City of Scotts Valley, a city agency, holds this storm drain permit.
Municipal storm drains
This Phase II municipal storm drain permit has been in place since September 2013.
It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 8 violations and took 3 enforcement actions.
Clean WaterMunicipal storm drains
Results only in annual reports
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Phase II municipal storm drain permit
Permit order
2013-0001-DWQ
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
September 2013
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
3 44M2000192
Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.
Violations the Water Board recorded
Listed as the Water Board recorded them.
Date
Type
What the Water Board recorded
May 24, 2023
MS4 Order ConditionClass S
Violation of General Permit section E.12.k for failure to comply with PCRs section E.3 - Structural Stormwater Control Measure (SCM) Operations and Maintenance (O&M) Database requiring the City to develop a database with information regarding each structural SCM installed per the PCRs
May 24, 2023
MS4 Order ConditionClass B
Violation of General Permit section E.11.c.(ii)(b) for failure to provide documentation of the procedures the City uses for conducting the facility comprehensive assessment
May 24, 2023
MS4 Order ConditionClass B
Violation of General Permit section E.11.b for failure to provide a map identifying where the inventoried permittee-owned and operated facilities are located
May 24, 2023
MS4 Order ConditionClass B
General Permit section E.11.a for failure to develop and maintain an inventory of permittee-owned and operated facilities that are a threat to water quality
May 24, 2023
MS4 Order ConditionClass B
Violation of General Permit section E.12.k for failure to comply with PCRs section B.1.c requiring the City to apply the post-construction requirements to public projects
Jul 5, 2019
Deficient BMP ImplementationClass 2
Jul 5, 2019
Deficient BMP ImplementationClass 2
Jun 12, 2015
Deficient BMP ImplementationClass 4
Lack of mechanism for scheduling and tracking implementation of storm sewer system. Lack of mechanism for tracking long-term operation and maintenance of Storm Water Control Measures. See Attachments for NOV dated October 23, 2015.
Enforcement actions
Notices, orders, and penalties the Water Board issued.
Date
Action
Details
Penalty
Sep 1, 2023
Notice of violation
Issued NOV to correct 5 violationsStatus: Historical
Jul 5, 2019
Notice of violation
NOV & 13383 Order for failure to, 1) develop an enforceable construction site storm water runoff control ordinance, 2) maintain a construction site inventory, and 3) effectively implement an inspection program including enforcement as necessary.Status: Active
Oct 23, 2015
Notice of violation
NOV & 13267 Order for BMP-implementation violations detected during inspection on 6/12/15.Status: Historical
Source: the State Water Board's stormwater system (SMARTS).