EarthSpotterEarthSpotter

Prestone Prod Corp

19500 Mariner Ave, Torrance, CA 90503

Prestone Product Corp has held an industrial stormwater permit for the site since September 1994. Its industry is listed as chemicals and chemical preparations. Every pollutant it tested in 2025-26 averaged within the state benchmarks. The site is in a watershed with a state cleanup plan for toxic and metals.

19500 Mariner Ave, Torrance

Industrial stormwater

During the 2025-2026 rainy season, every pollutant this site tested in its runoff averaged within the state's benchmarks.

That is based on 24 lab results from 4 storm days.

Clean WaterIndustrial stormwater

Within the state benchmarks

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2025-26

The facility sampled 3 of the 9 storms of a tenth of an inch or more near the site in 2025-26.

The permit generally requires samples from four storms a year, with few exceptions.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2025-26

pH

6 to 78 results, 2 drainage areas

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsLowestHighest
Outfall 1467
Outfall 2466
48 results as a table
SampledDrainage areaResult
Feb 18, 2026Outfall 26
Feb 18, 2026Outfall 16
Feb 7, 2026Outfall 26
Feb 7, 2026Outfall 17
Nov 21, 2025Outfall 26
Nov 21, 2025Outfall 16
Oct 14, 2025Outfall 26
Oct 14, 2025Outfall 16
Feb 13, 2025Outfall 26
Feb 13, 2025Outfall 16
Feb 7, 2025Outfall 26
Feb 7, 2025Outfall 17
Feb 1, 2024Outfall 36.3
Feb 1, 2024Outfall 26.1
Feb 1, 2024Outfall 16.1
Jan 22, 2024Outfall 36.4
Jan 22, 2024Outfall 26.6
Jan 22, 2024Outfall 16.9
Dec 14, 2021Outfall 37
Dec 14, 2021Outfall 27
Apr 9, 2020Outfall 37
Apr 9, 2020Outfall 27
Apr 9, 2020Outfall 17
Mar 6, 2019Outfall 37.5
Mar 6, 2019Outfall 27.5
Mar 6, 2019Outfall 17.5
Jan 14, 2019Outfall 37.5
Jan 14, 2019Outfall 27.5
Jan 14, 2019Outfall 17.5
Dec 6, 2018Outfall 37.5
Dec 6, 2018Outfall 27.5
Dec 6, 2018Outfall 17.5
Nov 29, 2018Outfall 37.5
Nov 29, 2018Outfall 27.5
Nov 29, 2018Outfall 17.5
Jan 8, 2018Outfall 36.4
Jan 8, 2018Outfall 26.4
Jan 8, 2018Outfall 16.5
Dec 22, 2016Outfall 37.5
Dec 22, 2016Outfall 27.5
Dec 22, 2016Outfall 17.5
Mar 11, 2016Outfall 37.5
Mar 11, 2016Outfall 27.5
Mar 11, 2016Outfall 17.5
Mar 7, 2016Outfall 27
Mar 7, 2016Outfall 17
Dec 13, 2015Outfall 27
Dec 13, 2015Outfall 17

Suspended solids

20 mg/L8 results, 2 drainage areas

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
Outfall 1433 mg/L44 mg/L
Outfall 247.8 mg/L10 mg/L
63 results as a table
SampledDrainage areaResult
Feb 18, 2026Outfall 27 mg/L
Feb 18, 2026Outfall 139 mg/L
Feb 7, 2026Outfall 25 mg/L
Feb 7, 2026Outfall 144 mg/L
Nov 21, 2025Outfall 29 mg/L
Nov 21, 2025Outfall 134 mg/L
Oct 14, 2025Outfall 210 mg/L
Oct 14, 2025Outfall 113 mg/L
Feb 13, 2025Outfall 27 mg/L
Feb 13, 2025Outfall 113 mg/L
Feb 7, 2025Outfall 25 mg/L
Feb 7, 2025Outfall 144 mg/L
Feb 1, 2024Outfall 30.4 mg/L
Feb 1, 2024Outfall 2Not detected
Feb 1, 2024Outfall 12 mg/L
Jan 22, 2024Outfall 314 mg/L
Jan 22, 2024Outfall 25 mg/L
Jan 22, 2024Outfall 13 mg/L
Dec 22, 2023Outfall 30.6 mg/L
Dec 22, 2023Outfall 2Not detected
Dec 22, 2023Outfall 11 mg/L
Aug 20, 2023Outfall 38 mg/L
Aug 20, 2023Outfall 23 mg/L
Aug 20, 2023Outfall 19 mg/L
Jan 10, 2023Outfall 33 mg/L
Jan 10, 2023Outfall 22 mg/L
Jan 10, 2023Outfall 17 mg/L
Jan 5, 2023Outfall 31 mg/L
Jan 5, 2023Outfall 29 mg/L
Jan 5, 2023Outfall 13 mg/L
Dec 14, 2021Outfall 319 mg/L
Dec 14, 2021Outfall 25 mg/L
Apr 9, 2020Outfall 322 mg/L
Apr 9, 2020Outfall 218 mg/L
Apr 9, 2020Outfall 131 mg/L
Mar 6, 2019Outfall 320 mg/L
Mar 6, 2019Outfall 242 mg/L
Mar 6, 2019Outfall 157 mg/L
Jan 14, 2019Outfall 320 mg/L
Jan 14, 2019Outfall 221 mg/L
Jan 14, 2019Outfall 163 mg/L
Dec 6, 2018Outfall 318 mg/L
Dec 6, 2018Outfall 216 mg/L
Dec 6, 2018Outfall 112 mg/L
Nov 29, 2018Outfall 320 mg/L
Nov 29, 2018Outfall 257 mg/L
Nov 29, 2018Outfall 122 mg/L
Mar 22, 2018Outfall 328 mg/L
Mar 22, 2018Outfall 218 mg/L
Mar 22, 2018Outfall 152 mg/L
Jan 8, 2018Outfall 331 mg/L
Jan 8, 2018Outfall 296 mg/L
Jan 8, 2018Outfall 118 mg/L
Dec 22, 2016Outfall 326 mg/L
Dec 22, 2016Outfall 255 mg/L
Dec 22, 2016Outfall 124 mg/L
Mar 11, 2016Outfall 3Not detected
Mar 11, 2016Outfall 2Not detected
Mar 11, 2016Outfall 16 mg/L
Mar 7, 2016Outfall 210 mg/L
Mar 7, 2016Outfall 16 mg/L
Dec 13, 2015Outfall 222 mg/L
Dec 13, 2015Outfall 118 mg/L

