EarthSpotterEarthSpotter

Mattel Toys Design Ctr

2031 E Mariposa Ave, El Segundo, CA 90245

Mattel Toys has held an industrial stormwater permit for the site since April 1992. Its industry is listed as dolls and stuffed toys. The permit requires samples of its runoff, and the last one it filed is from March 2025. Its runoff drains to Dominguez Channel Estuary, where a state cleanup plan sets stricter limits for copper, lead, and zinc.

2031 E Mariposa Ave, El Segundo

Industrial stormwater

This site filed no samples of its runoff in the 2025-2026 reporting year, although rain records show 9 storms of a tenth of an inch or more near it.

The permit requires samples in each half of the year, July to December and January to June. The last sample it filed is from March 2025.

Clean WaterIndustrial stormwater

Missing samples

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Rain and sampling in 2024-25

The facility sampled 3 of the 6 storms of a tenth of an inch or more near the site in 2024-25.

The permit generally requires samples from four storms a year, with few exceptions.

What the samples show

The state compares each year's average with its benchmark. A site with more than one drainage area samples each one separately, so it can file more than four results for a pollutant in a year. Open a pollutant to see every lab result behind the averages.

  • Yearly average, over
  • Yearly average, within
  • Single lab result
  • State benchmark

Tested in 2024-25

Nitrate and nitrite

0.64 mg/L6 results, 2 drainage areas

0.68 mg/L

All results for nitrate and nitrite

Feeds algae blooms that strip oxygen from creeks and lagoons.

2024-25 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
S-1 DC Sample Point30.42 mg/L0.53 mg/L
S-2 Warehouse Sample Pt30.85 mg/L1.7 mg/L
34 results as a table
SampledDrainage areaResult
Mar 12, 2025S-2 Warehouse Sample Pt1.7 mg/L
Mar 12, 2025S-1 DC Sample Point0.53 mg/L
Mar 5, 2025S-2 Warehouse Sample Pt0.54 mg/L
Mar 5, 2025S-1 DC Sample Point0.43 mg/L
Feb 13, 2025S-2 Warehouse Sample Pt0.29 mg/L
Feb 13, 2025S-1 DC Sample Point0.31 mg/L
Mar 6, 2024S-2 Warehouse Sample Pt0.054 mg/L
Mar 6, 2024S-1 DC Sample Point0.088 mg/L
Feb 1, 2024S-2 Warehouse Sample Pt0.56 mg/L
Feb 1, 2024S-1 DC Sample Point0.1 mg/L
Mar 29, 2023S-3 North East Swall0.13 mg/L
Mar 29, 2023S-2 Warehouse Sample Pt0.11 mg/L
Mar 29, 2023S-1 DC Sample Point0.17 mg/L
Mar 14, 2023S-3 North East Swall0.25 mg/L
Mar 14, 2023S-2 Warehouse Sample Pt0.35 mg/L
Mar 14, 2023S-1 DC Sample Point0.42 mg/L
Feb 23, 2023S-3 North East Swall0.2 mg/L
Feb 23, 2023S-2 Warehouse Sample Pt0.19 mg/L
Feb 23, 2023S-1 DC Sample Point0.16 mg/L
Mar 28, 2022S-3 North East Swall0.14 mg/L
Mar 28, 2022S-2 Warehouse Sample Pt0.071 mg/L
Mar 28, 2022S-1 DC Sample Point0.38 mg/L
Dec 14, 2021S-3 North East Swall0.37 mg/L
Dec 14, 2021S-2 Warehouse Sample Pt0.34 mg/L
Dec 14, 2021S-1 DC Sample Point0.39 mg/L
Oct 25, 2021S-2 Warehouse Sample Pt0.14 mg/L
Oct 25, 2021S-1 DC Sample Point0.14 mg/L
Mar 3, 2021S-2 Warehouse Sample Pt0.63 mg/L
Mar 3, 2021S-1 DC Sample Point1.2 mg/L
Dec 4, 2019S-2 Warehouse Sample Pt0.049 mg/L
Dec 4, 2019S-1 DC Sample Point0.093 mg/L
Nov 20, 2019S-3 North East Swall0.28 mg/L
Nov 20, 2019S-2 Warehouse Sample Pt0.2 mg/L
Nov 20, 2019S-1 DC Sample Point0.32 mg/L

