El Segundo II LLC South North

301 Vista Del Mar, El Segundo, CA 90245

El Segundo Power II LLC North South has held an industrial stormwater permit for the site since December 2014. Its industry is listed as electric services. The permit requires samples of its runoff, and the last one it filed is from December 2021. The site is in a watershed with a state cleanup plan for dichlorodiphenyltrichloroethane and polychlorinated biphenyls and nearshore debris.

301 Vista Del Mar, El Segundo

Industrial stormwater

This site last filed a sample of its runoff in December 2021.

The permit requires testing. It has filed no results for the last three years, so there is no public record of what its runoff contains.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled none of the 9 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms for another reason.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested once or twice and within the benchmark: pH, suspended solids, oil and grease, zinc, copper, lead, iron, arsenic, cadmium, nickel, mercury, selenium, silver, biochemical oxygen demand.

Also tested, with no state benchmark to compare against: 1 result for acenaphthene, 1 for acenaphthylene, 1 for anthracene, 1 for total recoverable antimony, 1 for Benzo(a)anthracene, 1 for Benzo(a)pyrene, 1 for Benzo(b)fluoranthene, 1 for Benzo(ghi)perylene, 1 for Benzo(k)fluoranthene, 1 for total recoverable chromium, 1 for chrysene, and 1 for Dibenzo(a,h)anthracene.

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

0 of 9 storms sampledTold the state: another reason

2024-25

0 of 6 storms sampledTold the state it did not sample every required storm

2023-24

0 of 15 storms sampledTold the state it did not sample every required storm

2022-23

0 of 18 storms sampledTold the state it did not sample every required storm

2021-22

1 of 6 storms sampledTold the state it did not sample every required storm

2020-21

0 of 7 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station Los Angeles Intl Airport (USW00023174), 3 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Pacific Ocean.

The site sits in a watershed with a state cleanup plan for dichlorodiphenyltrichloroethane and polychlorinated biphenyls and nearshore debris.

Storm drains carry this runoff to creeks and the ocean without treatment.

Permits and IDs

Industry
Electric Services
Operator
El Segundo Power II LLC North South
Covered by
Industrial stormwater permit
Stormwater permit since
December 2014
Site size
11.32 acres
Paved or roofed
6.81% of the site
State stormwater ID
4 19I025190

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.