City of Los Angeles Public Works Bureau of Engineering, a city agency, operates the site. At its risk level, the permit does not require discharge samples.
12621 Rye Street, Studio City
Construction stormwater
This construction site is at risk level 1, so it does not have to sample its discharges.
There are no results to compare with the permit's action levels. The Water Board has recorded no violations and taken no enforcement actions here.
Clean WaterConstruction stormwater
No discharge results
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Construction stormwater permit
Risk level
Risk level 1The permit does not require samples of discharges at this level.
Status in the state system
Active
Covered since
September 2024
Disturbed area
2.94 acres
Project
New Gymnasium
Drains to
Tujunga Wash to the Los Angeles River
State permit ID
4 19C404925
Days above the permit's action level
The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.
None
All field readings (1)
Date
Discharge point
pH
Turbidity
Nov 21, 2025
East Entrance at Beeman Ave
9.2
337 NTU
Violations the Water Board recorded
None
Enforcement actions
None
Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.
Location and details
The neighborhood
About 5,216 people live in the neighborhood around this site in Studio City. The state scores it above 31% of California neighborhoods for pollution burden and health vulnerability.
Least burdenedMost burdened
Source: CalEnviroScreen 5.0, census tract 6037143401. The score covers the whole neighborhood and does not measure this site's own effect.
Permits and IDs
Operator
City of Los Angeles Public Works Bureau of Engineering