pH

6 to 7.046 results, 2 drainage areas

6 to 9

All results for pH

Water that is too acidic or too alkaline harms aquatic life and makes metals more toxic.

2024-25 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsLowestHighest
S-1 DC Sample Point367
S-2 Warehouse Sample Pt367
46 results as a table
SampledDrainage areaResult
Mar 12, 2025S-2 Warehouse Sample Pt6.5
Mar 12, 2025S-1 DC Sample Point6.7
Mar 5, 2025S-2 Warehouse Sample Pt7
Mar 5, 2025S-1 DC Sample Point7
Feb 13, 2025S-2 Warehouse Sample Pt6
Feb 13, 2025S-1 DC Sample Point6
Mar 6, 2024S-2 Warehouse Sample Pt6.7
Mar 6, 2024S-1 DC Sample Point6.7
Feb 1, 2024S-2 Warehouse Sample Pt7.3
Feb 1, 2024S-1 DC Sample Point6.9
Mar 29, 2023S-3 North East Swall6
Mar 29, 2023S-2 Warehouse Sample Pt6
Mar 29, 2023S-1 DC Sample Point6
Mar 14, 2023S-3 North East Swall6
Mar 14, 2023S-2 Warehouse Sample Pt6
Mar 14, 2023S-1 DC Sample Point6
Feb 23, 2023S-3 North East Swall6
Feb 23, 2023S-2 Warehouse Sample Pt6
Feb 23, 2023S-1 DC Sample Point6
Mar 28, 2022S-3 North East Swall6
Mar 28, 2022S-2 Warehouse Sample Pt6
Mar 28, 2022S-1 DC Sample Point6
Dec 14, 2021S-3 North East Swall6
Dec 14, 2021S-2 Warehouse Sample Pt6
Dec 14, 2021S-1 DC Sample Point6
Oct 25, 2021S-2 Warehouse Sample Pt7.7
Oct 25, 2021S-1 DC Sample Point7.2
Mar 3, 2021S-2 Warehouse Sample Pt6
Mar 3, 2021S-1 DC Sample Point6
Dec 4, 2019S-2 Warehouse Sample Pt6
Dec 4, 2019S-1 DC Sample Point6
Nov 20, 2019S-3 North East Swall6
Nov 20, 2019S-2 Warehouse Sample Pt6
Nov 20, 2019S-1 DC Sample Point6
Feb 13, 2019S-3 North East Swall6
Feb 13, 2019S-2 Warehouse Sample Pt6
Feb 13, 2019S-1 DC Sample Point6
Jan 14, 2019S-3 North East Swall7
Jan 14, 2019S-2 Warehouse Sample Pt7
Jan 14, 2019S-1 DC Sample Point7
Nov 29, 2018S-2 Warehouse Sample Pt7
Nov 29, 2018S-1 DC Sample Point6
Jan 8, 2018S-2 Warehouse Sample Pt6.7
Jan 8, 2018S-1 DC Sample Point6.6
Jan 5, 2016S-2 Warehouse Sample Pt6.9
Jan 5, 2016S-1 DC Sample Point6.5

Suspended solids

31 mg/L6 results, 2 drainage areas

100 mg/L

All results for suspended solids

Mud and fine particles that cloud water, bury habitat, and carry other pollutants.

