Rain Bird Corporation has held an industrial stormwater permit for the site since December 2014. Its industry is listed as general warehousing and storage. The permit requires samples of its runoff, and the last one it filed is from January 2024. Its runoff drains to San Gabriel River Reach 2 and its tributary/ies, where a state cleanup plan sets stricter limits for lead.

970 W Sierra Madre Blvd, Azusa

Industrial stormwater

This site filed no samples of its runoff in the 2025-2026 reporting year, although rain records show 12 storms of a tenth of an inch or more near it.

The permit requires samples in each half of the year, July to December and January to June. The last sample it filed is from January 2024.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2023-24

The facility sampled 2 of the 17 storms of a tenth of an inch or more near the site in 2023-24.

The permit generally requires samples from four storms a year, with few exceptions.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2023-24

pH

6 to 94 results, 2 drainage areas

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

2023-24 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsLowestHighest
1000 Building267
970 Building279
19 results as a table
SampledDrainage areaResult
Jan 22, 2024970 Building7
Jan 22, 20241000 Building6
Nov 15, 2023970 Building9
Nov 15, 20231000 Building7
Mar 14, 2023970 Building6
Mar 14, 20231000 Building6
Mar 10, 2023970 Building7
Mar 10, 20231000 Building7
Feb 24, 2023970 Building6
Feb 24, 20231000 Building6
Jan 9, 2023970 Building6
Jan 9, 20231000 Building6
Dec 27, 2022970 Building7
Dec 27, 20221000 Building6
Mar 28, 2022970 Building6
Mar 28, 20221000 Building6
Dec 9, 2021970 Building7
Dec 9, 20211000 Building7
Nov 4, 2015970 Building6.7

Suspended solids

16 mg/L3 results, 2 drainage areas

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

2023-24 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
1000 Building216 mg/L18 mg/L
970 Building117 mg/L17 mg/L
18 results as a table
SampledDrainage areaResult
Jan 22, 20241000 Building13 mg/L
Nov 15, 2023970 Building17 mg/L
Nov 15, 20231000 Building18 mg/L
Mar 14, 2023970 Building30 mg/L
Mar 14, 20231000 Building15 mg/L
Mar 10, 2023970 Building42 mg/L
Mar 10, 20231000 Building57 mg/L
Feb 24, 2023970 BuildingNot detected
Feb 24, 20231000 Building9 mg/L
Jan 9, 2023970 Building22 mg/L
Jan 9, 20231000 Building7 mg/L
Dec 27, 2022970 Building19 mg/L
Dec 27, 20221000 Building9 mg/L
Mar 28, 2022970 Building29 mg/L
Mar 28, 20221000 Building17 mg/L
Dec 9, 2021970 Building92 mg/L
Dec 9, 20211000 Building92 mg/L
Nov 4, 2015970 Building14 mg/L

Oil and grease

Not detected4 results, 2 drainage areas

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

2023-24 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
1000 Building20 mg/L0 mg/L
970 Building20 mg/L0 mg/L
18 results as a table
SampledDrainage areaResult
Jan 22, 2024970 BuildingNot detected
Jan 22, 20241000 BuildingNot detected
Nov 15, 2023970 BuildingNot detected
Nov 15, 20231000 BuildingNot detected
Mar 14, 2023970 BuildingNot detected
Mar 14, 20231000 BuildingNot detected
Mar 10, 2023970 BuildingNot detected
Mar 10, 20231000 BuildingNot detected
Feb 24, 2023970 BuildingNot detected
Feb 24, 20231000 BuildingNot detected
Jan 9, 2023970 BuildingNot detected
Jan 9, 20231000 BuildingNot detected
Dec 27, 2022970 BuildingNot detected
Dec 27, 20221000 BuildingNot detected
Mar 28, 2022970 BuildingNot detected
Mar 28, 20221000 BuildingNot detected
Dec 9, 2021970 BuildingNot detected
Dec 9, 20211000 BuildingNot detected

Lead

0.028 mg/L4 results, 2 drainage areas

0.262 mg/L

All results for lead

A nerve poison for people and wildlife that builds up in sediment.

2023-24 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
1000 Building20.02 mg/L0.04 mg/L
970 Building20.035 mg/L0.07 mg/L
18 results as a table
SampledDrainage areaResult
Jan 22, 2024970 Building0.07 mg/L
Jan 22, 20241000 Building0.04 mg/L
Nov 15, 2023970 BuildingNot detected
Nov 15, 20231000 BuildingNot detected
Mar 14, 2023970 BuildingNot detected
Mar 14, 20231000 BuildingNot detected
Mar 10, 2023970 BuildingNot detected
Mar 10, 20231000 BuildingNot detected
Feb 24, 2023970 BuildingNot detected
Feb 24, 20231000 BuildingNot detected
Jan 9, 2023970 BuildingNot detected
Jan 9, 20231000 BuildingNot detected
Dec 27, 2022970 BuildingNot detected
Dec 27, 20221000 BuildingNot detected
Mar 28, 2022970 BuildingNot detected
Mar 28, 20221000 BuildingNot detected
Dec 9, 2021970 BuildingNot detected
Dec 9, 20211000 BuildingNot detected

Stricter limits under the R4 - San Gabriel River Metals and Selenium cleanup plan

This site drains to San Gabriel River Reach 2 and its tributary/ies, which has a cleanup plan. These apply to single results, not yearly averages. Two or more results over in a year count as an exceedance.

PollutantLimitResults over in 2023-24
Lead0.166 mg/L0 of 4Becomes a legal limit on Jul 1, 2020

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

0 of 12 storms sampledTold the state: not enough qualifying storms occurred; storms did not produce a discharge; storms fell outside operating hours

2024-25

0 of 11 storms sampledTold the state it did not sample every required storm

2023-24

2 of 17 storms sampledTold the state it did not sample every required storm

2022-23

5 of 21 storms sampledTold the state it did not sample every required storm

2021-22

2 of 11 storms sampledTold the state it did not sample every required storm

2020-21

0 of 7 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station San Gabriel Canyon Ph (USC00047776), 1.2 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to San Gabriel River.

The site sits in a watershed with a state cleanup plan for metals and selenium.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 4,793 people live in the neighborhood around this site in Azusa. The state scores it above 63% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6037400603. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
General Warehousing and Storage
Operator
Rain Bird Corporation
Covered by
Industrial stormwater permit
Stormwater permit since
December 2014
Site size
406250 square feet
Paved or roofed
99% of the site
State stormwater ID
4 19I025197

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report