San Gabriel Valley Council of Government operates the site. Its recent discharge results were within the permit's action levels.
1210 Fullerton Road, City Of Industry
Construction stormwater
This construction site's discharge results in the last 12 months were within the permit's action levels.
It filed 66 field readings for pH and turbidity in that time. The Water Board has recorded no violations and taken no enforcement actions here.
Clean WaterConstruction stormwater
Within the permit's action levels
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Construction stormwater permit
Risk level
Risk level 2The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
September 2025
Disturbed area
13.86 acres
Project
Transportation
Drains to
San Jose Creek, San Gabriel River Reach 3
State permit ID
4 19C408965
Days above the permit's action level
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.
Date
Discharge point
Measure
Day's value
Level
Oct 14, 2025
Storm Drain Inlet on North Railroad St to the West of Fullerton Rd
pH
9.8
above 8.5
Oct 14, 2025
Storm Drain Inlet on North Railroad St to the West of Fullerton Rd
Turbidity
414 NTU
above 250 NTU
Oct 14, 2025
Storm Drain Inlet on Railroad St to the West of Fullerton Rd 2
pH
9.2
above 8.5
Oct 14, 2025
Storm Drain Inlet on Railroad St to the West of Fullerton Rd 2
Turbidity
611 NTU
above 250 NTU
All field readings (41)
Date
Discharge point
pH
Turbidity
Feb 19, 2026
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.3
81 NTU
Feb 19, 2026
SD Clean-out to NE of Fullerton Rd.
8.4
88 NTU
Feb 17, 2026
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.3
142 NTU
Feb 17, 2026
SD Clean-out to NE of Fullerton Rd.
8.4
138 NTU
Feb 16, 2026
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.4, 8.4
155 NTU, 197 NTU
Feb 16, 2026
SD Clean-out to NE of Fullerton Rd.
8.4, 8.3
173 NTU, 178 NTU
Feb 11, 2026
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.4
213 NTU
Feb 11, 2026
SD Clean-out to NE of Fullerton Rd.
8.3
215 NTU
Jan 4, 2026
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.3
84 NTU
Jan 4, 2026
SD Clean-out to NE of Fullerton Rd.
8.3
75 NTU
Jan 3, 2026
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.3, 8.2
79 NTU, 75 NTU
Jan 3, 2026
SD Clean-out to NE of Fullerton Rd.
8.2, 8.4
99 NTU, 82 NTU
Jan 1, 2026
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.3, 8.4
79 NTU, 97 NTU
Jan 1, 2026
SD Clean-out to NE of Fullerton Rd.
8.3, 8.3
99 NTU, 84 NTU
Dec 31, 2025
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.3
126 NTU
Dec 31, 2025
SD Clean-out to NE of Fullerton Rd.
8.4
112 NTU
Dec 26, 2025
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.1, 8.1
62 NTU, 65 NTU
Dec 26, 2025
SD Clean-out to NE of Fullerton Rd.
8.4
56 NTU
Dec 25, 2025
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.1
48 NTU
Dec 25, 2025
SD Clean-out to NE of Fullerton Rd.
8.2, 8.3
55 NTU, 59 NTU
Dec 24, 2025
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.2, 8.4
42 NTU, 74 NTU
Dec 24, 2025
SD Clean-out to NE of Fullerton Rd.
8.3, 8.4
55 NTU, 63 NTU
Dec 24, 2025
Storm Drain Inlet on Railroad St to the West of Fullerton Rd
8.4
168 NTU
Nov 21, 2025
Grate Inlet in parking lot area to NE of 1210 Fullerton Rd Building
8.4
51 NTU
Nov 21, 2025
Inlet in V-ditch at 1210 Fullerton Rd to NE of Building
8.4
24 NTU
Nov 21, 2025
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.4
15 NTU
Nov 21, 2025
SD Clean-out to NE of Fullerton Rd.
8.4
77 NTU
Nov 21, 2025
Storm Drain Inlet on North Railroad St to the West of Fullerton Rd
8.3
51 NTU
Nov 21, 2025
Storm Drain Inlet on Railroad St to the East of Fullerton Rd
8.2
55 NTU
Nov 21, 2025
Storm Drain Inlet on Railroad St to the West of Fullerton Rd
8.4
83 NTU
Nov 21, 2025
Storm Drain Inlet on Railroad St to the West of Fullerton Rd 2
8.4
33 NTU
Nov 14, 2025
Inlet in V-ditch at 1210 Fullerton Rd to NE of Building
8.4
84 NTU
Nov 14, 2025
Storm Drain Inlet on Railroad St to the West of Fullerton Rd
8.4
219 NTU
Oct 14, 2025
Grate Inlet in parking lot area to NE of 1210 Fullerton Rd Building
8.4
167 NTU
Oct 14, 2025
Inlet in V-ditch at 1210 Fullerton Rd to NE of Building
8.5
11 NTU
Oct 14, 2025
Inlet in V-ditch at 1210 Fullerton Rd to NW of Building
8.4
105 NTU
Oct 14, 2025
SD Clean-out on Railroad St, West of Fullerton Rd
11
560 NTU
Oct 14, 2025
Storm Drain Inlet on North Railroad St to the West of Fullerton Rd
9.8
414 NTU
Oct 14, 2025
Storm Drain Inlet on Railroad St to the East of Fullerton Rd
8.1
129 NTU
Oct 14, 2025
Storm Drain Inlet on Railroad St to the West of Fullerton Rd
8.2
190 NTU
Oct 14, 2025
Storm Drain Inlet on Railroad St to the West of Fullerton Rd 2
9.2
611 NTU
Violations the Water Board recorded
None
Enforcement actions
None
Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.
Location and details
The neighborhood
About 758 people live in the neighborhood around this site in Rowland Heights. The state scores it above 94% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6037980035. The score covers the whole neighborhood and does not measure this site's own effect.