2024-25 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
S-1 DC Sample Point340 mg/L72 mg/L
S-2 Warehouse Sample Pt323 mg/L36 mg/L
47 results as a table
SampledDrainage areaResult
Mar 12, 2025S-2 Warehouse Sample Pt36 mg/L
Mar 12, 2025S-1 DC Sample Point72 mg/L
Mar 5, 2025S-2 Warehouse Sample Pt8 mg/L
Mar 5, 2025S-1 DC Sample Point22 mg/L
Feb 13, 2025S-2 Warehouse Sample Pt24 mg/L
Feb 13, 2025S-1 DC Sample Point25 mg/L
Mar 6, 2024S-2 Warehouse Sample Pt13 mg/L
Mar 6, 2024S-1 DC Sample Point5 mg/L
Feb 1, 2024S-2 Warehouse Sample Pt16 mg/L
Feb 1, 2024S-1 DC Sample Point10 mg/L
Mar 29, 2023S-3 North East Swall1 mg/L
Mar 29, 2023S-2 Warehouse Sample Pt7 mg/L
Mar 29, 2023S-1 DC Sample Point15 mg/L
Mar 14, 2023S-3 North East Swall5 mg/L
Mar 14, 2023S-2 Warehouse Sample Pt35 mg/L
Mar 14, 2023S-1 DC Sample Point42 mg/L
Feb 23, 2023S-3 North East Swall4 mg/L
Feb 23, 2023S-2 Warehouse Sample Pt11 mg/L
Feb 23, 2023S-1 DC Sample Point13 mg/L
Mar 28, 2022S-3 North East Swall45 mg/L
Mar 28, 2022S-2 Warehouse Sample Pt7 mg/L
Mar 28, 2022S-1 DC Sample Point15 mg/L
Dec 14, 2021S-3 North East Swall7 mg/L
Dec 14, 2021S-2 Warehouse Sample Pt12 mg/L
Dec 14, 2021S-1 DC Sample Point18 mg/L
Oct 25, 2021S-2 Warehouse Sample Pt16 mg/L
Oct 25, 2021S-1 DC Sample Point42 mg/L
Mar 3, 2021S-2 Warehouse Sample Pt34 mg/L
Mar 3, 2021S-1 DC Sample Point57 mg/L
Dec 4, 2019S-2 Warehouse Sample Pt9 mg/L
Dec 4, 2019S-1 DC Sample Point23 mg/L
Nov 20, 2019S-3 North East Swall20 mg/L
Nov 20, 2019S-2 Warehouse Sample Pt21 mg/L
Nov 20, 2019S-1 DC Sample Point18 mg/L
Feb 13, 2019S-3 North East Swall326 mg/L
Feb 13, 2019S-2 Warehouse Sample Pt9 mg/L
Feb 13, 2019S-1 DC Sample Point15 mg/L
Jan 14, 2019S-3 North East Swall184 mg/L
Jan 14, 2019S-2 Warehouse Sample Pt44 mg/L
Jan 14, 2019S-1 DC Sample Point36 mg/L
Nov 29, 2018S-2 Warehouse Sample Pt33 mg/L
Nov 29, 2018S-1 DC Sample Point40 mg/L
Jan 8, 2018S-2 Warehouse Sample Pt28 mg/L
Jan 8, 2018S-1 DC Sample Point9 mg/L
Feb 7, 2017S-3 North East SwallNot detected
Jan 5, 2016S-2 Warehouse Sample Pt25 mg/L
Jan 5, 2016S-1 DC Sample Point54 mg/L

Oil and grease

Not detected6 results, 2 drainage areas

15 mg/L

All results for oil and grease

Coats plants and animals and blocks oxygen from entering the water.

