City of Gilroy, a city agency, holds this storm drain permit.
Municipal storm drains
This Phase II municipal storm drain permit has been in place since July 2013.
It covers the storm drains that carry runoff from streets to creeks and the ocean. The Water Board recorded 8 violations and took 4 enforcement actions.
Clean WaterMunicipal storm drains
Results only in annual reports
Clean Water Act. Source: California State Water Resources Control Board, data as of November 23, 2026.
Permit
Phase II municipal storm drain permit
Permit order
2013-0001-DWQ
Permit holder
City/Town Agency
Status in the state system
Active
Covered since
July 2013
Area covered
The city's areaA storm drain permit covers an area, so this page has no single map location.
State permit ID
3 43M2000077
Under these permits, the city or agency must keep improving its program to reduce pollution and report on it each year. Test results in local creeks are handled through that process, so we do not judge the permit by them. The yearly reports are not published as data we can read yet.
Violations the Water Board recorded
Listed as the Water Board recorded them.
Date
Type
What the Water Board recorded
Mar 11, 2019
Deficient BMP ImplementationClass 2
Failure to ensure Stormwater Control Plans have sufficiently demonstrated project design is in accordance with the PCRs, and failure to ensure regulated projects have implemented controls in accordance with the PCRs.
May 15, 2015
Deficient BMP ImplementationClass 2
Failure to implement and manage City facilities with industrial activities in support of 2013 General Permit Provision E.11 Pollution Prevention/Good Housekeeping
May 15, 2015
Deficient BMP ImplementationClass 2
Failure to conduct and report Landscape Analysis in support of the City's development review process.
May 15, 2015
Deficient BMP ImplementationClass 2
Failure to track applicable new and redevelopment projects that incorporated LID design principals and features pursuant to the Citys interim LID requirements.
May 15, 2015
Deficient BMP ImplementationClass 2
Failure to verify post-construction runoff controls are being maintained.
May 15, 2015
Deficient BMP ImplementationClass 2
Failure to inspect sites to verify post-construction requirements have been implemented.
May 15, 2015
Deficient BMP ImplementationClass 2
Failure to apply post-construction stormwater requirements to all applicable projects.
Oct 15, 2014
Deficient ReportClass 1
Deficient implementaton of three required elements of the Phase II Small MS4 General Permit sections..Q 39 -- E.10.a(ii)(a-h) ? (page 37)Q 83 -- E.12.j(ii)(a), (page 61) Q 85 -- E.12.k (page 62)The Water Board marks this violation as serious.
Enforcement actions
Notices, orders, and penalties the Water Board issued.
Date
Action
Details
Penalty
Mar 12, 2019
Notice of violation
Status: Historical
Feb 9, 2017
Notice of violation
Cites continuation of violation cited in 2/8/16 NOV - Violation of Provision E.12.j.ii.(b), for failure to complete changes to the Citys landscape code to effectively administer post-construction requirements. The City completed the Landscape Analyses as required by Provision E.12.j.ii.(a), but did not change the landscape code based on the results of the analysis.Status: Active
Feb 8, 2016
Notice of violation
Cites various failures to implement BMPs and requires several technical reports (with multiple due dates) and monthly reports on corrective actions.Status: Active
Jan 22, 2015
Staff enforcement letter
21Nov14-sent email on deficient answer to Question 83 on lanscape codes required by E.12.j22Jan15 - sent email requesting status on answering 3 deficient questions in Annual Report E.10.a, E.12.j, and E.12.k. (see attached email)Status: Active