All American Asphalt has held an industrial stormwater permit for the site since July 2015. Its industry is listed as asphalt paving mixtures and blocks. The permit requires samples of its runoff, and the last one it filed is from February 2026. The site is in a watershed with a state cleanup plan for metals and selenium.
13646 Live Oak Lane, Irwindale
Industrial stormwater
This site filed no samples of its runoff in the 2025-2026 reporting year, although rain records show 12 storms of a tenth of an inch or more near it.
The permit requires samples in each half of the year, July to December and January to June. The last sample it filed is from February 2026.
Clean WaterIndustrial stormwater
Missing samples
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Rain and sampling in 2025-26
The facility sampled 1 of the 12 storms of a tenth of an inch or more near the site in 2025-26.
The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because storms did not produce a discharge.
What the samples show
The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.
Yearly average, over
Yearly average, within
Single lab result
State benchmark
Tested in 2025-26
Pollutant2025-26 averageBenchmarkLast five years
pH
6 to 61 result
6 to 9
Over in 0 of 3 years tested
All results for pH
Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.
8 results as a table
Sampled
Drainage area
Result
Feb 19, 2026
Outfall #1
6
Mar 7, 2025
Outfall #1
6.5
Feb 13, 2025
Outfall #1
6.5
Mar 7, 2024
Outfall #1
6.5
Jan 22, 2024
Outfall #1
6.5
Feb 1, 2019
Outfall #1
6.5
Mar 23, 2018
Outfall #1
6.5
Feb 6, 2017
Outfall #1
7.1
Suspended solids
36 mg/L1 result
100 mg/L
Over in 0 of 3 years tested
All results for suspended solids
Mud and fine particles that cloud water, bury habitat, and carry other pollutants.
9 results as a table
Sampled
Drainage area
Result
Feb 19, 2026
Outfall #1
36 mg/L
Mar 7, 2025
Outfall #1
150 mg/L
Feb 13, 2025
Outfall #1
20 mg/L
Mar 7, 2024
Outfall #1
26 mg/L
Jan 22, 2024
Outfall #1
51 mg/L
Feb 1, 2019
Outfall #1
90 mg/L
Mar 23, 2018
Outfall #1
22 mg/L
Feb 17, 2017
Outfall #1
180 mg/L
Feb 6, 2017
Outfall #1
20 mg/L
Oil and grease
Not detected1 result
15 mg/L
Over in 0 of 3 years tested
All results for oil and grease
Coats plants and animals and blocks oxygen from entering the water.
9 results as a table
Sampled
Drainage area
Result
Feb 19, 2026
Outfall #1
Not detected
Mar 7, 2025
Outfall #1
Not detected
Feb 13, 2025
Outfall #1
5.3 mg/L
Mar 7, 2024
Outfall #1
3.4 mg/L
Jan 22, 2024
Outfall #1
5.1 mg/L
Feb 1, 2019
Outfall #1
Not detected
Mar 23, 2018
Outfall #1
5.9 mg/L
Feb 17, 2017
Outfall #1
Not detected
Feb 6, 2017
Outfall #1
Not detected
Lead
Not detected1 result
0.262 mg/L
Over in 0 of 3 years tested
All results for lead
A nerve poison for people and wildlife that builds up in sediment.
5 results as a table
Sampled
Drainage area
Result
Feb 19, 2026
Outfall #1
Not detected
Mar 7, 2025
Outfall #1
0.21 mg/L
Feb 13, 2025
Outfall #1
Not detected
Mar 7, 2024
Outfall #1
Not detected
Jan 22, 2024
Outfall #1
0.01 mg/L
Rain and sampling by year
The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.
Day with rain
Day sampled
2025-26
1 of 12 storms sampledTold the state: storms did not produce a discharge
2024-25
2 of 11 storms sampledTold the state it did not sample every required storm
2023-24
2 of 17 storms sampledTold the state it did not sample every required storm
2022-23
0 of 21 storms sampledTold the state it did not sample every required storm
2021-22
0 of 11 storms sampledTold the state it did not sample every required storm
2020-21
0 of 7 storms sampledTold the state it did not sample every required storm
JulAugSepOctNovDecJanFebMarAprMayJun
Rainfall comes from the daily records of NOAA station San Gabriel Canyon Ph (USC00047776), 4.8 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.
Location and details
Where the runoff goes
The facility reports that rain running off it drains to Santa Anita Rio Hondo Wash.
The site sits in a watershed with a state cleanup plan for metals and selenium.
Storm drains carry this runoff to creeks and the ocean without treatment.
The neighborhood
About 1,377 people live in the neighborhood around this site in Baldwin Park. The state scores it above 90% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6037404600. The score covers the whole neighborhood and does not measure this site's own effect.
Same operator
All American Asphalt holds 4 other stormwater permits: