Burbank Glendale Pasadena Airport Authority, a special district, operates the site. Its discharge was above the permit's action level on 4 days in the last 12 months.

2627 North Hollywood Way, Burbank

Construction stormwater

On 4 days in the last 12 months, a discharge from this construction site was above the permit's action level for pH and turbidity.

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge. The permit does not count a day above an action level as a violation. The Water Board has recorded no violations and taken no enforcement actions here.

Clean WaterConstruction stormwater

Above the permit's action level

Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.

Permit
Construction stormwater permit
Risk level
Risk level 2The permit requires samples of discharges at this level.
Status in the state system
Active
Covered since
December 2023
Disturbed area
63.8 acres
Project
Transportation
Drains to
Burbank Channel, Los Angeles river
State permit ID
4 19C402722

Days above the permit's action level

The permit's action levels are a pH between 6.5 and 8.5 and turbidity of 250 NTU, checked at each discharge point for each day of discharge.

DateDischarge pointMeasureDay's valueLevel
Feb 19, 2026AOA - NorthTurbidity1,100 NTUabove 250 NTU
Feb 16, 2026AOA - NorthTurbidity1,100 NTUabove 250 NTU
Dec 26, 2025AOA - NorthTurbidity536 NTUabove 250 NTU
Dec 26, 2025AOA - SouthTurbidity396 NTUabove 250 NTU
Dec 24, 2025AOA - NorthpH9.2above 8.5
Dec 24, 2025AOA - NorthTurbidity664 NTUabove 250 NTU
Nov 21, 2025AOA - NorthpH8.9above 8.5
Nov 21, 2025AOA - NorthTurbidity1,100 NTUabove 250 NTU
Nov 14, 2025AOA - NorthTurbidity583 NTUabove 250 NTU
Nov 14, 2025AOA - SouthTurbidity751 NTUabove 250 NTU
Oct 14, 2025AOA - SouthpH9.9above 8.5
Oct 14, 2025AOA - SouthTurbidity344 NTUabove 250 NTU
All field readings (13)
DateDischarge pointpHTurbidity
Feb 19, 2026AOA - North7.21,100 NTU
Feb 16, 2026AOA - North7.51,100 NTU
Dec 26, 2025AOA - North7536 NTU
Dec 26, 2025AOA - South7.1396 NTU
Dec 24, 2025AOA - North9.2664 NTU
Nov 21, 2025AOA - North8.91,100 NTU
Nov 21, 2025AOA - South844 NTU
Nov 15, 2025AOA - North7.197 NTU
Nov 15, 2025AOA - South7.298 NTU
Nov 14, 2025AOA - North7.4583 NTU
Nov 14, 2025AOA - South7.3751 NTU
Oct 14, 2025AOA - North8.4176 NTU
Oct 14, 2025AOA - South9.9344 NTU

Violations the Water Board recorded

None

Enforcement actions

None

Source: the State Water Board's stormwater system (SMARTS). Sites report pH and turbidity readings taken in the field when a storm makes them discharge.

Location and details

Permits and IDs

Operator
Burbank Glendale Pasadena Airport Authority
Covered by
Construction stormwater permit

The state stormwater record

Report pollution at this site

Send photos or video of what you have seen, such as smoke, runoff, or uncovered materials. We review every report.

Send a report