Industrial stormwater
This site has filed no samples of its runoff since the current permit began in 2015.
The permit requires testing. It has filed no results for the last three years, so there is no public record of what its runoff contains.
2626 East 26th Street, Vernon, CA 90058
National Ready Mixed Concrete has held an industrial stormwater permit for the site since August 2018. Its industry is listed as ready-mixed concrete. The permit requires samples of its runoff, and it has filed none since its coverage began in August 2018. The site is in a watershed with a state cleanup plan for metals and nutrients.
2626 East 26th Street, Vernon
This site has filed no samples of its runoff since the current permit began in 2015.
The permit requires testing. It has filed no results for the last three years, so there is no public record of what its runoff contains.
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
The facility sampled none of the 9 storms of a tenth of an inch or more near the site in 2025-26.
The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because not enough qualifying storms occurred. It also gave another reason.
The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.
0 of 9 storms sampledTold the state: not enough qualifying storms occurred; another reason
0 of 6 storms sampledTold the state it did not sample every required storm
0 of 15 storms sampledTold the state it did not sample every required storm
0 of 17 storms sampledTold the state it did not sample every required storm
0 of 10 storms sampledTold the state it did not sample every required storm
0 of 7 storms sampledTold the state it did not sample every required storm
Rainfall comes from the daily records of NOAA station Los Angeles Downtown (USW00093134), 3.8 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
The facility reports that rain running off it drains to Los Angeles River Reach 2.
The site sits in a watershed with a state cleanup plan for metals and nutrients.
Storm drains carry this runoff to creeks and the ocean without treatment.
About 331 people live in the neighborhood around this site in Los Angeles. The state scores it above 94% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6037980016. The score covers the whole neighborhood and does not measure this site's own effect.
National Ready Mixed Concrete holds 9 other stormwater permits:
Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.