Oil and grease

Not detected8 results, 2 drainage areas

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

2025-26 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
Outfall 140 mg/L0 mg/L
Outfall 240 mg/L0 mg/L
63 results as a table
SampledDrainage areaResult
Feb 18, 2026Outfall 2Not detected
Feb 18, 2026Outfall 1Not detected
Feb 7, 2026Outfall 2Not detected
Feb 7, 2026Outfall 1Not detected
Nov 21, 2025Outfall 2Not detected
Nov 21, 2025Outfall 1Not detected
Oct 14, 2025Outfall 2Not detected
Oct 14, 2025Outfall 1Not detected
Feb 13, 2025Outfall 2Not detected
Feb 13, 2025Outfall 1Not detected
Feb 7, 2025Outfall 2Not detected
Feb 7, 2025Outfall 1Not detected
Feb 1, 2024Outfall 3Not detected
Feb 1, 2024Outfall 2Not detected
Feb 1, 2024Outfall 1Not detected
Jan 22, 2024Outfall 3Not detected
Jan 22, 2024Outfall 2Not detected
Jan 22, 2024Outfall 1Not detected
Dec 22, 2023Outfall 3Not detected
Dec 22, 2023Outfall 2Not detected
Dec 22, 2023Outfall 1Not detected
Aug 20, 2023Outfall 310 mg/L
Aug 20, 2023Outfall 25 mg/L
Aug 20, 2023Outfall 1Not detected
Jan 10, 2023Outfall 3Not detected
Jan 10, 2023Outfall 2Not detected
Jan 10, 2023Outfall 1Not detected
Jan 5, 2023Outfall 3Not detected
Jan 5, 2023Outfall 2Not detected
Jan 5, 2023Outfall 1Not detected
Dec 14, 2021Outfall 3Not detected
Dec 14, 2021Outfall 2Not detected
Apr 9, 2020Outfall 3Not detected
Apr 9, 2020Outfall 2Not detected
Apr 9, 2020Outfall 1Not detected
Mar 6, 2019Outfall 3Not detected
Mar 6, 2019Outfall 2Not detected
Mar 6, 2019Outfall 1Not detected
Jan 14, 2019Outfall 3Not detected
Jan 14, 2019Outfall 2Not detected
Jan 14, 2019Outfall 1Not detected
Dec 6, 2018Outfall 3Not detected
Dec 6, 2018Outfall 2Not detected
Dec 6, 2018Outfall 1Not detected
Nov 29, 2018Outfall 3Not detected
Nov 29, 2018Outfall 2Not detected
Nov 29, 2018Outfall 1Not detected
Mar 22, 2018Outfall 3Not detected
Mar 22, 2018Outfall 2Not detected
Mar 22, 2018Outfall 1Not detected
Jan 8, 2018Outfall 311 mg/L
Jan 8, 2018Outfall 27 mg/L
Jan 8, 2018Outfall 17 mg/L
Dec 22, 2016Outfall 3Not detected
Dec 22, 2016Outfall 2Not detected
Dec 22, 2016Outfall 118 mg/L
Mar 11, 2016Outfall 3Not detected
Mar 11, 2016Outfall 2Not detected
Mar 11, 2016Outfall 1Not detected
Mar 7, 2016Outfall 2Not detected
Mar 7, 2016Outfall 1Not detected
Dec 13, 2015Outfall 2Not detected
Dec 13, 2015Outfall 1Not detected

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

3 of 9 storms sampledTold the state it sampled every required storm

2024-25

2 of 6 storms sampledTold the state it did not sample every required storm

2023-24

4 of 14 storms sampledTold the state it sampled every required storm

2022-23

2 of 16 storms sampledTold the state it did not sample every required storm

2021-22

1 of 8 storms sampledTold the state it did not sample every required storm

2020-21

0 of 6 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station Redondo Beach (USC00047326), 2 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to Dominguez Channel.

The site sits in a watershed with a state cleanup plan for toxic and metals.

Storm drains carry this runoff to creeks and the ocean without treatment.

The neighborhood

About 4,360 people live in the neighborhood around this site in Torrance. The state scores it above 53% of California neighborhoods for pollution burden and health vulnerability.

Least burdenedMost burdened

Source: CalEnviroScreen 5.0, census tract 6037650401. The score covers the whole neighborhood and does not measure this site's own effect.

Permits and IDs

Industry
Chemicals and Chemical Preparations, NEC
Operator
Prestone Product Corp
Covered by
Industrial stormwater permit
Stormwater permit since
September 1994
Site size
7.92 acres
Paved or roofed
98% of the site
State stormwater ID
4 19I011153

The state stormwater record

Other sites nearby

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.