one benchmark in each of the last four years it sampled.

Clean WaterIndustrial stormwater

Over a state benchmark

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 2 of the 9 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because not enough qualifying storms occurred and storms fell outside operating hours.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Over the benchmark in 2025-26

Iron

1.6 mg/L4 results, 2 drainage areas

1 mg/L

Exceedance Response Action Level 2

All results for iron

Settles out as rust-colored sludge that smothers creek beds. The state took its iron benchmark from a 2008 EPA benchmark that the EPA has since stopped using.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
Sample Point A21.9 mg/L3.4 mg/L
Sample Point B21.2 mg/L2.1 mg/L
21 results as a table
SampledDrainage areaResult
Feb 16, 2026Sample Point B0.35 mg/L
Feb 16, 2026Sample Point A0.44 mg/L
Oct 14, 2025Sample Point B2.1 mg/L
Oct 14, 2025Sample Point A3.4 mg/L
Feb 19, 2024Sample Point B1.3 mg/L
Feb 19, 2024Sample Point A0.82 mg/L
Feb 1, 2024Sample Point B2.9 mg/L
Feb 1, 2024Sample Point A1.1 mg/L
Mar 29, 2023Sample Point B0.9 mg/L
Mar 29, 2023Sample Point A0.42 mg/L
Feb 21, 2023Sample Point B2.4 mg/L
Feb 21, 2023Sample Point A4.7 mg/L
Jan 5, 2023Sample Point B0.58 mg/L
Jan 5, 2023Sample Point A0.53 mg/L
Nov 8, 2022Sample Point B0.5 mg/L
Nov 8, 2022Sample Point A0.64 mg/L
Mar 28, 2022Sample Point B3.2 mg/L
Mar 28, 2022Sample Point A0.92 mg/L
Dec 23, 2021Sample Point B1.5 mg/L
Dec 23, 2021Sample Point A3 mg/L
Oct 25, 2021Sample Point B2 mg/L

Within the benchmark

pH

7.2 to 7.24 results, 2 drainage areas

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsLowestHighest
Sample Point A27.27.2
Sample Point B27.27.2
21 results as a table
SampledDrainage areaResult
Feb 16, 2026Sample Point B7.2
Feb 16, 2026Sample Point A7.2
Oct 14, 2025Sample Point B7.2
Oct 14, 2025Sample Point A7.2
Feb 19, 2024Sample Point B7.8
Feb 19, 2024Sample Point A7.2
Feb 1, 2024Sample Point B7.8
Feb 1, 2024Sample Point A6.8
Mar 29, 2023Sample Point B6.8
Mar 29, 2023Sample Point A7.2
Feb 21, 2023Sample Point B7.8
Feb 21, 2023Sample Point A8.4
Jan 5, 2023Sample Point B7.2
Jan 5, 2023Sample Point A6.8
Nov 8, 2022Sample Point B8
Nov 8, 2022Sample Point A7.8
Mar 28, 2022Sample Point B7.8
Mar 28, 2022Sample Point A7.2
Dec 23, 2021Sample Point B7.8
Dec 23, 2021Sample Point A7.8
Oct 25, 2021Sample Point B7.2

Suspended solids

56 mg/L4 results, 2 drainage areas

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
Sample Point A263 mg/L106 mg/L
Sample Point B248 mg/L75 mg/L
21 results as a table
SampledDrainage areaResult
Feb 16, 2026Sample Point B20 mg/L
Feb 16, 2026Sample Point A20 mg/L
Oct 14, 2025Sample Point B75 mg/L
Oct 14, 2025Sample Point A106 mg/L
Feb 19, 2024Sample Point B42 mg/L
Feb 19, 2024Sample Point A41 mg/L
Feb 1, 2024Sample Point B58 mg/L
Feb 1, 2024Sample Point A15 mg/L
Mar 29, 2023Sample Point B90 mg/L
Mar 29, 2023Sample Point A77 mg/L
Feb 21, 2023Sample Point B79 mg/L
Feb 21, 2023Sample Point A144 mg/L
Jan 5, 2023Sample Point B21 mg/L
Jan 5, 2023Sample Point A18 mg/L
Nov 8, 2022Sample Point B61 mg/L
Nov 8, 2022Sample Point A66 mg/L
Mar 28, 2022Sample Point B108 mg/L
Mar 28, 2022Sample Point A40 mg/L
Dec 23, 2021Sample Point B142 mg/L
Dec 23, 2021Sample Point A60 mg/L
Oct 25, 2021Sample Point B78 mg/L

Oil and grease

1.4 mg/L4 results, 2 drainage areas

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
Sample Point A21.4 mg/L1.4 mg/L
Sample Point B21.5 mg/L1.7 mg/L
21 results as a table
SampledDrainage areaResult
Feb 16, 2026Sample Point B1.4 mg/L
Feb 16, 2026Sample Point A1.3 mg/L
Oct 14, 2025Sample Point B1.7 mg/L
Oct 14, 2025Sample Point A1.4 mg/L
Feb 19, 2024Sample Point B1.1 mg/L
Feb 19, 2024Sample Point A0.8 mg/L
Feb 1, 2024Sample Point B7.2 mg/L
Feb 1, 2024Sample Point A0.8 mg/L
Mar 29, 2023Sample Point B1.4 mg/L
Mar 29, 2023Sample Point A2.1 mg/L
Feb 21, 2023Sample Point B0.8 mg/L
Feb 21, 2023Sample Point A1.4 mg/L
Jan 5, 2023Sample Point B2.9 mg/L
Jan 5, 2023Sample Point A0.8 mg/L
Nov 8, 2022Sample Point B1.5 mg/L
Nov 8, 2022Sample Point A1.1 mg/L
Mar 28, 2022Sample Point B4 mg/L
Mar 28, 2022Sample Point A2.1 mg/L
Dec 23, 2021Sample Point B1.5 mg/L
Dec 23, 2021Sample Point A1.4 mg/L
Oct 25, 2021Sample Point B1.4 mg/L

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

2 of 9 storms sampledTold the state: not enough qualifying storms occurred; storms fell outside operating hours

2024-25

0 of 6 storms sampledTold the state it did not sample every required storm

2023-24

2 of 14 storms sampledTold the state it did not sample every required storm

2022-23

3 of 17 storms sampledTold the state it sampled every required storm

2021-22

3 of 6 storms sampledTold the state it did not sample every required storm

2020-21

0 of 1 storm sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station Hawthorne Municipal Airport (USW00003167), 4.1 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Dominguez Channel (336).

The site sits in a watershed with a state cleanup plan for toxic and metals.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 4,602 people live in the neighborhood around this site in Gardena. The state scores it above 97% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6037541003. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
Ready-Mixed Concrete
Operator
Blue Daisy Cement Products
Covered by
Industrial stormwater permit
Stormwater permit since
March 2021
Site size
65874 square feet
Paved or roofed
94% of the site
State stormwater ID
4 19I029118

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.