2024-25 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
S-1 DC Sample Point30 mg/L0 mg/L
S-2 Warehouse Sample Pt30 mg/L0 mg/L
45 results as a table
SampledDrainage areaResult
Mar 12, 2025S-2 Warehouse Sample PtNot detected
Mar 12, 2025S-1 DC Sample PointNot detected
Mar 5, 2025S-2 Warehouse Sample PtNot detected
Mar 5, 2025S-1 DC Sample PointNot detected
Feb 13, 2025S-2 Warehouse Sample PtNot detected
Feb 13, 2025S-1 DC Sample PointNot detected
Mar 6, 2024S-2 Warehouse Sample PtNot detected
Mar 6, 2024S-1 DC Sample PointNot detected
Feb 1, 2024S-2 Warehouse Sample PtNot detected
Feb 1, 2024S-1 DC Sample PointNot detected
Mar 29, 2023S-3 North East SwallNot detected
Mar 29, 2023S-2 Warehouse Sample PtNot detected
Mar 29, 2023S-1 DC Sample PointNot detected
Mar 14, 2023S-3 North East SwallNot detected
Mar 14, 2023S-2 Warehouse Sample PtNot detected
Mar 14, 2023S-1 DC Sample PointNot detected
Feb 23, 2023S-3 North East SwallNot detected
Feb 23, 2023S-2 Warehouse Sample PtNot detected
Feb 23, 2023S-1 DC Sample PointNot detected
Mar 28, 2022S-3 North East SwallNot detected
Mar 28, 2022S-2 Warehouse Sample PtNot detected
Mar 28, 2022S-1 DC Sample PointNot detected
Dec 14, 2021S-3 North East SwallNot detected
Dec 14, 2021S-2 Warehouse Sample PtNot detected
Dec 14, 2021S-1 DC Sample PointNot detected
Oct 25, 2021S-2 Warehouse Sample PtNot detected
Oct 25, 2021S-1 DC Sample PointNot detected
Mar 3, 2021S-2 Warehouse Sample PtNot detected
Mar 3, 2021S-1 DC Sample PointNot detected
Dec 4, 2019S-2 Warehouse Sample PtNot detected
Dec 4, 2019S-1 DC Sample PointNot detected
Nov 20, 2019S-3 North East SwallNot detected
Nov 20, 2019S-2 Warehouse Sample PtNot detected
Nov 20, 2019S-1 DC Sample PointNot detected
Feb 13, 2019S-3 North East SwallNot detected
Feb 13, 2019S-2 Warehouse Sample PtNot detected
Feb 13, 2019S-1 DC Sample PointNot detected
Jan 14, 2019S-3 North East SwallNot detected
Jan 14, 2019S-2 Warehouse Sample PtNot detected
Jan 14, 2019S-1 DC Sample PointNot detected
Nov 29, 2018S-2 Warehouse Sample PtNot detected
Nov 29, 2018S-1 DC Sample PointNot detected
Jan 8, 2018S-2 Warehouse Sample PtNot detected
Jan 8, 2018S-1 DC Sample PointNot detected
Feb 7, 2017S-3 North East SwallNot detected

Zinc

0.12 mg/L6 results, 2 drainage areas

0.26 mg/L

All results for zinc

Toxic to fish and the small animals they eat, even at low concentrations.

2024-25 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
S-1 DC Sample Point30.15 mg/L0.17 mg/L
S-2 Warehouse Sample Pt30.095 mg/L0.13 mg/L
15 results as a table
SampledDrainage areaResult
Mar 12, 2025S-2 Warehouse Sample Pt0.11 mg/L
Mar 12, 2025S-1 DC Sample Point0.17 mg/L
Mar 5, 2025S-2 Warehouse Sample Pt0.13 mg/L
Mar 5, 2025S-1 DC Sample Point0.15 mg/L
Feb 13, 2025S-2 Warehouse Sample Pt0.051 mg/L
Feb 13, 2025S-1 DC Sample Point0.12 mg/L
Mar 6, 2024S-2 Warehouse Sample Pt0.19 mg/L
Mar 6, 2024S-1 DC Sample Point0.13 mg/L
Feb 1, 2024S-2 Warehouse Sample Pt0.13 mg/L
Feb 1, 2024S-1 DC Sample Point0.083 mg/L
Mar 28, 2022S-3 North East Swall0.11 mg/L
Mar 28, 2022S-2 Warehouse Sample Pt0.21 mg/L
Mar 28, 2022S-1 DC Sample Point0.11 mg/L
Mar 3, 2021S-2 Warehouse Sample Pt0.12 mg/L
Mar 3, 2021S-1 DC Sample Point0.36 mg/L

