Southland Polymers Inc

14030 Gannet St, Santa Fe Springs, CA 90670

Southland Polymers Inc has held an industrial stormwater permit for the site since June 2007. Its industry is listed as plastics products. The permit requires samples of its runoff, and the last one it filed is from October 2025. The site is in a watershed with a state cleanup plan for metals and selenium.

14030 Gannet St, Santa Fe Springs

Industrial stormwater

This site filed no samples of its runoff in the 2025-2026 reporting year, although rain records show 8 storms of a tenth of an inch or more near it.

The permit requires samples in each half of the year, July to December and January to June. The last sample it filed is from October 2025.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 1 of the 8 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions. The facility told the state it missed storms because not enough qualifying storms occurred.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2025-26

Oil and grease

Not detected1 result

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

25 results as a table
SampledDrainage areaResult
Oct 14, 2025Parking Lot DrainNot detected
Mar 5, 2025Parking Lot DrainNot detected
Feb 1, 2024Parking Lot DrainNot detected
Jan 22, 2024Parking Lot DrainNot detected
Feb 23, 2023Parking Lot Drain5.9 mg/L
Jan 17, 2022Parking Lot DrainNot detected
Dec 29, 2021Parking Lot Drain2.1 mg/L
Dec 14, 2021Parking Lot DrainNot detected
Mar 15, 2021Parking Lot Drain50 mg/L
Mar 3, 2021Parking Lot DrainNot detected
May 18, 2020Parking Lot DrainNot detected
Mar 12, 2020Parking Lot Drain2.3 mg/L
Dec 6, 2019Parking Lot DrainNot detected
Nov 27, 2019Parking Lot Drain4 mg/L
Jan 31, 2019Parking Lot DrainNot detected
Jan 14, 2019Parking Lot DrainNot detected
Dec 6, 2018Parking Lot Drain2.4 mg/L
Nov 29, 2018Parking Lot DrainNot detected
Feb 27, 2018Parking Lot DrainNot detected
Jan 8, 2018Parking Lot Drain4.5 mg/L
Feb 17, 2017Parking Lot Drain1 mg/L
Feb 6, 2017Parking Lot DrainNot detected
Dec 21, 2016Parking Lot Drain3.1 mg/L
Mar 11, 2016Parking Lot Drain2.3 mg/L
Jan 5, 2016Parking Lot Drain3.9 mg/L

pH

7.07 to 7.071 result

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

25 results as a table
SampledDrainage areaResult
Oct 14, 2025Parking Lot Drain7.1
Mar 5, 2025Parking Lot Drain6.5
Feb 1, 2024Parking Lot Drain6.7
Jan 22, 2024Parking Lot Drain6.6
Feb 23, 2023Parking Lot Drain7.5
Jan 17, 2022Parking Lot Drain7.6
Dec 29, 2021Parking Lot Drain8.8
Dec 14, 2021Parking Lot Drain5.8
Mar 15, 2021Parking Lot Drain6.5
Mar 3, 2021Parking Lot Drain6.3
May 18, 2020Parking Lot Drain7
Mar 12, 2020Parking Lot Drain6.5
Dec 6, 2019Parking Lot Drain6.5
Nov 27, 2019Parking Lot Drain6.6
Jan 31, 2019Parking Lot Drain6
Jan 14, 2019Parking Lot Drain7
Dec 6, 2018Parking Lot Drain6.3
Nov 29, 2018Parking Lot Drain6.8
Feb 27, 2018Parking Lot Drain6.4
Jan 8, 2018Parking Lot Drain7.6
Feb 17, 2017Parking Lot Drain6.7
Feb 6, 2017Parking Lot Drain7.5
Dec 21, 2016Parking Lot Drain6.5
Mar 11, 2016Parking Lot Drain6.6
Jan 5, 2016Parking Lot Drain6.9

Suspended solids

35 mg/L1 result

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

25 results as a table
SampledDrainage areaResult
Oct 14, 2025Parking Lot Drain35 mg/L
Mar 5, 2025Parking Lot Drain59 mg/L
Feb 1, 2024Parking Lot Drain3.1 mg/L
Jan 22, 2024Parking Lot Drain6.2 mg/L
Feb 23, 2023Parking Lot Drain31 mg/L
Jan 17, 2022Parking Lot Drain82 mg/L
Dec 29, 2021Parking Lot Drain28 mg/L
Dec 14, 2021Parking Lot Drain46 mg/L
Mar 15, 2021Parking Lot Drain65 mg/L
Mar 3, 2021Parking Lot Drain84 mg/L
May 18, 2020Parking Lot Drain5.2 mg/L
Mar 12, 2020Parking Lot Drain23 mg/L
Dec 6, 2019Parking Lot Drain52 mg/L
Nov 27, 2019Parking Lot Drain182 mg/L
Jan 31, 2019Parking Lot Drain53 mg/L
Jan 14, 2019Parking Lot Drain8.7 mg/L
Dec 6, 2018Parking Lot Drain2.6 mg/L
Nov 29, 2018Parking Lot Drain6.4 mg/L
Feb 27, 2018Parking Lot Drain78 mg/L
Jan 8, 2018Parking Lot Drain26 mg/L
Feb 17, 2017Parking Lot Drain11 mg/L
Feb 6, 2017Parking Lot Drain3.4 mg/L
Dec 21, 2016Parking Lot Drain4.3 mg/L
Mar 11, 2016Parking Lot Drain23 mg/L
Jan 5, 2016Parking Lot Drain4.4 mg/L

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

1 of 8 storms sampledTold the state: not enough qualifying storms occurred

2024-25

1 of 6 storms sampledTold the state it did not sample every required storm

2023-24

2 of 15 storms sampledTold the state it did not sample every required storm

2022-23

1 of 18 storms sampledTold the state it did not sample every required storm

2021-22

2 of 10 storms sampledTold the state it did not sample every required storm

2020-21

2 of 7 storms sampledTold the state it sampled every required storm

Rainfall comes from the daily records of NOAA station Fullerton Municipal Airport (USW00003166), 3.1 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Los Coyotes Creek.

The site sits in a watershed with a state cleanup plan for metals and selenium.

Storm drains carry this runoff to creeks and the ocean without treatment.

Permits and IDs

Industry
Plastics Products, NEC
Operator
Southland Polymers Inc
Covered by
Industrial stormwater permit
Stormwater permit since
June 2007
Site size
120189 square feet
State stormwater ID
4 19I020924

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.