Copper

0.022 mg/L6 results, 2 drainage areas

0.0332 mg/L

All results for copper

Toxic to fish at very low concentrations and damages their sense of smell.

2024-25 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
S-1 DC Sample Point30.033 mg/L0.067 mg/L
S-2 Warehouse Sample Pt30.012 mg/L0.019 mg/L
15 results as a table
SampledDrainage areaResult
Mar 12, 2025S-2 Warehouse Sample Pt0.019 mg/L
Mar 12, 2025S-1 DC Sample Point0.021 mg/L
Mar 5, 2025S-2 Warehouse Sample Pt0.013 mg/L
Mar 5, 2025S-1 DC Sample Point0.067 mg/L
Feb 13, 2025S-2 Warehouse Sample Pt0.0049 mg/L
Feb 13, 2025S-1 DC Sample Point0.01 mg/L
Mar 6, 2024S-2 Warehouse Sample Pt0.0021 mg/L
Mar 6, 2024S-1 DC Sample Point0.013 mg/L
Feb 1, 2024S-2 Warehouse Sample Pt0.01 mg/L
Feb 1, 2024S-1 DC Sample Point0.0058 mg/L
Mar 28, 2022S-3 North East Swall0.0054 mg/L
Mar 28, 2022S-2 Warehouse Sample Pt0.0055 mg/L
Mar 28, 2022S-1 DC Sample Point0.013 mg/L
Mar 3, 2021S-2 Warehouse Sample Pt0.013 mg/L
Mar 3, 2021S-1 DC Sample Point0.044 mg/L

Lead

0.00052 mg/L6 results, 2 drainage areas

0.262 mg/L

All results for lead

A nerve poison for people and wildlife that builds up in sediment.

2024-25 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
S-1 DC Sample Point30.0006 mg/L0.0018 mg/L
S-2 Warehouse Sample Pt30.00043 mg/L0.0013 mg/L
15 results as a table
SampledDrainage areaResult
Mar 12, 2025S-2 Warehouse Sample PtNot detected
Mar 12, 2025S-1 DC Sample PointNot detected
Mar 5, 2025S-2 Warehouse Sample PtNot detected
Mar 5, 2025S-1 DC Sample PointNot detected
Feb 13, 2025S-2 Warehouse Sample Pt0.0013 mg/L
Feb 13, 2025S-1 DC Sample Point0.0018 mg/L
Mar 6, 2024S-2 Warehouse Sample Pt0.00033 mg/L
Mar 6, 2024S-1 DC Sample Point0.0011 mg/L
Feb 1, 2024S-2 Warehouse Sample Pt0.0024 mg/L
Feb 1, 2024S-1 DC Sample Point0.00064 mg/L
Mar 28, 2022S-3 North East Swall0.0017 mg/L
Mar 28, 2022S-2 Warehouse Sample Pt0.0024 mg/L
Mar 28, 2022S-1 DC Sample Point0.00095 mg/L
Mar 3, 2021S-2 Warehouse Sample Pt0.001 mg/L
Mar 3, 2021S-1 DC Sample Point0.0019 mg/L

Cadmium

Not detected6 results, 2 drainage areas

0.0053 mg/L

All results for cadmium

2024-25 results by drainage area

The site samples each drainage area separately, so one storm can produce several results. The state compares the average of all of them with the benchmark.

Drainage areaResultsAverageHighest
S-1 DC Sample Point30 mg/L0 mg/L
S-2 Warehouse Sample Pt30 mg/L0 mg/L
29 results as a table
SampledDrainage areaResult
Mar 12, 2025S-2 Warehouse Sample PtNot detected
Mar 12, 2025S-1 DC Sample PointNot detected
Mar 5, 2025S-2 Warehouse Sample PtNot detected
Mar 5, 2025S-1 DC Sample PointNot detected
Feb 13, 2025S-2 Warehouse Sample PtNot detected
Feb 13, 2025S-1 DC Sample PointNot detected
Mar 6, 2024S-2 Warehouse Sample Pt0.00026 mg/L
Mar 6, 2024S-1 DC Sample PointNot detected
Feb 1, 2024S-2 Warehouse Sample PtNot detected
Feb 1, 2024S-1 DC Sample PointNot detected
Mar 29, 2023S-3 North East Swall0.000072 mg/L
Mar 29, 2023S-2 Warehouse Sample PtNot detected
Mar 29, 2023S-1 DC Sample Point0.00012 mg/L
Mar 14, 2023S-3 North East Swall0.00021 mg/L
Mar 14, 2023S-2 Warehouse Sample PtNot detected
Mar 14, 2023S-1 DC Sample Point0.00011 mg/L
Feb 23, 2023S-3 North East SwallNot detected
Feb 23, 2023S-2 Warehouse Sample PtNot detected
Feb 23, 2023S-1 DC Sample PointNot detected
Mar 28, 2022S-3 North East SwallNot detected
Mar 28, 2022S-2 Warehouse Sample PtNot detected
Mar 28, 2022S-1 DC Sample PointNot detected
Dec 14, 2021S-3 North East Swall0.00012 mg/L
Dec 14, 2021S-2 Warehouse Sample PtNot detected
Dec 14, 2021S-1 DC Sample PointNot detected
Oct 25, 2021S-2 Warehouse Sample PtNot detected
Oct 25, 2021S-1 DC Sample PointNot detected
Mar 3, 2021S-2 Warehouse Sample Pt0.00005 mg/L
Mar 3, 2021S-1 DC Sample Point0.00016 mg/L

Stricter limits under the R4 - Los Angeles and Long Beach Harbor Waters cleanup plan

This site drains to Dominguez Channel Estuary, which has a cleanup plan. These apply to single results, not yearly averages. Two or more results over in a year count as an exceedance.

PollutantLimitResults over in 2024-25
Copper0.0058 mg/L5 of 6
Lead0.221 mg/L0 of 6
Zinc0.095 mg/L5 of 6

Rain and sampling by year

The permit asks each site to sample two storms between July and December and two between January and June. When a site samples fewer, its results may not represent its true runoff.

  • Day with rain
  • Day sampled
2025-26

0 of 9 storms sampledTold the state: not enough qualifying storms occurred; storms did not produce a discharge; storms fell outside operating hours

2024-25

3 of 6 storms sampledTold the state it did not sample every required storm

2023-24

2 of 15 storms sampledTold the state it did not sample every required storm

2022-23

3 of 18 storms sampledTold the state it did not sample every required storm

2021-22

3 of 6 storms sampledTold the state it did not sample every required storm

2020-21

1 of 7 storms sampledTold the state it did not sample every required storm

Rainfall comes from the daily records of NOAA station Los Angeles Intl Airport (USW00023174), 1 miles from the site. It is the nearest station with a full record since 2015. A storm here means a tenth of an inch or more of rain after two dry days.

Location and details

Where the runoff goes

The facility reports that rain running off it drains to San Pedro Bay.

The site sits in a watershed with a state cleanup plan for toxic and metals.

Storm drains carry this runoff to creeks and the ocean without treatment.

Permits and IDs

Industry
Dolls and Stuffed Toys
Operator
Mattel Toys
Covered by
Industrial stormwater permit
Stormwater permit since
April 1992
Site size
9 acres
State stormwater ID
4 19I002527

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report